Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20086S139 + (06:32:20, 14 December 2024)
- ML20086S138 + (06:32:20, 14 December 2024)
- ML20086S133 + (06:32:21, 14 December 2024)
- ML20086S128 + (06:32:22, 14 December 2024)
- ML20086S131 + (06:32:22, 14 December 2024)
- ML20086S127 + (06:32:24, 14 December 2024)
- ML20086S126 + (06:32:25, 14 December 2024)
- 05000259/LER-1984-008-01, :on 840129,during Normal Operation,One or More Pressure Differential Transmitter Instrumentation 1-25A Through D Failed in Downscale Direction,Causing Trouble Alarm.Cause Unknown.Instruments Recalibr + (06:32:27, 14 December 2024)
- B15306, Application for Amend to License NPF-49,revising TS Re Nominal 24 Month Fuel Cycle Surveillance Extensions for Millstone Unit 3 + (06:32:28, 14 December 2024)
- ML20086S116 + (06:32:28, 14 December 2024)
- ML20086S113 + (06:32:29, 14 December 2024)
- 05000280/LER-1977-001-03, /03L:on 761113,pressurizer Safety Valve Setpoints for Valves SV-1551A & SV-1551B Found Below 2,485 Psig Requirement.Caused by Setpoint Drift.Testing Procedure Will Be Revised + (06:32:30, 14 December 2024)
- 05000333/LER-1984-001, :on 840118,during Surveillance Testing for Inoperative B Side Suppression Pool Cooling & Spray Isolation Valve,Rhr Svc Water Pump C Failed.Caused by Worn Impeller Collet.Valve Repaired + (06:32:33, 14 December 2024)
- ML20086S094 + (06:32:34, 14 December 2024)
- ML20086S105 + (06:32:34, 14 December 2024)
- LIC-95-0049, Updates Response to RG 1.97,rev 2,re Condenser Air Removal Sys Exhaust,Submitted in Util + (06:32:35, 14 December 2024)
- 05000277/LER-1984-001, :on 840117,during Surveillance Testing of RHR B Injection Valve Mo 2-10154B,valve Failed to Reopen.Caused by Warping of Bakelite Coil & Core Housing within Motor Control Ctr.Thermal Overload Device Replaced + (06:32:37, 14 December 2024)
- ML20086S082 + (06:32:38, 14 December 2024)
- 05000280/LER-1977-012, RO S1-77-01 Re Failures of Hydraulic Shock Supports (Snubbers).Extent of Failures Reported in LER 77-12.All Snubbers Operable on 771207 Startup + (06:32:39, 14 December 2024)
- ML20086S081 + (06:32:39, 14 December 2024)
- ML20086S075 + (06:32:40, 14 December 2024)
- ML20086S064 + (06:32:41, 14 December 2024)
- ML20086S069 + (06:32:41, 14 December 2024)
- ML20086S056 + (06:32:42, 14 December 2024)
- ML20086S057 + (06:32:42, 14 December 2024)
- 05000280/LER-1977-002-03, /03L:on 770120,valves SV-MS-101B & SV-MS-102B Exceeded Setpoint Limits of 1,085 & 1,095 Psig,Respectively. Caused by Setpoint Drift.Valves Adjusted + (06:32:44, 14 December 2024)
- 0CAN129105, Forwards Response to NRC 910819 Request for Addl Info Re 910627 Application for Amends to Licenses DPR-51 & NPF-6, Changing Tech Specs to Incorporate Generic Ltr 87-09 Re 3.0.4 Exceptions + (06:32:45, 14 December 2024)
- ML20086S036 + (06:32:47, 14 December 2024)
- ML20086S039 + (06:32:47, 14 December 2024)
- ML20086S034 + (06:32:48, 14 December 2024)
- ML20086S035 + (06:32:48, 14 December 2024)
- ML20086S012 + (06:32:49, 14 December 2024)
- BECO-84-031, Forwards Updated Rev 1 to Inservice Testing Program, W/ Boundary Coordinate Info Provided for Locating Valves & Pumps on Insp Drawings + (06:32:50, 14 December 2024)
- ST-HL-AE-3946, Notifies NRC That Individual Plant Exam of External Events for STP Units Completed & Info Requested in Generic Ltr 88-20,Suppl 4 & NUREG-1407 Has Been Submitted + (06:32:51, 14 December 2024)
- RBG-17-123, Notifies That Structures Adjacent to Unit 2 Excavation Area Under Analysis for Effects of Excavation Ponding Per Revised Design Basis Flood Analysis.Ponding Will Not Produce Significant Addl Structural Loads + (06:32:51, 14 December 2024)
- ML20086S000 + (06:32:52, 14 December 2024)
- ML20086R996 + (06:32:53, 14 December 2024)
- ML20086R998 + (06:32:53, 14 December 2024)
- 05000263/LER-1984-006, :on 840119,reactor Bldg Isolation & Initiation of Standby Gas Treatment Occurred When Radiation Check Source Brought Too Close to Refuel Floor Spent Fuel Pool Monitor.Area Radiation Monitor Relocated + (06:32:56, 14 December 2024)
- ML20086R976 + (06:32:57, 14 December 2024)
- ML20086R975 + (06:32:58, 14 December 2024)
- 05000280/LER-1977-004-03, /03L,on 770126,reactor Exceeded 90% Power Hold Point Prior to Recalibr of ex-core Symmetrical Offset Detector Sys to in-core Instrumentation Sys.Caused by Personnel Error.Power Reduced + (06:33:00, 14 December 2024)
- ML20086R969 + (06:33:06, 14 December 2024)
- 05000280/LER-1977-005-03, /03L:on 770126,when Recirculation to Boron Injection Tank Halted to Repair Leaking diaphragms,150 Mwe/H Rampdown Initiated.Caused by Faulty Diaphragm Matl.Valves Will Be Replaced Periodically + (06:33:08, 14 December 2024)
- ULNRC-03244, Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 3 + (06:33:10, 14 December 2024)
- ML20086R957 + (06:33:11, 14 December 2024)
- 05000280/LER-1977-006-03, /03L:on 770208,charging Pump Cooling Water Pump 1-CC-P-2A Tripped Due to Thermal Overload.Caused by Faulty Motor Bearings.Bearings Replaced & Minor Mechanical Defects Corrected + (06:33:16, 14 December 2024)
- ML20086R951 + (06:33:17, 14 December 2024)
- 05000280/LER-1977-007-03, /03L:on 770215,safety Valve SV-MS-101A Lifted Prematurely at Approx 950 Psi,Below Normal Setpoint of 1,085 Psi.Caused by Torque Limiting Device Setting Low Causing Drift.Safety Valves Reset + (06:33:19, 14 December 2024)
- 05000280/LER-1977-008-03, /03L:on 770220,when Recirculation Halted to Replace Leaking Diaphragm in Valves 1-CH-98,150 Mwe/H Rampdown Initiated.Draphragm Failure Caused by Valve Overtightening When Shutting + (06:33:21, 14 December 2024)
- LD-84-009, Forwards Interface Requirements Re Block Valves on Atmospheric Dump Valves to Close Out Confirmatory Item 2 of Sser 2 Re Steam Generator Tube Rupture Analysis + (06:33:22, 14 December 2024)