Forwards Revised Application for Amend to License DPR-34, Proposing Supplemental Changes to Administrative Controls Tech Specs Re Min Shift Crew Composition & Plant Operations Review Committee,Per Generic Ltrs 82-12,82-21 & 82-23
ML20085J480
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/28/1983
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20085J484 List:
References
GL-82-12, GL-82-21, GL-82-23, P-83327, NUDOCS 8310130193
Download: ML20085J480 (3)


Text

6 9

j k 7 PUBLIC SERVICE COMPANY OF COLORADO P. O. BOX 840 . DENVER, COLORADO 80208 OSCAR R. LEE September 28, 1983 v.cc m sioc e Fort St. Vrain Unit No. 1 P-83327

  • E@ E : M E %

Mr. John T. Collins, Regional Administrator ,

Region IV Nuclear Regulatory Commission OCT 31983 611 Ryan Plaza Drive  ; 4 r g TX 76011 ,

Docket No. 50-267

SUBJECT:

Proposed Supplemental Technical Specification Change - Sections 7.1 and

7.4 REFERENCES

(1) G-82178 (Generic Letter 82-12)

(2) G-82324 (Generic Letter 82-21)

(3) G-83011 (Generic Letter 82-23)

(4) G-82080 (Clark to Lee, dated March 19, 1982)

(5) G-83084 (Eisenhut to PSC, dated October 1, 1982)

(6) P-82391 (Lee to Clark, dated September 14, 1982)

(7) P-82112 (tee to Clark, dated April 20, 1982)

(8) P-83134 (Lee to Collins, dated April 7, 1983)

Dear Mr. Collins:

This letter is to propose supplemental changes to the Administrative Controls (Section 7.1 and 7.4) of the Fort St. Vrain Technical Specifications. These changes include those previously submitted in

- Reference (8) above and incorporate supplemental changes with respect to the Minimum Shift Crew Composition requirements and the Plant Operations Review Committee. This submittal supercedes those identified in References (6), (7), and (8). h 8310130193 830928 }

PDR ADOCK 05000267 ,

P PDR

-- -- - - - - - - - - - - - - - - - - - - - - - - . - - - - - ----a

9

~2-Please note that proposed change to Section 7 of the Fort St. Vrain Technical Specifications have also been submitted via Public Service Ccompany letter dated September 28,1983(P-83322). Depending upon the sequence of Nuclear Regulatory Commission approvals on each i submittal, a format change to the Section 7 proposed in this letter may be required.

A summary of the proposed changes is provided in Attachment 1, and the changes themselves are provided in Attachment 2. Attachment 3 contains an evaluation of the significant hazards considerations involved in the proposed changes.

In accordance with the provision of 10 CFR 170, we believe that amendment fees should not be required since this application is a supplement to the submittal in Reference (8) and safety issues have not been introduced.

If you have any questions, please contact Mr. Don Warembourg at (303) 785-2224.

Very truly yours,

$ ffU

0. R. Lee Vice President Electric Production
Attachments cc
Albert J. Hazle, Colorado Department of Health ORL/djm l

,y - . . . _ - - _ _ - . ._. -_,,.___--r - , , , , , , - , , , _

e i

STATE OF COLORADO )

. ) ss.

, CITY AND COUNTY OF DENVER) i i

]

0. R. Lee, being first duly sworn, deposes and says; That he is Vice President of Electric Production of Public Service Company of I Colorado, the Licensee herein; that he has read the foregoing Application for Amendment to Appendix A of Facility Operating License and knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

i &

h' Lee

0. R.

i Subscribed and sworn to before me this f8 day of September, 1983.

1 Witness my hand and official seal, i My commission expires: //-f 8-8 6 .

. i (

, // Al u f "XDi%%

i Notary PubJic 4

J

. - - - - - -