MONTHYEARML20211K0641999-09-0101 September 1999 Proposed Tech Specs,Changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2,correcting Dc Voltage & Degraded Voltage Settings in SR 3.3.6.2 & Correcting Typo in TS 5.6 ML20211G7681999-08-27027 August 1999 Proposed Tech Specs,Allowing Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities While Irradiated Fuel Assembly Movement Continues in SFP ML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20195B2751999-03-31031 March 1999 Rev 0 to Rept 98-FSW-021, Corrosion Test of SG Tubes with Alloy 800 Mechanical Sleeves ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20196E2191998-11-30030 November 1998 Proposed Tech Specs,Allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 Repair Sleeves ML20195K3831998-11-20020 November 1998 Proposed Tech Specs Removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section XI, Subsections IWE & Iwl,Per 10CFR50.55a ML20195J7181998-11-19019 November 1998 Proposed Tech Specs 3.7.6, SWS, Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20155F7001998-10-30030 October 1998 Proposed Tech Specs Bases,Revs 1,2 & 3 Re List of Effective Pages for Plant ML20154N1961998-10-16016 October 1998 Proposed Tech Specs Pages,Revising TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20236S5621998-07-20020 July 1998 Proposed Tech Specs Providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20195B2861998-06-0505 June 1998 Rev 0 to Rept 98-TR-FSW-005, Test Rept on Alloy 800 Mechanical Sleeve-Addl Qualification Testing Using Low Yield Strength Tubing ML20217D2691998-04-21021 April 1998 Proposed Tech Specs Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging ML20216H0831998-03-16016 March 1998 Rev 13 to Proposed TS Re Conversion to Improved TSs ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20199J5281998-01-28028 January 1998 Proposed Tech Specs,Converting to Improved TSs ML20198K9851998-01-12012 January 1998 Rev 11 to Proposed Tech Specs,Reflecting Conversion to Improved Sts,Per NUREG-1432 ML20198R7331997-11-0505 November 1997 Proposed Tech Specs Pages Re Rev 10 to Convert to Improved TS ML20217K6161997-10-23023 October 1997 Proposed Tech Specs Section 3.8 Re Change Request to Convert to Improved Std TSs ML20217K6671997-10-22022 October 1997 Proposed Tech Specs Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20198K3321997-10-20020 October 1997 Proposed Tech Specs Section 3.3 Re Change Request to Convert to Improved Std TSs ML20217G3571997-10-0606 October 1997 Proposed Tech Specs Section 3.6 to Reflect Conversion to Improved STS ML20217G3781997-10-0606 October 1997 Proposed Tech Specs Section 3.7 Re Change Request to Convert to Improved STS ML20211J2751997-10-0202 October 1997 Proposed Tech Specs,Reflecting New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20217C7361997-09-29029 September 1997 Proposed Tech Specs Page Omitted from 970609 License Amend Request Re Conversion to Improved TSs ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20210T8701997-09-10010 September 1997 Proposed Tech Specs Rev 5 to Section 3.4 of Original License Amend Application & Other Changes Identified by Personnel ML20210K9711997-08-14014 August 1997 Proposed Tech Specs,Reflecting Removal of TSTF-115,as Well as Other Changes Identified by Plant Personnel ML20149H5821997-07-21021 July 1997 Rev 2 to TS Sections 4.0 & 5.0,converting to Improved Std Tss,Per NUREG-1432 ML20148P7171997-06-27027 June 1997 Proposed Tech Specs Revising Wording to Support Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20141G4471997-06-16016 June 1997 Ccnpp Unit 2 Cycle 12 Startup Testing Rept ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20135F0441997-03-0606 March 1997 Proposed Tech Specs,Superceding Previously Submitted Marked Up Pp for ABB-CE Sleeves.New Info to Be Incorporated in Updated Licensing rept,CEN-630-P,Rev 01, Repair of 3/4 OD SG Tubes Using Leak Tight Sleeves ML20134E3221997-02-0303 February 1997 Proposed Tech Specs for Vol 16,Unit 1 Current Markup Improved Conversion License Amend Request ML20134E3361997-02-0303 February 1997 Proposed Tech Specs Vol 17,Unit 2 Current Markup Improved Conversion License Amend Request ML20134D3041997-01-31031 January 1997 Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20135A5231996-11-26026 November 1996 Proposed Tech Specs Adopting Option B of 10CFR50,App J to Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20134N1831996-11-20020 November 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20128Q8041996-10-14014 October 1996 Cycle 13 Summary of Startup Testing ML20128H6031996-10-0303 October 1996 Proposed Tech Specs,Changing Provisions for Receiving, Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7991996-09-10010 September 1996 Proposed Tech Specs 3/4.3 Re instrumentation,3/4.5 Re ECCS & 3/4.6 Re Containment Sys ML20117L3441996-09-0404 September 1996 Proposed Tech Specs Clarifying License Amend Request Re Implementation of Changes to Radiological Effluent TSs as Proposed by GL 89-01 ML20116F8281996-08-0101 August 1996 Proposed Tech Specs Re Use of Blind Flanges in Place of Containment Purge Valves During Operation ML20116E3771996-07-26026 July 1996 Proposed Tech Specs Allowing Repair of Defective SG Tubes by Electrosleeving ML20117F6431996-05-15015 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls ML20101K6011996-03-28028 March 1996 Proposed TS Figure 3.1.1-1 Re Change to Moderator Temp Coefficient 1999-09-01
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20095G7841995-10-12012 October 1995 Change 95-086 to Rev 4 to Technical Procedure CP-217, Specs & Surveillance:Secondary Chemistry ML20095G7621995-09-27027 September 1995 Rev 2 to Administrative Procedure NO-1-106, Functional Evaluation/Operability Determination ML20095G7771995-05-23023 May 1995 Rev 0 to Administrative Procedure RM-1-103, Commitment Mgt ML20095G7661995-02-27027 February 1995 Rev 3 to Administrative Procedure QL-2-100, Issue Reporting & Assessment ML20078A3611995-01-18018 January 1995 Change 5 to Rev 0,to Program Plan for Second Insp Interval for Plant,Units 1 & 2 ML20072T4141994-08-29029 August 1994 Rev 0,Change 1 to Emergency Response Plan Implementation Procedure,Erpip 203.Change Replaces Entire Procedure ML20072T3741994-08-29029 August 1994 Rev 1,Change 3 to Emergency Response Plan Implementation Procedures,Erpip 201.Rev Replaces Pages 3 & 4 & Review/ Approval Page ML20095G7781994-08-19019 August 1994 Rev 0 to Administrative Procedure MN-3-111, Erosion/ Corrosion Monitoring of Secondary Piping ML20064F2221993-09-0101 September 1993 Rev B/Change 1 to Calvert Cliffs Instruction CCI-803, Radioactive Matls Mgt ML20064F2011993-08-26026 August 1993 Rev 1,Change 0 to Odcm ML20095G7551993-08-11011 August 1993 Rev 0 to Administrative Procedure NS-1-300, Industry Operating Experience Info Processing ML17179A8601993-03-12012 March 1993 Rev 1/Change 0 to LCM-11S, Component Level Itlr Screening Procedure for Structures. ML20044C5291993-03-0101 March 1993 Rev 4/Change 0 to LCM-11, Life Cycle Mgt Component Level Itlr Screening Procedure for Sys. ML20056F5701993-02-18018 February 1993 Rev 0 to Change 1 to Odcm ML20118A8241992-09-18018 September 1992 Technical Criteria & Procedures Used for Generation of In- Structure Response Spectra ML20091N3031992-01-0606 January 1992 Rev 10 to Support Procedures - Media Response Procedure ERPIP-B.2, Off-Site Survey Points. Rev Deletes Photographs of off-site Points ML20077R2701991-08-31031 August 1991 Rev 2 to Calvert Cliffs Nuclear Power Plant Fitness-for-Duty Manual ML20058E5571990-10-29029 October 1990 Rev 5 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program ML20059H2871990-09-0707 September 1990 Rev 4 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program ML20044B0421990-07-13013 July 1990 Rev 3 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. ML20042E8291990-04-30030 April 1990 Rev 2 to Calvert Cliffs Performance Improvement Plan Implementation Program. ML20042G3771990-04-16016 April 1990 Changes 1-3 to Rev 0 to Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Plant,Units 1 & 2. ML19332F3041989-12-0808 December 1989 Rev 3 to Surveillance Test Procedure STP-M-662-2, Integrated Leak Rate Test,Unit 2 Containment. ML20246L7641989-08-14014 August 1989 Corrected Pages for Substitution Into Performance Improvement Plan (PIP) Implementation Program & Table 1.4 Which Sorts PIP Action Plans by Root Cause & Updated Schedule & Resource Summaries ML20247M5741989-07-31031 July 1989 Performance Improvement Plan Implementation Program ML20248H8121989-04-30030 April 1989 Performance Improvement Plan ML20204G5821988-09-26026 September 1988 Rev 1 to ASME Section XI Pump & Valve Test Programs-Units 1 & 2 Second 10-Yr Interval ML20029A7671988-07-27027 July 1988 Rev 1 to Chemistry Procedure CP 607, Offsite Dose Calculation Manual. ML20154J0991988-02-10010 February 1988 Operating Manual;Emergency Operating Procedures ML20148L6431987-11-30030 November 1987 Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20239A0561987-02-28028 February 1987 Operating Procedure OP-17-60-016-0, Ultrasonic Thickness Measurement Piping Using Swri Thickness Data Acquisition Sys ML20205P4611986-12-31031 December 1986 Rev 0 to ASME Section XI Pump & Valve Test Programs - Units 1 & 2,Second 10-Yr Interval ML20198H4271986-03-26026 March 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to Erpip 4.1.3, Technical Support Ctr Roster, Rev 9 to Erpip 4.1.4, OSC Roster & Rev 10 to Erpip 4.1.17, Security. W/860522 Release Memo ML20198C5061985-11-0101 November 1985 Supplemental Program Plan for Dcrdr ML20138A3931985-09-20020 September 1985 Rev 9 to Emergency Response Plan Implementation Procedure Erpip 5.0, Preparation & Control of Emergency Response Plan & Implementation Procedures ML20236U2791985-08-0505 August 1985 Rev 3 to Operating Procedure X-FE-101-3, Onsite NDE Records Control ML20090B5881984-05-0202 May 1984 Public Version of Revised Emergency Response Plan Implementation Procedures,Including Rev 10 to Erpip 4.1.17, Rev 9 to Erpip 5.4 & Rev 2 to Erpip A.2 ML20090B6891984-04-18018 April 1984 Public Version of Rev 15 to Emergency Response Plan Implementing Procedure Erpip A.1, Emergency Organization Telephone Numbers ML20087F2591984-03-14014 March 1984 Instruction CCI-310, Emergency Operating Procedure Writers Guide. Emergency Operating Plan Validation/Verification Plan & Training Plan Encl ML20155H2161984-02-20020 February 1984 Remote I/O Equipment Hardware Acceptance Test Procedure for NUS Corp/Bg&E Calvert Cliffs Data Acquisition Sys ML20106H1901984-02-0202 February 1984 Remote I/O Hardware Acceptance Test Procedure for NUS Corp/Bg&E Calvert Cliffs Data Acquisition Sys at Computer Products,Inc 1999-06-01
[Table view] |
Text
I
, -4 e
ERPIP 4.3.1 Rev. 3 l . Ch.4 O :
activate and assemble an additional OFMT (check as appropriate):
Helicopter Required: ( ) Required Gfyes) r
( ) Not. Required Gfno) I
- NOTE-h If no hencopter is required, N/A (not applicable) this step and immediately proceed to step 3.7.
l AdditionalOFMT Activated and Assembled: /
l Initials Time i
j 3.6.1 Request a briefing on the helicopter landing location and on present j ,
plant conditions from the RAD.
Hencopter Landing ' cation:
Estimated Time of Arrival:
Briefing Completed: /
Initiais Time
- g 3.6.2 Obtain an EMERGENCY MONITORING KIT (MOBILE), and a radio suitable for use from a helicopter.
~4 Kit and Radio Obtained: /
j Initials Time .
- - NOTE-I The Emergency Monitoring Kit (Mobile) can be obtained at the South Guard House.
k 3.6.3 Perform a quick equipment and radio check prior to proceeding (Use 3 ,
) Table 5 of Appendix B.1).
h Kit and Radio Checked /
1 Initiais Time i-B 3.6.4 Proceed to and meet the helicopter and establish radio contact with the RAD.
P Hencepter Landed: /
Initials Time Radio Contact Established: /
j Initiais Time j -NOTE-
] g Record all survey instructions and locations of survey points (Distance in miles
':1 t
. U 4.3.1-3 hhhD 0 1 F i
- - ----% - -m- w,w-ay g+-ey.
ERPIP 4.3.1' Rev.3
.Ch.4 )
i from the $1te and elevation or feet above ground level) on EXHIBIT 4.3.1-C, J
MONITORING TEAM ACTION FORM.
3.6.5 Proceed, as directed by the RAD, to the locations to be surveyed.
Initiated AerialSurvey: /
Initials Time ,
-CAUTION-MAINTAIN A MNIMUM ELEVATION OF 100 FEET ABOVE GROUND LEVEL WHEN SURVEYING. .
3.7 Continuously monitor the general area.
~
Monitoring of Area Proceeding: /
Initials Time
-NOTE-Record all survey data and results of the analyses on EXHIBITS 4.3.1-D, EXPOSURE RATE FORM, and 4.3.1-E, MONITORING TEAM SURVEY FORM. as specified. Additional actions / comments can be entered on EXHIBIT 4.3.1-C.
3.7.1 Using equipment shielded against Beta radiation G.e. closed window) traverse the plume In the crosswind direction, determine the maximum i' mR/h, and record that reading, tim 4 the reading was taken, and the l
sector / distance. .
Exposure Rate (mR/h): Time Reading Was Taken:
f.
Sector / Distance: /
l
' Initials Time
- NOTE -
Ch.4 Vehicle must be running while taking air sample.
3.7.2 Place a particulate filter and a charcoal cartridge in the air sampler and collect a 30 liter sample at the location where the mR/h reading was the highest (found during the traverse).
Sample Initiated: / -
Initials Time 3.7.3 While collecting the sample, report the specific survey location and l-i results of the gamma exposure rate survey to the RAD.
! Results Reported: /
Inittais Time 3.7.4 Contact the RAD (by radio) to locate a low background area to be used l
for counting and proceed to the area specified.
l 4.3.1 4
l
. i
,4
- I
- . ~
. \1 . . . . . .
, .%, ' . . . '. ..., , g
l
.,t 4*s i
.- - . . . . .- . .- . ....s. . - .
,g
' l f.
f h
.ERPIP 4 3.1 REVIEW /APPROVM, REVISION CHANGE REVIEWER SIG/ SUPERVISOR POSRC -PLANT SUPERINTENDENT l EPU SIC /DATE MTG /DATE 2 DATE.
% l $6%.i.a Mm '?Z, 9/- /fL i0/s/s
{l S R Yud0.n4IWW;wd7h -n m 1a L.ua nI&2 i e s V4t *WE Pb8,as ss-as 2 aL duta i
r -
.a 4. .
, a gy16ii.,c.e n.m-- o n , , D ,s s i a e
4 6
. me
(; y ..
. ..:- . s e
4
=
e e .
f.
U O
I L
l "
r
!5
- l.
!4 5
,s
I d' p
. 1-G 4
. S 0
?
. .:1, -e . .
- .. 9 , , , , ,. - ;-,,, ,
g ,-,vy-, -er -r~, y,e-.e-e-tw -------.-,-mw,- .,we.- e------- . - - - - - ,=m...-----+w,= - - - - - - - - - - - - - - * --
e .
ERPIP 4.3.*
Rev.8 Ch.4 IJ57 OF EFFECTIVE PAGES .
PAGE NUMBER REVISION 4.3.1-1 8, Change 3 .
4.3.1-2 8, Change 3 4.3.1-3 8, Change 4 4.3.1-4 3, Change 4 4.3.1-3 3 4.3.1-6 3 4.3.1-7 3, Change 2 4.3.1-8 4 4.3.1-9 4 4.3.1-10 8 s
- (,
i
\
1 e
1 9
9 4
f' , ERPIP 4.3.2
' Rcv. 8
- f. C,h.4
~
cc location.
~
Exposure Rate (mR/h): Time Reading Was Taken:
Location: /
Initials Time .
- NOTE - ,
Ch. -
y_
Vehicle must be running while taking air sample. 4 3.6.2 Place a particulate filter and a charcoal cartridge in the air sampler
}
i and collect a 50 liter sample at the location where the mR/h reading was the highest (found during the traverse),
Sample Initiated: /
f
- Initials Time 3
$- 3.6.3 While collecting the sample, report the specific location and results of the gamma exposure rate survey to the RPD.
f /
Exposure Rate Reported:
Initials Time
. 3.6.4 After collecting the air sample, record the time completed and place the charcoal cartridge and the particulate filter in separate plastic
' bags and mark them for later identification. , ,
Actual Sample Size (cc):
- Sample Completed: /
j
- Initials Time 3.6.5 Contact the RPD (by radio) to locate a low background area to be 3
! used foe counting and proceed to that location. While en route, backflush the charcoa1 cartridge only with three cubic feet of
[;
u j' uncontaminated air.
If 3.6.6 Set up the MS-2 and SPA-3 sample counting equipment.
H u 3.6.7 Verify that control adjustments are per instructions in the Emergency
- Kit, then run a two minute background count and record results.
B Background Counts (cpm):
! Background Recorded: /
" initials Time i Set the detector directly on the inlet side of the charcoal cartridge, fl 3.6.8 I count for two minutes and record the results.
Gross Counts (cpm): , _ _ .
'. v' Cartridge Counted and Recorded: /
Initials Time f! Determine the charcoal activity by the following formula and record l 3.6.9 i
(
4.3.2- 3
.$- , , , , wj ,-- cyg---m m,,----.--p.-- --,- --- g.,,.,--,wy ,.--p,.-p--- -.,, .u ,.p,_
- , - , -.- . mwwm -i---,t -- -----m-- >r-r-- - _w-a ---a.- --m- - - -- ---=
ERP!P NO. 4.3.2 / REV. 7 DATE: January 20, 1982' results:
Charcoal Activity (uC1/cc.) =
Gross Counts - Backstround counts ,
(Counting Minutes) (Actual Sample Volume (cc)X2.22E6)(Efficiency) . 1 Use the efficiency listed on the scaler.
= _ microcuries/cc 3.6.10 Record the standard procedures utilized, any exceptions taken, specific Instruments used and corrections for flow rates applied.
Specific Location:
Standard Procedures Used:
Exception to Procedures:
Instruments Used:
(Serial No. or ID No.):
Corrections Applied for Flow Rates:
Recorded: /
Imtials Time 3.6.11 Report the specific survey location and charcoal activity (Steps 3.6.3 "
de 3.6.9) to the RPD.
Results Reported: /
Initials Time i 3.6.12 Ask RPD If a silver zeolite cartridge air sample should be collected.
If directed by RPD to do so, Repeat steps,3.6.1 through 3.6.10 using a j silver zeollte Instead of charcoal cartridge. Report the specific I survey location and silver zeolite activity to the RPD.
Results Reported: /
f Initials Time 3.7 Perform additional surveys as directed by the RPD as follows:
-NOTE-Based on field exposure rate measurements, take air samples starting as near
.o the center of the plume as possible.
3.7.1 Repeat Step 3.6 using charcoal cartridges unless directed otherwise by the RPD (3 or 4 passes across the plume should be optimum).
I Record data on EXHIBITS 4.3.1-D and E.
I e
4.3.2-4 L _ _ _ _ _ ._ _ . _ _ _ _ . - __ _ -
, s . 3 I
O _
I ERP1P 4.3.2 REVIIW/ APPROVAL h :
CHANGE REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT REVISION DATE EPU SIG/DATE MTG /DATE f L pr%A:$" %jdlWl# S2.tlA 0 0 SinJ) l) O YL-t 1 GP+1'imest}022$s ahd 82 141 % O n A kr g 3 V4f:_ tom 6%YNI$ d.t.k's'83-126 UU iclu'ht I
f 'l ;% sen[ $$$r 11. it..n $2-/W NlLA uhthO
/
e 1
l -
i .
i
) .
i .
i
'I i
4 i
ERP!P 4.3.2 -
Reiv.S.
Ch.4 -
UST OF EFFECTIVE PAGES PAGE NUMBER REVISION
'. I 4.3.2 1 3, Ch. 3 4.3.22 3, Ch. 3 4.3.2-3 3, Ch. 4 4.3.2-4 7 4.3.25 8, Ch. 2 4.3.2-6 1 4.3.2-7 1 s
O e
S 4
.,, . m.~. . - _ ,.. .,, - - , . , . - - - - , , , _ . , . . - . - . - . ,, , , . - . - . . - ~ ,
ERPIP 4.3.3
- Rcv. 9 i
f LIQUID EFFLUENT SAMPLING AND ANALYSIS .
l 9
I RESPONSIBLE INDIVIDUAL: Liquid Release Monitoring Team j
1 CONDITIONS: As directed by the CD or PS.
D ACTIONS:
3 1
- 1. OBTAIN briefing from CD, PS and/or the person you replace.
' -CAUVON-c While proceeding through areas of unknown radioactivity j ievels, continuously monitor to ensure safety.
i*
- 2. OBTAIN sampling equipment for two 500 cc circ water samples from the Rad-Chem
- Lab or mobile backup lab (trailer).
l.
l.
1 0
- 3. PRMD to cire water discharge duct; 1
i Remove the grating, and COLLECT a 500 cc dip sample of water.
] >
! - NOTE -
d) Use Attachment 1, Monitoring Team Action, to record Q
radioactivity / contamination levels, sampling actions and 1 results.
n R 4. RECORD the date, time and specific location where the sample was obtained.
it li
- 5. AT the Intake Structure, COLLECT a 500 cc dip sample from the screen back-wash 0
(j , trough.
u .
n
!5
,I 6. RECORD the date, time, and specific location where the sample was obtained, fI ;
]
1
~ - --- __- - - . . - - . . . - _ - _ . _. . _ _ _ _ _ _ _ _ _
. ERPIP 4.3.3 Rev.9
- 7. AT the Rad-Chem Lab or the mobile backup lab (trailer),
ANALYZE each sample In accordance with RCP-2-102.
- 8. RECORD the results of each analysis and REPORT this information to the CD/PS. I
- 9. PORWARD this checklist and all records related to this emergency response to the Supervisor-Emergency Planning.
J I
4 2of2
- ERP!P 4.3.3 Rsv. 9 2 - - ATTACHMENT 1 iQ*2 MONITORING TEAM ACTION TEAM: DATE:
t ,
it 1
i Mme Action Taken/DATE Initials Findings l4 9
I t
t
'e u.
I, U
H. tn, .,
0 6
1 p}
':h fI o
f:
lf I'i.
2.
I .i,
-e
~
- .3
- r. .
t IA
!.1 a
- '.i j ;8 -
. -.i l *I i
-,,,,,-,n,,,,,____.-,,s-,u,,, , , , -, . _, , , _ - , , , _ . , , _ . - - _ , _ , , , , , _ _ , , ,
e s .
~*
!O . .
i i
l ERP!P 4.3,3 BEvIIw/;,pppovAL l
I REVISION CHANGE REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT DATE ,
EPU SIG/DATE MTG /DATE 9 -
kfA/ n+83 %ff ,i.e.a 73.xs-- o ct O ,.i,,ir, y
o 4
n S
i i
4 em 6
.~
e
?
e
A aex - -e - & -- 1-- n M d ERPIP 4.3.3 Rev. 9.