Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087A156 + (06:18:20, 14 December 2024)
- 05000280/LER-1976-002-01, /01T:on 760313,determined That Worst Break LOCA Core Thermal Transient Analysis Inaccurate Since Effects of Steam Generator Tube Plugging Not Included.Cause Unknown. Research Being Conducted + (06:18:22, 14 December 2024)
- ML20087A153 + (06:18:26, 14 December 2024)
- 05000280/LER-1976-002, Updated LER 76-02/01T:on 760313,determined Worst Break LOCA Core Thermal Transient Analysis Inaccurate Since Effects of Steam Generator Tube Plugging on LOCA Not Considered + (06:18:27, 14 December 2024)
- ML20087A152 + (06:18:27, 14 December 2024)
- 05000281/LER-1976-002-01, /01T:on 760511,small Cracks & Radial Growth Observed on Periphery of Seventh Tube Support Plate.Caused by Change from Phosphate to Avt Chemistry.Further Investigation in Progress + (06:18:29, 14 December 2024)
- 05000280/LER-1976-003-01, /01T:on 760721,discovered Outputs of Two Pressure Switches PS-LM-100C & 100D Still Jumpered to Prevent Initiation of Cls Containment Hi Signal.Caused by Failure to Review Jumper Log at Proper Time + (06:18:35, 14 December 2024)
- ML20087A146 + (06:18:36, 14 December 2024)
- ML20087A141 + (06:18:37, 14 December 2024)
- 05000281/LER-1976-003-01, /01T:on 760521,routine Chemistry Analysis of Primary Coolant Boron Concentration Indicated Unplanned Dilution Occurred.Caused by Three Tubes Out on Steam Generator 2A.Tubes Plugged + (06:18:39, 14 December 2024)
- 05000281/LER-1976-003, Updated LER 76-03/01T:on 760521,routine Chemistry Analysis of Primary Coolant Boron Concentration Indicated Unplanned Dilution Occurred.Caused by Three Tubes Cut on Steam Generator 2A.Tubes Plugged + (06:18:40, 14 December 2024)
- ML20087A136 + (06:18:40, 14 December 2024)
- ML20087A131 + (06:18:41, 14 December 2024)
- ML20087A125 + (06:18:42, 14 December 2024)
- ML20087A124 + (06:19:04, 14 December 2024)
- ML20087A122 + (06:19:05, 14 December 2024)
- ML20087A120 + (06:19:07, 14 December 2024)
- ML20087A118 + (06:19:07, 14 December 2024)
- ML20087A117 + (06:19:08, 14 December 2024)
- ML20087A115 + (06:19:12, 14 December 2024)
- ML20087A113 + (06:19:13, 14 December 2024)
- ML20087A112 + (06:19:13, 14 December 2024)
- ML20087A108 + (06:19:15, 14 December 2024)
- ML20087A105 + (06:19:15, 14 December 2024)
- ML20087A104 + (06:19:16, 14 December 2024)
- ML20087A101 + (06:19:17, 14 December 2024)
- ML20087A099 + (06:19:18, 14 December 2024)
- ML20087A096 + (06:19:19, 14 December 2024)
- ML20087A095 + (06:19:20, 14 December 2024)
- ML20087A089 + (06:19:21, 14 December 2024)
- ML20087A082 + (06:19:21, 14 December 2024)
- A03737, Responds to NRC Re Deviation Noted in IE Insp Rept 50-423/83-18.Util Will Continue to Allow Use of Cable Splices When Justified by Analysis.Rev to FSAR Will Be Submitted by 840515 to Clarify Position + (06:19:22, 14 December 2024)
- ML20087A077 + (06:19:23, 14 December 2024)
- ML20087A069 + (06:19:23, 14 December 2024)
- ML20087A064 + (06:19:25, 14 December 2024)
- ML20087A062 + (06:19:25, 14 December 2024)
- ML20087A061 + (06:19:27, 14 December 2024)
- ML20087A057 + (06:19:28, 14 December 2024)
- ML20087A052 + (06:19:32, 14 December 2024)
- ML20087A050 + (06:19:33, 14 December 2024)
- AECM-84-0101, Forwards Info Re Shift Advisors,Including Job Description + (06:19:34, 14 December 2024)
- ML20087A047 + (06:19:34, 14 December 2024)
- ML20087A045 + (06:19:35, 14 December 2024)
- ML20087A036 + (06:19:37, 14 December 2024)
- ML20087A033 + (06:19:39, 14 December 2024)
- ML20087A029 + (06:19:40, 14 December 2024)
- ML20087A024 + (06:19:41, 14 December 2024)
- ML20087A023 + (06:19:42, 14 December 2024)
- ML20087A017 + (06:19:50, 14 December 2024)
- ML20087A013 + (06:19:51, 14 December 2024)
- ML20087A008 + (06:19:52, 14 December 2024)