ML20087A118

From kanterella
Jump to navigation Jump to search
Proposed TS 3/4 5-1 Re Verification That Each Safety Injection Tank Isolation Valve Open Will Not Be Required Due to Valve Being Mechanically Secured in Open Position
ML20087A118
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 12/31/1991
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20087A116 List:
References
NUDOCS 9201080196
Download: ML20087A118 (2)


Text

1 i

. . i 1

NI'I'ACIIMl?NT (1) l UNIT I TECllNICAL SI'ECIFICATION REVISED PAGES ,

3/451 l

l

[

l l

l 9201080196 91123)

PDR ADOCK 050003t7 P PDR

. _ , . . _ . . . . _ _ _ . _ _ , _ _ , . , - . . . - _ __ _ _ _ _ , - . - . . _ _ . . _ ~ _ _ , , . _ . , _ - _ , .

1/jLS EMERGENCY CORE (q0 LING SYSTEMS (ECCS)

SAFETY INJECTION TANKS 11MITINGlWiDJT10N FOR OPERATION 3.5.1 Each reactor coolant system safety injection tank shall be OPERABLE with:

a. The isolation valve open, .
b. A contained borated water volume of between 1113 and 1179 cubic feet of borated water (equivalent to tank levels of between 187 and 199 incnes, respectively),
c. A boron concentration of bttween 2300 and 2700 ppm, and
d. A nitrogen cover pressure of between 200 and 250 psig.

APPLICABillJTl: H0 DES 1, 2 and 3. k ACTION:

a. With one safety injection tank inoperable, except as a result of a closed isolation valve, restore the inopernble tank to OPERABLE status within one hour or be in H01 SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,
b. With one safety injection tank inoperable due to the isolation I I valve being closed, either immediately open the isolation valve or be in HOT STANDBY within one hour and be in HOT SHU1DOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVU1LAltCllLEUJAQiLNTS 4.5.1 Each safety injection tank shall be demonstrated OPERABLE:

a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:
1. Verifying the contained borated water volume and nitrogen cover-pressure in the tanks, and
2. Verifying hat each safety injection tank isolation valve is open pmWnW"AM E(Tec H w % h4 M e) + p i,c c h w k & q n h ie 3 Gern Rd<ely chge iD LSps;ny 199d %Qs ,'eciC.cGhn is mb Regained M J-w1-4+/ because. h valx h46 been .mechar'icall t secure 2 M de crea poslym

{ g v

AyNsfNjgj fyy1f /

I CALVERT CLIFFS UNIT 1 3/4 5 1 Amendment No. /E/EE.)T6 153

_ _ _ _ _ _ _