Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085J665 + (08:19:47, 14 December 2024)
- ML20085J668 + (08:19:47, 14 December 2024)
- ML20085J664 + (08:19:48, 14 December 2024)
- ML20085J663 + (08:19:48, 14 December 2024)
- ML20085J660 + (08:19:49, 14 December 2024)
- ML20085J659 + (08:19:49, 14 December 2024)
- TXX-4054, Interim Deficiency Rept Re Temp in Excess of FSAR Parameters Experienced in Annulus Between Reactor Vessel Insulation & Shield Wall.Cooling Increased by Reducing Chilled Water Temp & Installing Addl Cooling Coil + (08:19:50, 14 December 2024)
- ML20085J649 + (08:19:51, 14 December 2024)
- ML20085J647 + (08:19:51, 14 December 2024)
- ST-HL-AE-1011, First Interim Deficiency Rept Re Design Basis Flood Calculations Not Considering Erosion Effects of Postulated Embankment Breach.Initially Reported on 830830.Next Rept Expected by 840120 + (08:19:52, 14 December 2024)
- ML20085J639 + (08:19:52, 14 December 2024)
- ML20085J634 + (08:19:53, 14 December 2024)
- RBG-16-076, Final Deficiency Rept DR-117 Re Previously Unanalyzed Containment Negative Pressure Scenario.Condition Does Not Meet Criteria for Reportability Under 10CFR50.55(e) + (08:19:53, 14 December 2024)
- RBG-16-057, Interim Deficiency Rept DR-74.Investigation Incomplete. Next Rept Will Be Submitted by 831117 + (08:19:54, 14 December 2024)
- ML20085J621 + (08:19:55, 14 December 2024)
- ML20085J602 + (08:19:56, 14 December 2024)
- ML20085J595 + (08:19:56, 14 December 2024)
- ML20085J593 + (08:19:57, 14 December 2024)
- ML20085J594 + (08:19:57, 14 December 2024)
- ML20085J579 + (08:19:58, 14 December 2024)
- ML20085J577 + (08:19:58, 14 December 2024)
- ML20085J561 + (08:20:07, 14 December 2024)
- ML20085J551 + (08:20:08, 14 December 2024)
- ML20085J560 + (08:20:08, 14 December 2024)
- ML20085J539 + (08:20:09, 14 December 2024)
- ML20085J524 + (08:20:12, 14 December 2024)
- ML20085J518 + (08:20:13, 14 December 2024)
- RBG-16-075, Interim Deficiency Rept DR-107.Util Investigation Incomplete.Next Rept Will Be Submitted by 831025 + (08:20:13, 14 December 2024)
- ML20085J505 + (08:20:14, 14 December 2024)
- ML20085J513 + (08:20:14, 14 December 2024)
- RBG-16-056, Interim Deficiency Rept DR-72.Investigation Ongoing.Interim or Final Rept Will Be Provided by 831117 + (08:20:15, 14 December 2024)
- ML20085J495 + (08:20:15, 14 December 2024)
- ML20085J487 + (08:20:16, 14 December 2024)
- ML20085J480 + (08:20:16, 14 December 2024)
- ML20085J479 + (08:20:17, 14 December 2024)
- ST-HL-AE-1004, Revised Final Deficiency Rept Re Essential Cooling Water Intake Structure Gantry Crane.Initially Reported on 790516. Crane Design Revised for Severe & Extreme Environ Loadings to Retain Structural Integrity + (08:20:18, 14 December 2024)
- ML20085J476 + (08:20:18, 14 December 2024)
- RBG-16-069, Interim Deficiency Rept DR-97.Investigation Ongoing.Next Rept Will Be Provided by 831110 + (08:20:19, 14 December 2024)
- ML20085J467 + (08:20:26, 14 December 2024)
- ML20085J455 + (08:20:27, 14 December 2024)
- ML20085J428 + (08:20:32, 14 December 2024)
- ML20085J426 + (08:20:38, 14 December 2024)
- ML20085J424 + (08:20:39, 14 December 2024)
- ML20085J422 + (08:20:40, 14 December 2024)
- ML20085J411 + (08:20:40, 14 December 2024)
- BSEP-83-3349, Monthly Operating Repts for Sept 1983 + (08:20:41, 14 December 2024)
- ML20085J409 + (08:20:41, 14 December 2024)
- ML20085J405 + (08:20:42, 14 December 2024)
- AECM-83-0642, Application for Amend to License NPF-13,revising Tech Specs to Change Action 50 of RCIC Sys Actuation Instrumentation to Reflect Only One Trip Sys + (08:20:43, 14 December 2024)
- ML20085J402 + (08:20:43, 14 December 2024)
- L-MT-20-006, Plants Response to Regulatory Issue Summary 2020-01 + (08:20:44, 14 December 2024)
- ML20085J398 + (08:20:44, 14 December 2024)