ML20083G693

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 83-42 Re Thermowells in Rcs. Initially Reported on 830629.Time Extension Until 840105 for Final Rept Requested
ML20083G693
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/30/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28320-BSK, DER-83-42, NUDOCS 8401040313
Download: ML20083G693 (2)


Text

i-

$- D RECEIVED -

Arizona Public Service Comp $9 P.O BOX 21666 + PHOENIX. ARIZONA 85036 82- CP U. S. Nuclear Regulatory Commission '

Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop,' Director, Division of Resident, Reactor Projects and Engineering Programs Subject : Time Extension for Report - DER 83-42 A 50.55(e) Potentially Reportable Condition Relating To Thermowells In The Reactor Coolant System.

File: 83-019-026; D.4.33.2 Refere nce: (A) Telephone Conversation between P. Johnson an1 J. Roedel on June 29, 1983.

(B) ANPP-27398, dated July 25, 1983 (Interim Report)

(C) ANPP-27852, dated September 21, 1983 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by December 1, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by January 5,1984, at

' which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, CLL( 6@Lb 8401040313 831130 S. E. Van Brunt, Jr.

PDR ADOCK 05000528 APS Vice President, S PDR Nuclear Projects Management ANPP Project Director EEVBJr/KCP:ru cc: See Page 2

So "A 7 eop go

4

~k.

'6 o.

Mr. .T. W. Bishop DER 4 2

.Page 2-cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Id e J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher.

R. M. Grant

-D. R. Hawkinson L. E. Vorderbrueggen G. A. Florelli

t. S. R. Frost

! J. Self D. Canady

[ Records Center f Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 t

. _ ______ _ _ - - _ - _ . -- _ _-