ML20086S036
| ML20086S036 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/20/1991 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | Murley T NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9201030018 | |
| Download: ML20086S036 (3) | |
Text
_ _ _ _. _ _.
A atAma P6.ver Compny.
D '
- I"
- ~
40 invetness Center Pe4WDi Post Once nas 1295.
D rmingtyvit Alabarna 35:'01 -
Trephone 205 fut S060 g
m J. D. Wood ard Alabamalbwer v
e
-n aa' December 20, 1991 n, y,,,, r,,,, %.si, Docket Nos. 50-348 50-364 U.S._ Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555-Attention:
Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation Joseph M. Farley Nuclear Plant Operator Work Sphedule Backfit Anneal Board
Dear Dr. Murley:
By letter dated December 16,.1991, Alabama Power Company forwarded its basis for the appeal of-the imposition of the compliance exception backfit. Included as Exhibit 7 of the package was a table titled "Farley Nuclear. Plant Annual Weekly Average Overtime Hours by Job Classification." _ The figures provided in-the table-
~i included some operations personnel who were not_'on shift work, i.e., operations personnel assigned to training or other. duties.
As a result, the figures were slightly lower than those for shifti workers only. _ This discrepancy _was pointed out at the Backfit Review Panel meeting held on December-18, 1991. A corrected figure was provided to the-Panel members, 1
A corrected copy of the table is; attached.
If there are any questions, please advise.
Respectfully submitted,,
Yh.
L D. Woodard-4 JDW/ REM: map
-stachment 11 cc:
Mr. J. M. Taylor Mr. S. D. Ebneter=
Mr.,B.-A. Boger
-Mr. J. E Richardson
- 1
-Mr. F. J. Congel Mr. S. T. Hoffman 1
Mr. S. A. Varga
_\\
e m.yd L J -
Mr. G. F. Maxwell-
' 8L j
l 9201030019 911220 PDR ADOCK 05000349 P
+,.w=-
.+,.,-v.
e-m,,,-
,,,vr.
1 y, - m a
.,- w w n w.,
-, y r, w-
-n
r Attachment Farley Nuclear Plant Annual Weekly Average Overtime Hours By Job Classification
1 FARLEY NUCLEAR PLANT ANNUAL WEEKLY AVERAGE OVERTIME HOURS i
h BY JOB CLASSIFICATION i
t I
i YEAR SS SF P0 S0 1
1987 6
8-
.B 10 i
l 1988 5
5 7
8 i
l 1989 8
7 9.
10 L
1990 7
6 7
8 1991 7
8 6
8 i-AVERAGE 7
7 7
9 l
u
'I e
t r.-
.-,