Answers to Fourth Set of Interrogatories Re QA Welding Contention,Constituting Discovery 18
ML20083G651
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/28/1983
From: Corcoran J, Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
AIR AND WATER POLLUTION PATROL
References
NUDOCS 8401060357
Download: ML20083G651 (17)


Text

b s

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

Philadelphia Electric Company ) Docket Nos. 50-352

) 50-353 (Limerick Generating Station )

Units 1 and 2) )

APPLICANT'S ANSWERS TO INTERVENOR AWPP'S POURTH SET OF INTERROGATORIES ON QA/ WELDING CONTENTION r

DISCOVERY 18 DECEMBER 28, 1983 6

8401060357 831228 PDR O ADOCK 05000352 PM -

6 Intdrocatory No- 1 The following log numbers do not havo couplot. ion dates:

Please explain what activity was involved and why there is no completion date.

Loc Numbers Issued M.52.42 9/1/76 52.44 9/1/76 52.45 9/1/83 52.46 10/6/76 52.47 10/8/76 52.50 10/13/76 52.22 4/9/76 52.26 5/6/76 52.27 5/6/76 52.28 5/6/76 '

52.29 5/7/76 r

52.39 .7/21/76 M.52.3 cool spray 1/6/76 52.4 cool spray 1/9/76 52.5 2/3/76 52.9 3/4/76 52.10 3/4/76 52.14 4/2/76 l

l 52.15 4/2/76 52.20 _ 4/7/76 52.16.76 -

4/24/76

(

53.17 4/24/76 2

L

53.18 4/24/76 53.38 4/14/77 53.40 7/11/77 737 Sp Install Hangers 12/79 P 2.10 through 745, 753, 725, 726, 727 731--36 12/79 698, 713, 714, 688, 690 5/18/79 693, 658, 661, 662, 663, 665, 675, 617-624, 601, 609, 612-616, 538, 534

+ many more.

437 Install Hangers to 10/2/78 432, 413, 374, 335, 273, 256, 226, 217.

r M.344.2 Attach weld handers 12/20/75 Answer The attached list describes the inspection, test or work activity for each inspection log number listed in the Interrogatory. Since in many cases the inspection log numbers listed in the Interrogatory were incomplete, Applicant has listed the complete numbers which it believes were referred to in the Interrogatory.

l There is no. completion date on certain inspection log entries because the inspection activities required for items included in 3

r

~

the scope of that inspection record had not been completed at the time the log was made available. Inspection planning and the scoping of the inspection records started early in the project and is a continuing process. The work is performed in the l

sequences prescribed by construction schedules, and the final

. inspections are performed after the work is completed. The completion date is entered after the final inspections that are within the scope of the inspection record are completed.

Participants in Preparation of Answer c

J. S. Kemper, Vice President, Engineering & Resear'h Philadelphia Electric Company 2301 Market Street -

Philadelphia, PA 19101 J. M. Corcoran p Quality Assurance ,

Field Branch Head Philadelphia Electric Company 2301 Market Street Philadelphia, PA 19101 4

I e

  • k e

6 4

4 ATTACHMENT DISCOVERY 18 INTERROGATORY I j ., ,, ,,

LOG NUMBER ,, ,

ACTIVITY INVOLVEDi l M52-42 Valve & Component Installation M52-44 Valve & Componerte Installation M52-45 Pipe Installation & Rework

  • M52-46 Installation of Pipe Hangers M52-47 Pipe Installation & Rework M32-50 Pipe Installation & Rework M52-22 Installation of Pipe Hangers

., M52-26 Installation of Pipe Rangers M52-27 Installation of Pipe Hangers M52-28 Zeitallation of Pipe Hangers -

M52-29 Installation of Pipe Eangers M52-39 . Installation of Pipe Hangers

'M52-3 Installation of Core Spray Pumps .

M52-4 Installation of Core Spray Pumps M32-5 Attachment Welding of Hangers M52-9 Installation of Pip' Hangers M52-10 - Installation of Pipe Hangers .

M32-14 -

Pipe Installation & Rework M52-15 , Pipe Installation & Rework M52-20 Installation of Pipe Hangers M53-16 Pipe Installation & Rework M53-17 Pipe Installation & Rework M53-18 Pipe Installation & Rework N53-38 Pipe Installation & Rework M53-40 Pipe Installation & Rework M90-737 - Small Pipe Hanger Installation M90-738 . Small Pipe Hanger Installation M90-739 Small Pipe Hanger Installation M90-740 Small Pipe Hanger Installation N90-741 Small Pipe Hanger Installation M90-742 Small Pipe Hanger Installation M90-743 Small Pipe Hanger Installation M90-744 '

Small Pipe Hanger Installation M90-745 -- -

Small Pipe Fabrication & Installation H90-753 . Installation Small Pipe Hanger M90-725 Small Pipe Fabrication & Installation M90-726 Modification of Hanger M90-727 Installation Stiffner Plate '

. M90-731 small Pipe Hanger Installation M90-732 Small Pipa Hanger Installation M90-733 Small Pipe Hanger Installatton M90-734 Small Pipe Hanger Installation M90-735 Small Pipe Hanger Installation M90-736 Small Pipe Hanger Installation

0 Interrogatory I Attach =ent I

LOG NUMBER 40TIVITI INVOLVED /

, . . ~

/

, M90-698 Fabrication of small Pipe Hanger M90-713 Small Pipe Fabrication & Installation

190-714 -

small Pipe Fabrication & Installation ,

M90-688 Small Pipe Hanger Installation M90-690 Small Pipe Hanger Insita11ation M90-691 Small Pipe Ranger Installation M90-692 Small Pipe Ranger Installation H90-693 Small Pipe Hanger Installation M90-658 3 mall Pipe Hanger Installation M90-661 8 mall Pipe Hanger Installation M90-662 Small Pipe Hanger Installation M90-663 Small Pipe Ranger Installation M90-665 Installation of Hangers M90-675, Modification of flanger Installation -

M90-617 Small Pipe Hanger Installation M90-618 Small Pipe Hanger Installation

.~'

M90-619 Small Pipe Hanger Installation M90-620 , Sas11. Pipe Hanger Installation r M90-521 '" -

Small Pipe Hanger Installation '

, M90-622 . Small Pipe Hanger Installation -

M90-623 Installation of Pipe Hangers -

M90-624 -

M90-601

' Initial Setting of Rotating Equipment

  • M90-609 Small Pipe Hanger Installation '

M90-612 .

Small Pipe Hanger Installation M90-613 Small Pipe Hanger Installation M90-614 Small Pipe Hanger Installation -

M90-615 Small Pipe Hanger Installation H90-616 Small Pipe Hanger Installation M90-538 Installation Small Pipe Hangers M90-534 . Installation Small Pipe Rangers M90-437 . Installation Pipe Hangers

>* M90-432 Small Pipe Hanger Rework M90-413 Pipe Rework M90-374 - -

Small Pipe Fabrication & Rework M90-335 . Small Pipe Hanger Fabrication M90-273 Small Pipe Hanger Installation M90-256 Installation Pipe Hangers M90-226 Pipe Installation & Rework .

M90-217 Installation Pipe Hangers

  • M344-2 Attachmenc Welding of Hangers

InterroaatorY No. 2 Plea =3 provido the following full NCR's, and, questions asksd

. if any. (also indicate meaning of open and closed columns) . In each case show documentation as to how dispositioned.

yS,g Issued 3034 out of round 2980-p-301 welds bypassed N. Mallor (?) (no Q.C.) 11/29/77 C-63 2969 to 2973 non acceptable welds 11/23/77 2958 P.3 19 HBB 118-1-4 11/14/77 2940 no documentation of weld joint. 11/1/77 2888 M91AC incomplete weld rod cert. 9/30/77 '

2864 Discrepancies on B.V.L t

  1. L8979 9/20/77 2781 PID HB 3 118-H-50 Welds without documentation 2835 C-63 inaccessible weld FPGW on beam AZD7R 9/1/77 3346 to 3353 Reactor Crane parts welding defects, Nora; Baron; Gilbert How dispositioned?

3128 -

3/1/78 3130 out of round 5

l' l

1

3068 C-2 Cantainctnt Ponotration Dece.go 3056 3331 Glanski-Walters 10/4/78 3335 Reactor crane welding 3323 M-16 AC Reactor crane pts DOH 201 doesn ' t meet spec.

or drawing - How dispositioned?

3320 Weld damage - How dispositioned?

How were following welds damaged?

3308, 3309, 3310, 3311, 3312, 3313, 3314, 3315 3246-7/20/78 P105A Valve N041 F011A+B Missing Documentation and Radiograph film '

3191 Weld beams-no proper Documentation r

or QC surveillance 6/1/78 Containment 1475 (send report) 1/15/76 1477 P100A radiographs C-40 for weld #1 1366 Weld at wrong location (who was I

welder how corrected?)

1321 10/9/75 1229 (a) How many P318 rod waste

! spools were received? (b) How many had questionable welds?

(c) How many had been inspected?

6 1

4 How w ro walds inspscted?

Plo202 cupply svory radiograph that was quostioned and indicato how dispositioned.

3421 Lost QC document How dispostioned? 12/27/78 1125-26 (3/18/75) How was NCR Dispositioned?

1005-08 Inclusive 1/10/75-1/13/75 705-6 How corrected?

3646 Weld undercut - How dispositioned?

3513 4/4/79 3495 How dispostioned Supply NCR 3462 Supply NCR 3439 Supply NCR 3439 Supply NCR 6 How 1/10/79 dispositioned r 3449 Undersized welds on 19 1/22/79 pipes, 11 reopened 3/2/83 3432 Supply NCR 3709 Y Vernon' veld misalignment 8/14/79 closed by column-M. Orlando marked I

re-opened 3682 Supply NCR - How dispositioned? 7/25/79

~ -

3670 M Baron - How many welds l done before found out?

7 t

How vac it provon? Woro cny safety related? 7/20/79 995 12/23/74 3917 C-43 12/21/79 3918 Weld not traceable 12/21/79 3890 3892 C-72 Where are radiographs - Who welded it? What other welds did he do?

3841 3821 3756 Lack of weld fusion in pipe 9/20/79 3735 How misaligned weld corrected? 9/4/79 3411 Wrong size welds - How 12/13/78 dispositioned '

Please send reports:

r 1708 5/28/76 1693 5/19/76 1681 5/14/76 1686 5/11/76 why reopened 11/25/77 1648-49 4/26/76 why reopened 5/2/78 16196 Ferretti-Full report and 4/13/76 l 1620 affadavit i 1624 P 319-GBB 113 H15 Farretti 4/14/76 1

1612S Ferretti, 4/9/76

~

1613 -

1527 Send report 8

\

1865 How corrccted 8/23/76 1866 What defcct - How correctsd?

1856 How corrected - Affadavit R. Lundvall 1812 How corrected - Affadavit 7/22/76 J. Quinlan 1764 How closed - Affadavit 6/24/76 C. Turley 1734 Faretti-Want entire report 6/10/76 1732 Want entire report 6/10/76 1740 6/11/76 1726 Need report and why reopened and when closed?

1730 Need entire report Answer Copies of each NCR requested are available for inspection and copying (Discovery 18, Item 2) . The disposition of each NCR is documented on the NCR under Block Numbers 20 and 22. '

Regarding the additional questions on NCR's, Applicant responds as follows:

NCR 3308 There was no weld damage reported. The NCR reports welding deficiencies identified at receipt inspection.

l 3309 There is no weld damage reported. The NCR reports ' bent structural members and misdrilled holes 9

identified et rcccipt inspaction.

3310 There is no weld damage reported. The NCR reports velding defects identified by nondestructive examination.

3311 There was no weld damage reported. The NCR reports welding deficiencies identified at receipt inspection.

3312 There was no weld damage reported. The NCR reports welding deficiencies identified at receipt inspection.

3313 There was no weld damage reported. The NCR reports welding deficiencies and structural member mis-locations identified at receipt inspection.

r 3314 Thero is no weld damage reported. The NCR reports damage on the end of a pipe spool that appears to have occurred during handling and shipping, identified at receipt inspection.

I i

l 3315 There is no weld damage reported. The NCR reports fabrication errors on a pipe spool identified at receipt inspection.

1366 This NCR discusses a mislocated structural 10

e weld on a non-safety related hanger. The hanger has been subsequently deleted as a result of

, design changes.

1229 The NCR reports nonconforming welding con-ditions on non safety-related pipe spools

. identified at receipt inspection. The supolier involved did not supply any safety-related fabricated piping to Limerick.

3670 As stated on the NCR, the weld filler material was issued for one weld joint on a -

small safety-related pipe. The exact cir-r cumstances surround.ing the identification of this condition could not be ascertained at this time. The most probable methods are by finding the wrong weld filler material rod in use or by finding that the wrong filler material was issued from a review l of the filler material issuance documentation.

3892 The radiographs were taken to verify i that the,~specified welds were used. Since radiographs were not required for acceptance of these welds, the radiographs were not l

retained. These welds are structural 11 4

~

ctsol welde, and the AWS D1.1 code dons

.., not r quira traceability of the volder's identity to a particular weld.

1686 The conditions were initially identified on 5/17/76. The NCR was redispositioned as a result of a request by Applicant to Bechtel Power Corp. to further explain the dispositions. .

1648-Both of these NCR's were redispositioned

-49 and revised for the reasons stated on the full copies of the NCR*s which have been made available. The NCR's were actually re-closed on 5/2/78. 7 1726 The NCR was reopened to provide for placing the revision notes on Page 4 of the NCR and was re-closed on 7/18/77.

As to AWPP's request to be provided with every radiograph that was questioned, see Applicant's answer to Interrogatory 3 of Discovery 16.

Participants in Preparation of Answer J. S. Kemper, Vice-President, Engineering S Research Philadelphia Electric Company 2301 Market Street Philadelphia, PA 19101 12

, a J. B. Corcoran Quality Accuranco .

Field Branch Head '

Philadelphia Electric Company 2301 Market Street -*

Philadelphia, PA 19101 i

I

  • s . .-

O 13

, Interroaatory No. 3 We vill nt:d all inspsetion reports cigned by V. Forretti and affadavit that all Ferretti velds re-inspected. '

Answer Copies of inspection records for safety-related items on which this individual's signature or initials appear are available for inspection and copying (Discovery 18, Item 3) .

Safety related welds for which this individual performed the final inspections have been re-evaluated and appropriately dispositioned. See Discovery 14, Item 7.

Participants in Preparation of Answer J. S. Kemper, Vice President, Engineering & Research Philadelphia Electric Company 2301 Market Street Philadelphia, PA 19101 '

J. M. Corcoran Quality Assurance r Field Branch Head .

Philadelphia Electric Company 2301 Market Street Philadelphia, PA 19101 1

6 14

j.. . . -

4-COMMONWEALTH OF PENNSYLVANIA  :

ss COUNTY OF PHILADELPHIA  :

J. S. Kemper, being first sworn, deposes and states:

That he is Vice President of Philadelphia Electric Company, the Applicant herein; that he has read the foregoing Applicant's Answers to Intervenor AWPP's Fourth Set of Interrogatories on QA/ Welding and knows the contents thereof; and that the state-I ments and matters set forth therein are true and correct to the best of his knowledge, information and belief.

l .

t fu ~ S' k' _ L

, ,/ Vice Presidi$nt Subscribed and sworn to before me this ; ' ' day of December, 1983.

I

, I, < . '. i; - - -

Notary' Public JUDITH Y MANKUN Notary Public. Phifa.. Phila. Co.

My Commission Expires July 28.1987 l.

?