Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Erpip 4.3.3 Re Liquid Effluent Sampling & Analysis & Procedures Erpip 4.3.1 & Erpip 4.3.2
ML20083G559
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/16/1983
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20083G538 List:
References
PROC-831116-01, NUDOCS 8401060278
Download: ML20083G559 (13)


Text

I

, -4 e

ERPIP 4.3.1 Rev. 3 l . Ch.4 O  :

activate and assemble an additional OFMT (check as appropriate):

Helicopter Required: ( ) Required Gfyes) r

( ) Not. Required Gfno) I

- NOTE-h If no hencopter is required, N/A (not applicable) this step and immediately proceed to step 3.7.

l AdditionalOFMT Activated and Assembled: /

l Initials Time i

j 3.6.1 Request a briefing on the helicopter landing location and on present j ,

plant conditions from the RAD.

Hencopter Landing ' cation:

Estimated Time of Arrival:

Briefing Completed: /

Initiais Time

g 3.6.2 Obtain an EMERGENCY MONITORING KIT (MOBILE), and a radio suitable for use from a helicopter.

~4 Kit and Radio Obtained: /

j Initials Time .

- NOTE-I The Emergency Monitoring Kit (Mobile) can be obtained at the South Guard House.

k 3.6.3 Perform a quick equipment and radio check prior to proceeding (Use 3 ,

) Table 5 of Appendix B.1).

h Kit and Radio Checked /

1 Initiais Time i-B 3.6.4 Proceed to and meet the helicopter and establish radio contact with the RAD.

P Hencepter Landed: /

Initials Time Radio Contact Established: /

j Initiais Time j -NOTE-

] g Record all survey instructions and locations of survey points (Distance in miles

':1 t

. U 4.3.1-3 hhhD 0 1 F i

- - ----% - -m- w,w-ay g+-ey.

ERPIP 4.3.1' Rev.3

.Ch.4 )

i from the $1te and elevation or feet above ground level) on EXHIBIT 4.3.1-C, J

MONITORING TEAM ACTION FORM.

3.6.5 Proceed, as directed by the RAD, to the locations to be surveyed.

Initiated AerialSurvey: /

Initials Time ,

-CAUTION-MAINTAIN A MNIMUM ELEVATION OF 100 FEET ABOVE GROUND LEVEL WHEN SURVEYING. .

3.7 Continuously monitor the general area.

~

Monitoring of Area Proceeding: /

Initials Time

-NOTE-Record all survey data and results of the analyses on EXHIBITS 4.3.1-D, EXPOSURE RATE FORM, and 4.3.1-E, MONITORING TEAM SURVEY FORM. as specified. Additional actions / comments can be entered on EXHIBIT 4.3.1-C.

3.7.1 Using equipment shielded against Beta radiation G.e. closed window) traverse the plume In the crosswind direction, determine the maximum i' mR/h, and record that reading, tim 4 the reading was taken, and the l

sector / distance. .

Exposure Rate (mR/h): Time Reading Was Taken:

f.

Sector / Distance: /

l

' Initials Time

- NOTE -

Ch.4 Vehicle must be running while taking air sample.

3.7.2 Place a particulate filter and a charcoal cartridge in the air sampler and collect a 30 liter sample at the location where the mR/h reading was the highest (found during the traverse).

Sample Initiated: / -

Initials Time 3.7.3 While collecting the sample, report the specific survey location and l-i results of the gamma exposure rate survey to the RAD.

! Results Reported: /

Inittais Time 3.7.4 Contact the RAD (by radio) to locate a low background area to be used l

for counting and proceed to the area specified.

l 4.3.1 4

l

. i

,4

- I

. ~

. \1 . . . . . .

, .%, ' . . . '. ..., , g

  • . -.s . . . . .
  • .s.* :t I

l

.,t 4*s i

.- - . . . . .- . .- . ....s. . - .

,g

' l f.

f h

.ERPIP 4 3.1 REVIEW /APPROVM, REVISION CHANGE REVIEWER SIG/ SUPERVISOR POSRC -PLANT SUPERINTENDENT l EPU SIC /DATE MTG /DATE 2 DATE.

% l $6%.i.a Mm '?Z, 9/- /fL i0/s/s

{l S R Yud0.n4IWW;wd7h -n m 1a L.ua nI&2 i e s V4t *WE Pb8,as ss-as 2 aL duta i

r -

.a 4. .

, a gy16ii.,c.e n.m-- o n , , D ,s s i a e

4 6

. me

(; y ..

. ..:- . s e

4

=

e e .

f.

U O

I L

l "

r

!5

l.
  • I O

!4 5

,s

  • r_ I s

I d' p

. 1-G 4

. S 0

?

. .:1, -e . .

- .. 9 , , , , ,. -  ;-,,, ,

g ,-,vy-, -er -r~, y,e-.e-e-tw -------.-,-mw,- .,we.- e------- . - - - - - ,=m...-----+w,= - - - - - - - - - - - - - - * --

e .

ERPIP 4.3.*

Rev.8 Ch.4 IJ57 OF EFFECTIVE PAGES .

PAGE NUMBER REVISION 4.3.1-1 8, Change 3 .

4.3.1-2 8, Change 3 4.3.1-3 8, Change 4 4.3.1-4 3, Change 4 4.3.1-3 3 4.3.1-6 3 4.3.1-7 3, Change 2 4.3.1-8 4 4.3.1-9 4 4.3.1-10 8 s

- (,

i

\

1 e

1 9

9 4

f' , ERPIP 4.3.2

' Rcv. 8

f. C,h.4

~

cc location.

~

Exposure Rate (mR/h): Time Reading Was Taken:

Location: /

Initials Time .

- NOTE - ,

Ch. -

y_

Vehicle must be running while taking air sample. 4 3.6.2 Place a particulate filter and a charcoal cartridge in the air sampler

}

i and collect a 50 liter sample at the location where the mR/h reading was the highest (found during the traverse),

Sample Initiated: /

f

- Initials Time 3

$- 3.6.3 While collecting the sample, report the specific location and results of the gamma exposure rate survey to the RPD.

f /

Exposure Rate Reported:

Initials Time

. 3.6.4 After collecting the air sample, record the time completed and place the charcoal cartridge and the particulate filter in separate plastic

' bags and mark them for later identification. , ,

Actual Sample Size (cc):

- Sample Completed: /

j

- Initials Time 3.6.5 Contact the RPD (by radio) to locate a low background area to be 3

! used foe counting and proceed to that location. While en route, backflush the charcoa1 cartridge only with three cubic feet of

[;

u j' uncontaminated air.

If 3.6.6 Set up the MS-2 and SPA-3 sample counting equipment.

H u 3.6.7 Verify that control adjustments are per instructions in the Emergency

- Kit, then run a two minute background count and record results.

B Background Counts (cpm):

! Background Recorded: /

" initials Time i Set the detector directly on the inlet side of the charcoal cartridge, fl 3.6.8 I count for two minutes and record the results.

Gross Counts (cpm): , _ _ .

'. v' Cartridge Counted and Recorded: /

Initials Time f! Determine the charcoal activity by the following formula and record l 3.6.9 i

(

4.3.2- 3

.$- , , , , wj ,-- cyg---m m,,----.--p.-- --,- --- g.,,.,--,wy ,.--p,.-p--- -.,, .u ,.p,_

- , - , -.- . mwwm -i---,t -- -----m-- >r-r-- - _w-a ---a.- --m- - - -- ---=

ERP!P NO. 4.3.2 / REV. 7 DATE: January 20, 1982' results:

Charcoal Activity (uC1/cc.) =

Gross Counts - Backstround counts ,

(Counting Minutes) (Actual Sample Volume (cc)X2.22E6)(Efficiency) . 1 Use the efficiency listed on the scaler.

= _ microcuries/cc 3.6.10 Record the standard procedures utilized, any exceptions taken, specific Instruments used and corrections for flow rates applied.

Specific Location:

Standard Procedures Used:

Exception to Procedures:

Instruments Used:

(Serial No. or ID No.):

Corrections Applied for Flow Rates:

Recorded: /

Imtials Time 3.6.11 Report the specific survey location and charcoal activity (Steps 3.6.3 "

de 3.6.9) to the RPD.

Results Reported: /

Initials Time i 3.6.12 Ask RPD If a silver zeolite cartridge air sample should be collected.

If directed by RPD to do so, Repeat steps,3.6.1 through 3.6.10 using a j silver zeollte Instead of charcoal cartridge. Report the specific I survey location and silver zeolite activity to the RPD.

Results Reported: /

f Initials Time 3.7 Perform additional surveys as directed by the RPD as follows:

-NOTE-Based on field exposure rate measurements, take air samples starting as near

.o the center of the plume as possible.

3.7.1 Repeat Step 3.6 using charcoal cartridges unless directed otherwise by the RPD (3 or 4 passes across the plume should be optimum).

I Record data on EXHIBITS 4.3.1-D and E.

I e

4.3.2-4 L _ _ _ _ _ ._ _ . _ _ _ _ . - __ _ -

, s . 3 I

O _

I ERP1P 4.3.2 REVIIW/ APPROVAL h  :

CHANGE REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT REVISION DATE EPU SIG/DATE MTG /DATE f L pr%A:$" %jdlWl# S2.tlA 0 0 SinJ) l) O YL-t 1 GP+1'imest}022$s ahd 82 141  % O n A kr g 3 V4f:_ tom 6%YNI$ d.t.k's'83-126 UU iclu'ht I

f 'l  ;% sen[ $$$r 11. it..n $2-/W NlLA uhthO

/

e 1

l -

i .

i

) .

i .

i

'I i

4 i

ERP!P 4.3.2 -

Reiv.S.

Ch.4 -

UST OF EFFECTIVE PAGES PAGE NUMBER REVISION

'. I 4.3.2 1 3, Ch. 3 4.3.22 3, Ch. 3 4.3.2-3 3, Ch. 4 4.3.2-4 7 4.3.25 8, Ch. 2 4.3.2-6 1 4.3.2-7 1 s

O e

S 4

.,, . m.~. . - _ ,.. .,, - - , . , . - - - - , , , _ . , . . - . - . - . ,, , , . - . - . . - ~ ,

ERPIP 4.3.3

- Rcv. 9 i

f LIQUID EFFLUENT SAMPLING AND ANALYSIS .

l 9

I RESPONSIBLE INDIVIDUAL: Liquid Release Monitoring Team j

1 CONDITIONS: As directed by the CD or PS.

D ACTIONS:

3 1

1. OBTAIN briefing from CD, PS and/or the person you replace.

' -CAUVON-c While proceeding through areas of unknown radioactivity j ievels, continuously monitor to ensure safety.

i*

2. OBTAIN sampling equipment for two 500 cc circ water samples from the Rad-Chem

- Lab or mobile backup lab (trailer).

l.

l.

1 0

3. PRMD to cire water discharge duct; 1

i Remove the grating, and COLLECT a 500 cc dip sample of water.

] >

! - NOTE -

d) Use Attachment 1, Monitoring Team Action, to record Q

radioactivity / contamination levels, sampling actions and 1 results.

n R 4. RECORD the date, time and specific location where the sample was obtained.

it li

5. AT the Intake Structure, COLLECT a 500 cc dip sample from the screen back-wash 0

(j , trough.

u .

n

!5

,I 6. RECORD the date, time, and specific location where the sample was obtained, fI ;

]

1

~ - --- __- - - . . - - . . . - _ - _ . _. . _ _ _ _ _ _ _ _ _

. ERPIP 4.3.3 Rev.9

7. AT the Rad-Chem Lab or the mobile backup lab (trailer),

ANALYZE each sample In accordance with RCP-2-102.

8. RECORD the results of each analysis and REPORT this information to the CD/PS. I
9. PORWARD this checklist and all records related to this emergency response to the Supervisor-Emergency Planning.

J I

4 2of2

  • ERP!P 4.3.3 Rsv. 9 2 - - ATTACHMENT 1 iQ*2 MONITORING TEAM ACTION TEAM: DATE:

t ,

it 1

i Mme Action Taken/DATE Initials Findings l4 9

I t

t

'e u.

I, U

H. tn, .,

0 6

1 p}

':h fI o

f:

lf I'i.

2.

I .i,

-e

~

.3
r. .

t IA

!.1 a

'.i j ;8 -

. -.i l *I i

-,,,,,-,n,,,,,____.-,,s-,u,,, , , , -, . _, , , _ - , , , _ . , , _ . - - _ , _ , , , , , _ _ , , ,

e s .

~*

!O . .

i i

l ERP!P 4.3,3 BEvIIw/;,pppovAL l

I REVISION CHANGE REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT DATE ,

EPU SIG/DATE MTG /DATE 9 -

kfA/ n+83 %ff ,i.e.a 73.xs-- o ct O ,.i,,ir, y

  • i 4

o 4

n S

i i

  • 9 O

4 em 6

.~

e

?

e

A aex - -e - & -- 1-- n M d ERPIP 4.3.3 Rev. 9.

UST OF EFFECTIVE PAGES s.

PAGE NUMBER REVISION 1 9 2 9 ATTACHMENT REVISION 1 9 1