Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083N434 + (10:18:59, 14 December 2024)
- ML20083N433 + (10:19:03, 14 December 2024)
- 05000373/LER-1995-010-01, :on 950415,auto Start of Standby Gas Treatment, Units 1 & 2 Division 2 Reactor Bldg Ventilation Isolation & Other Isolation Signals Received Due to Wrong Fuse Being Pulled Due to Personnel Error.Replaced Fuse + (10:19:05, 14 December 2024)
- ML20083N431 + (10:19:06, 14 December 2024)
- ML20083N425 + (10:19:07, 14 December 2024)
- ML20083N427 + (10:19:07, 14 December 2024)
- ML20083N424 + (10:19:08, 14 December 2024)
- ML20083N421 + (10:19:08, 14 December 2024)
- ML20083N420 + (10:19:09, 14 December 2024)
- ML20083N418 + (10:19:10, 14 December 2024)
- ML20083N414 + (10:19:11, 14 December 2024)
- ML20083N409 + (10:19:14, 14 December 2024)
- ML20083N407 + (10:19:15, 14 December 2024)
- ML20083N406 + (10:19:15, 14 December 2024)
- ML20083N400 + (10:19:16, 14 December 2024)
- RBG-17-534, Interim Deficiency Rept DR-151 Re Partial Penetration Welds for Square groove,butt-welded,HVAC Ductwork.Investigation Still in Progress.Next Rept Will Be Submitted by 840531 + (10:19:16, 14 December 2024)
- ML20083N397 + (10:19:17, 14 December 2024)
- 05000324/LER-1982-141-03, /03L-0:on 821218,primary Containment Atmosphere Oxygen Analyzer 1-CAC-AT-1263-2 Showed Upscale Indication of Drywell Oxygen Concentration.Caused by 1263-2 Analyzer Zero Shift.Analyzer Calibr & Returned to Svc + (10:19:18, 14 December 2024)
- 05000369/LER-1984-008-01, :on 840112,during FSAR Review,Nrc Noted Several Model Changes to Westinghouse Marvel Code Used to Calculate Mass & Energy Release for Main Steam Line Breaks. Cause Not Stated.Analysis Performed + (10:19:20, 14 December 2024)
- ML20083N385 + (10:19:21, 14 December 2024)
- ML20083N384 + (10:19:22, 14 December 2024)
- ML20083N379 + (10:19:23, 14 December 2024)
- ML20083N377 + (10:19:23, 14 December 2024)
- 05000499/LER-1995-005, Forwards LER 95-005.Event Did Not Have Adverse Effect on Health & Safety of Public,But Clearly Does Not Meet Stds for Expected Performance + (10:19:24, 14 December 2024)
- ML20083N376 + (10:19:24, 14 December 2024)
- ML20083N367 + (10:19:25, 14 December 2024)
- ML20083N361 + (10:19:26, 14 December 2024)
- RBG-17-535, Interim Deficiency Rept DR-137 Re Preheat Requirements for Pipe Support Welds.Investigation Incomplete.Next Rept Will Be Submitted by 840518 + (10:19:26, 14 December 2024)
- ML20083N357 + (10:19:27, 14 December 2024)
- ML20083N352 + (10:19:27, 14 December 2024)
- 05000324/LER-1982-141, Forwards LER 82-141/03L-0 + (10:19:28, 14 December 2024)
- ML20083N335 + (10:19:29, 14 December 2024)
- ML20083N342 + (10:19:29, 14 December 2024)
- ML20083N330 + (10:19:31, 14 December 2024)
- ML20083N310 + (10:19:34, 14 December 2024)
- GO2-95-080, Comment on Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Util Believes That Ability to Justify Actuator Capability by Analysis Should Not Be Restricted to Population of Small Valves + (10:19:35, 14 December 2024)
- ML20083N301 + (10:19:35, 14 December 2024)
- ML20083N298 + (10:19:36, 14 December 2024)
- NRC-95-0047, Comment on GL, Pressure Locking & Thermal Binding of Safety Related Power-Operated Gate Valves. Draft GL Should Be Revised to Permit Some Use of Plant Operating Experience as Basis for Engineering Judgement + (10:19:36, 14 December 2024)
- ML20083N286 + (10:19:37, 14 December 2024)
- ML20083N285 + (10:19:38, 14 December 2024)
- ML20083N284 + (10:19:42, 14 December 2024)
- ML20083N274 + (10:19:43, 14 December 2024)
- ML20083N276 + (10:19:43, 14 December 2024)
- ML20083N266 + (10:19:45, 14 December 2024)
- ML20083N265 + (10:19:46, 14 December 2024)
- ML20083N264 + (10:19:47, 14 December 2024)
- ML20083N263 + (10:19:47, 14 December 2024)
- ML20083N261 + (10:19:48, 14 December 2024)
- ML20083N262 + (10:19:48, 14 December 2024)
- RBG-14-208, Interim Deficiency Rept DR-89 Re Malfunction of Primary knife-type Disconnect Mfg by Rte Delta Corp.Initially Reported on 821222.Addl Info Provided in Manufacturer .Investigation Continuing.Next Rept Expected by 830317 + (10:19:49, 14 December 2024)