ML20083G641

From kanterella
Jump to navigation Jump to search
Informs That All Architectural Stations Ready to Be Audited by S&W for Vendor Drawings & All Remaining Design/ Spec Exception Items,Per 831228 Discussions
ML20083G641
Person / Time
Site: Midland
Issue date: 12/28/1983
From: Quamme D
CAROLINA POWER & LIGHT CO.
To: Baranow S
STONE & WEBSTER, INC.
References
CSM-0713, CSM-713, NUDOCS 8401060343
Download: ML20083G641 (1)


Text

____

Deen L Quemme

[

\\

\\\\

Sue Manager MM irojen W. ~ d 5. Q

\\

u. send Pro g : Po som teos. Misend. ul 4 esso. (617) sai-esso e/ PRINCIPAL 5TAFF VIIA

.4yRP VRA DE December 28, 1983 A/RA OR4sp AC 3pys gg PAO 3cs y ggd SGA

.'.E g

g/MD ENF File p Mr S W Baranow Stone & Webster P O Box 1963 Midland, MI 48640 MIDLAND ENERCY CENTER FCR/FCN STOP WORK ORDERS File: B1.1.7, 0460.3 UFI: 99*08, 73*

Serial: CSM-0713 Per my staff's discussions on December 28, 1983, all of the Architectural Stations are ready to be audited by Stone & Webster Michigan, Inc. for vendor drawings and all remaining design / specification exception items.

This will conclude the open areas in your audit of the Architectural Document Control Centers.

If you have any. questions regarding the contents of the above, please don't hesitate to contact me directly.

(

X'C2A m

DLQ/TAS/pp CC:

J J Harrit.on, NRC Region III R J Coch, NRC Site J C Keppler, NRC Region III N I Reichel, MEC B H Peck, MEC D D Johnson, MEC T A Spelman, MEC fK05000329 3 831228 A

PDR W3 0

m mumamsamima u

a u