Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087D336 + (04:16:50, 14 December 2024)
- ML20087D338 + (04:16:50, 14 December 2024)
- B11028, Forwards Effluent Toxicity Testing at Millstone Nuclear Power Station Using Sheepshead Minnow During 1981-82 & Development of Long-Term Effluent Toxicity Testing Procedure..., in Response to Environ Rept Question + (04:16:54, 14 December 2024)
- ML20087D335 + (04:16:54, 14 December 2024)
- ML20087D330 + (04:16:55, 14 December 2024)
- ML20087D329 + (04:16:56, 14 December 2024)
- ML20087D326 + (04:16:56, 14 December 2024)
- ML20087D321 + (04:16:57, 14 December 2024)
- ML20087D324 + (04:16:57, 14 December 2024)
- BSEP-95-0342, Forwards Typed TS Pages for 930125 LAR Re Control Rod Drive Accumulator Operability + (04:16:58, 14 December 2024)
- ML20087D319 + (04:16:59, 14 December 2024)
- 05000317/LER-1984-002, :on 840127,reactor Tripped & All Eight Reactor Trip Breakers Opened Simultaneously.Root Cause Unknown. Independent Sys Failure Evaluation Will Be Performed + (04:17:07, 14 December 2024)
- ML20087D313 + (04:17:08, 14 December 2024)
- ML20087D312 + (04:17:08, 14 December 2024)
- ML20087D311 + (04:17:09, 14 December 2024)
- ML20087D309 + (04:17:10, 14 December 2024)
- ML20087D304 + (04:17:11, 14 December 2024)
- SNRC-1884, Advises That Lilco Concurs W/Long Island Power Authority 920113 Application for Amend to License NPF-82, Authorizing Long Island Power Authority to Implement Decommissioning Plan + (04:17:11, 14 December 2024)
- ML20087D299 + (04:17:12, 14 December 2024)
- 05000368/LER-1984-002, :on 840129,during Routine Surveillances of Core Protection Calculator Sys,Operations Personnel Observed That Valves of Addressable Constants Did Not Agree W/Valves for Cycle 4.Caused by Reactor Trip on 840128 + (04:17:14, 14 December 2024)
- ML20087D287 + (04:17:15, 14 December 2024)
- ML20087D284 + (04:17:16, 14 December 2024)
- ML20087D283 + (04:17:16, 14 December 2024)
- ML20087D281 + (04:17:20, 14 December 2024)
- BECO-LTR-92-001, Monthly Operating Rept for Dec 1991 for Pilgrim Nuclear Power Station + (04:17:23, 14 December 2024)
- ML20087D278 + (04:17:24, 14 December 2024)
- ML20087D277 + (04:17:25, 14 December 2024)
- SNRC-1883, Application for Conforming Amend to License NPF-82, Authorizing Implementation of Util Decommissioning Plan Presently Pending Before NRC + (04:17:25, 14 December 2024)
- ML20087D274 + (04:17:26, 14 December 2024)
- NRC-84-0040, Forwards Justification for Interim Operation (Jio) for Listed Programs & Draft Westinghouse Class 3 Topical Repts. Final Resolution of Issues for Listed Jios Expected by 850331 + (04:17:27, 14 December 2024)
- ML20087D264 + (04:17:31, 14 December 2024)
- ML20087D263 + (04:17:31, 14 December 2024)
- ML20087D261 + (04:17:32, 14 December 2024)
- ML20087D255 + (04:17:33, 14 December 2024)
- ML20087D246 + (04:17:38, 14 December 2024)
- BSEP-84-0538, Monthly Operating Repts for Feb 1984 + (04:17:39, 14 December 2024)
- 05000369/LER-1984-002-01, :on 840130,reactor Protection Sys Initiated Trip Following Voltage Spike in Loop C.Caused by Failure of Loop C Lead/Lag Card of Process Control Sys.Faulty Card Replaced + (04:17:41, 14 December 2024)
- W3P84-0232, Suppls 830729 & 1018 Responses to IE Emergency Preparedness Appraisal Rept 50-382/83-08,providing Current Status of Action on Emergency Preparedness Appraisal Open Items + (04:17:45, 14 December 2024)
- ML20087D237 + (04:17:46, 14 December 2024)
- B15307, Requests Relief from Section XI of ASME Code Exam Requirements + (04:17:47, 14 December 2024)
- ML20087D233 + (04:17:48, 14 December 2024)
- ST-HL-AE-1063, Final Deficiency Rept Re Pipe Stress Analysis Design Process.Initially Reported on 831228.Evaluation Complete. Item Determined Not Reportable Per 10CFR50.55(e) + (04:17:48, 14 December 2024)
- B15323, Updates Reply to NOV & Proposed Imposition of Civil Penalty Submitted by Util on Behalf of Millstone,Unit 2 + (04:17:49, 14 December 2024)
- ML20087D222 + (04:17:50, 14 December 2024)
- 05000368/LER-1984-004, :on 840131,reactor Tripped from Approx 10% Full Power.Caused by Low Steam Generator Level in Steam Generator B Due to Manual Level Control Difficulties + (04:17:52, 14 December 2024)
- 05000325/LER-1984-002-01, :on 840203,reactor Scram Occurred Due to High Reactor Vessel Pressure.Caused by Loss of Electrohydraulic Control Sys Fluid Actuation Supply Pressure to Valves Closing Main Turbine Bypass Valves + (04:17:54, 14 December 2024)
- ML20087D213 + (04:17:59, 14 December 2024)
- ML20087D214 + (04:17:59, 14 December 2024)
- ML20087D212 + (04:18:00, 14 December 2024)
- 3F0895-10, Requests NRC Approval of Changes in Quality Program Description Which Will Reduce Commitments.Changed Pages from FSAR Chapter 1.7 Encl + (04:18:01, 14 December 2024)
- ML20087D204 + (04:18:01, 14 December 2024)
- RBG-41641, Responds to NRC Re long-term Performance Improvement Program Meeting on 950410,in Regard to Development of Impact Statement for Preventive Maint Work Plans + (04:18:02, 14 December 2024)