ML20085J455
| ML20085J455 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 06/19/1995 |
| From: | Burski R ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-95-0093, W3F1-95-93, NUDOCS 9506220202 | |
| Download: ML20085J455 (2) | |
Text
'
p Gy Ent:rgy Operr, tion,In2.
s==-- ENTERGY row e
. Kf&a LA 70066 Rd 504 739 6774 R. F. Burski Dmxtr. -
tks. tar Sky Wes(xd 3 '
W3F1-95-0093 A4.05 PR 1
June 19, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Exemption to 10CFR50, Appendix J Gentlemen:
By. letter dated November 16, 1993, Waterford 3 requested an exemptionLto the requirements of 10CFR50, Appendix J, Section III.D. The letter requested an exemption to the periodic test schedule for Type A testing
_]
that requires a set of three Type A tests to be performed at approximately equal intervals during each 120-month inspection interval. The referenced j
request _ constitutes a permanent exemption to the Appendix J criteria to allow Waterford 3 to perform one Type A test during a 120-month interval.
]
The purpose of this letter is to modify 'the initial proposal such that the exemption request coincides with the current NRC approved extension (NRC letter dated August 2 1994) of the Waterford 3 120-month inspection interval. As such, an exemption to Appendix J Type A Testing criteria for one fuel cycle is requested. Upon approval of this request Waterford 3 will be exempt from the 10CFR50, Appendix J, Type A Test requirements until April 1997 or Refuel 08, which ever comes first. The' justification i
provided in letter dated November 16, 1993 remains in effect and adequately j
bounds this proposal.
l
/
DI 9506220202 950619 i
PDR ADOCK 05000302 L
O PDR
'g
)
e 10CFR50, Appendix J W3F1-95-0093 Page 2 June 19, 1995 Please contact me or Paul L. Caropino (504) 739-6692, should there be any questions regarding this letter.
Very truly yours, W
R.F. Burski Director Nuclear Safety RFB/PLC/tmm cc:
L.J. Callan, NRC Region IV C P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds NRC Resident Inspectors Office