Fourth Interim Deficiency Rept Re Documentation & Hardware Discrepancies in Borated Refueling Water Sys.Initially Reported on 830121.Evaluation of Safety Significance of Sway Strut Washer Ongoing.Final Rept Will Be Submitted by 831209
ML20085J479
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/28/1983
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, KMLNRC-83-124, NUDOCS 8310130192
Download: ML20085J479 (2)


Text

.

KANSAS GAS AND ElfCTRIC COMPANY THE ELE CTFhC COMPANY

@LENN L MOESTER v Cs passeogge. e.uctgan September 28, 1983 Mr. W.C. Seidle, Chief Reactor Projects Branch 2 gg

\\ [

U.S. Nuclear Regulatory Commission

~

Region IV ij 611 Ryan Plaza Drive, Suite 1000 OCT 3%

I 4

Arlington, Texas 76011 g

U _-dW%WS"~

d Re:

Docl.at No. STN 50-482 Ref: 1) Interim Report KMLNRC 83-016 dated 2/17/83 from GLKoester, KGE, to WCSeidle, NRC

2) Interim Report KMLNRC 83-050 dated 4/25/83 from GLKoester, KGE, to WCSeidle, tiRC
3) Interia Report KMLNRC 83-077 dated 6/24/83 from GLKoester, KGE, to WCSeidle, NRC Subj: Interim Potential 10CFR50.55(e) Report -

Discrepancies in the BN System

Dear Mr. Seidle:

This letter provides an interim report on a potential 10CFR50.55(e) item concerning documentation and hardware discrepancies in the Borated Refueling Water System (BN). This matter was initially reported pur-suant to 10CFR50.55(e) on January 21, 1983, and interim reports were provided in References 1), 2) and 3).

As stated in Reference 3), the documentation and hardware discrepancies identified in the BN system have been evaluated and none would have adversely affected safety of operations had they gone uncorrected.

However, as part of the corrective actions resulting from discrepancies identified in the BN eystem, KGE conducted walkdowns of all safety-related systems turned over prior to the identification of deficiencies in the turnover process. These walkdowns have identified one additional potential safety concern involving sway strut washers. Although the washers have been reported as a separate potential 10CFR50.55(e), the discrepancy was identified as a result of corrective action for BN system turnover deficiencies. Therefore, KGE cannot conclude the subject 10CFR50.55(e) evaluation until the safety significance of the sway strut washer concern is known. It is anticipated that the washer evaluation will be completed within the next month.

8310130192 830723 g

y f_O PDR ADOCK 05000402 s

\\

/

S PDR 201 N. Market -Wichita, Kansas - Mail Address: PO. Box 208 I Wichita, Kansas 67201 - Telephone: Area Code (316) 2616451

f s

Mr. W.C. Seidle KMLNRC 83-124 September 28, 1983 A final or interim report on this subject potential 10CFR50.55(e) will be submitted to you on or before December 9, 1983. In the interim, please direct any questions concerning this subject to me or to Mr. Otto Maynard of my staff.

Yours very truly, A

4 11 Glenn L. Koester Vice President - Nuclear GLK:bb cc: RCDeYoung WSchum/ASmith w