BSEP-84-0538, Monthly Operating Repts for Feb 1984
| ML20087D245 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 02/29/1984 |
| From: | Dietz C, Harrison F CAROLINA POWER & LIGHT CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| BSEP-84-0538, BSEP-84-538, NUDOCS 8403130333 | |
| Download: ML20087D245 (18) | |
Text
-
v-s-
APPENDIX B AVERAGE' DAILY POWER LEVEL v
DOCKET NO. 050-0325 V
UNIT BRUNSWICK UNIT 1 DATE 03/02/84
??
-:,[
COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 i
-FEBRUARY-1984 LDAY
~ AVG. DAILY POWER LEVEL DAY AUG. DAILY POWER LEVEL (MWE-NET)
(HWE-NET) 1[^
-12,
~
17 794
.I.
2
',-11 18 769 q
3 1:
-12
' 19 792
^
4' 249 20 793
.js' f'.-;
'/
3 21 797 5 ,
~
665 e
-w,,
g x'
...747'
- 1 +.fp 22 79cy a
23 795 7
795 L8-
'795-24 791
'9*
795 25 779
-10 l
'798 26 790 11 783 27
' 790 t
- 12'
.794 L 28 780 794-13 698-29
- 14..
704-
.a 3 15
- 795-
,,s, /;W.-
I+4
.;16-793 '
'% %( 9,
i[.
... ~
-n 9.-
.'f
,s
- ).
S.
f
- j C,e.
- -
1.16 - 8 gg
- a.
~8403130333 840229
~me-
~
1(
c PDR ADOCK 05000324 R
PDR e
' }S '
l /,. *'
...-..,,-,,c
_m,,,,-
.-r,,-..-,,,_._,,,m.-.,_,mm..-,,.--c.,,..~,--~~-...-
DPERATING DATA REPORT DOCHET NO. 050-0325 DATE 03/02/84 COMPLETED DY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS 1.
UNIT NAME: BRUNSWICK UNIT 1 i NOTES I
2.
REPORTING PERIOD: FEBRUARY 84 I
I 3.
LICENSED THERMAL POWER (MWT): 2436 l
l 4.
NAMEPLATE RATING (GROSS MWE): 867.0 I
I 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 l
I 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 1 1
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO W;;ICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS.IN REPORTING PERIUD 696.00 1440.00 60961.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 641.13 1362.86 37760.04 13, REACTOR RESERVE-SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE 614.27 1336.00 35424.53
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1447182.78 3172513.88 71599808.45
- 17. GROSS ELEC. ENERGY GEN. (NWH) 486205.00 1066181.00 23613232.00
- 18. NET ELEC. ENERGY GENERATEn (MWH) 473376.00 1038422.00 22652262.00
- 19. UNIT SERVICE FACTOR 88.26 92.78 58.11
- 20. UNIT AVAILABILITY FACTOR 88.26 92.78 58.11
- 22. UNIT CAP. FACTOR (USING DER NET) 82.84 87.84 45.26
- 23. UNIT FORCED OUTAGE RATE 11.74 7.22 22.62
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACil):
REPLACING SEALS ON 3/3 - 3/10/84 7 DAYS RECIRC PUMP
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR'TO COMMERCIAL OPEPATION): FORCAST ACHEIVED INITIAL CRITICALITY t
INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
APPENDIX DOCKET No.:
050-325 UNIT:
Brunswick No. 1 DATE: March 1984 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK CNIT NO. 1 Brunswick Unit No. 1 operated at an 88.26% availability factor for the month of February with an 86.09% capacity factor. There was one off-line outage and three power reductions. Details are in Appendix D The Unit Shutdowns and Power Reduction Log.
There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.
DOCKET NO. 050-0125 UNIT SHUTDOWNS AND POWER REDUCTIONS Brunswick i UNIT NAME DATE March 1984 COMPLETED BY Frances Harrison REPORT MONTH Februnry 1984 TELEPHONE (9194457-9521 e.
4 g
e en g4 Cause & Corrective
.2 _e E
j.s X Licerisee
=*,
Date c;
3g g
jgg Event
- y c.3 Action to
$E E
j if2 g Report,
,#G u
Present Recurrence 6
84-006 01-31-84 F
104.00 A
2 NA XX VESSEL Unit separated from grid to find /secur e of drywell floor and equipment drain leakage and repair.
1 2
3 4
F: Forced Reason:
Method; Exhibit G-Instructions 5: Scheduled A Equipment Failure (Explain) 1.Manisal for Preparation of Data B. Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) l-Continuations i
E Operator Training & Ucense Examination F-Administrative 5-Load Reductions 5
G-Operational Error (Explain) 6-Other Exhibit I-Same Source (9/77)
Hother (Explain) l i
DOCKET NO. 050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick I March lyo*
DATE COMPLETED BY Fra-ces Harrison NME REPORT MONTH hhn,en, 1984 TELEPHONE w.
E E
5_ ?
3 j E5 Licensee g *,
ge.
Cause & Corrective No.
Date g
~g i;
255 Event
~d E6
^
$=
j 53 g Report a mO Prevent Recurrence H
g 6
84-009 02-13-84 F
.00 B
5 NA CB PUMPXX Removed 1A Rx Feedpump from service to allow 16C to check out MCU.
t 1
2 3
4 F: Forced Reason:
Method:
i!xtubit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual io: Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 0161) 4-Continuat. ions E-Operator Training & Ucense Examination F Administrative 5-Load Reductions S
G-Operationa! Error (Explain) 6-Other Exhibit I - Same Source 19/77)
Il-Other (Explain) e
DOCKET NO. 050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME """""
- DATE March 1984 REPORT MONTy February 1984 COMPLETED BY Frances Harrison TELEPHONE (919)457-9521 e.
E E
3?
"h jY3 Licensee j r, gn.
Cause & Corrective Date i
3g 4
Jg5 Event gy gl Action to jgg Report c mV O
Prevent Recurrence H
g 6
F
.00 A
5 NA Reduced power due to 111 D/P across84-010 02-18-84 Radwaste and APRM Upscale.
i 4
1 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) le-Continuations E-Operator Training & Ucense Examination I
F Administrative 5-Load Reduct cns 5
G Operational Error (Explain)
(,-O t he r Exhibit I - Same Source (9/77) li-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 nrunsucx t UNIT NAME DATE March 1984 G4tPLETED gy Frances Harrison REPORT MONTH Februarv 1984 TELEPHONE (919)457-9521 5
E
.5E 3
yY5 Licensee
,E*
g*,
Cause & Corrective Date Eg s
2g&
Event g7
^' " ' "
$=
E jgg Report a mO EO Prevent Recurrence H
g d
84-011 02-25-84 S
.00 B
5 NA Control Rod operability comp. 100%
rod pattern.
l I
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)
E-Operator Training & Ucense Examination 4-Continuat. tons F-Administrative 5-Load Reductions 5
G-Operational Error (Explain) 6-Other Exhibit I - Same Source 19/77)
Il-Other (Explain)
APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 L
UNIT BRUNSWICK UNIT 2 DATE 03/02/04 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 FEBRUARY 1984.
DAY AVG DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(NWE-NET) 1 721 17 746 2
734 18 705 3
736 19 752
.4 717 20 7A1 3
734 21 739 6
735 22 46 7
732 23 171 0
725 24 621
-9 723 25 683 10 683 26 735 11 612 27 731 l
12 731 28 739 13 744 29 739 14" 727 15 729 16 728 1.16 - 8
7.
OPERATTNG DATA REPORT DOCKET NO. 050-0324 DATE 03/02/84 COMPLETED DY FRANCES HARRISON j
TELEPHONE (919)457-9521 OPERATING STATUS 1.
UNIT NAME: BRUNSWICK UNIT 2 1 NOTES I
2.
REPORTING PERIOD: FEBRUARY 84 I
i 3.
LICENSED THERMAL F0WER (MWT): 2436 I
l 4.
NAMEPLATE RATING (GROSS MWE): 867.0 l
l 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
i 6.
HAX DEPENDADLE CAPACITY (GROSS MWE): 815.0 I i
7.-MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 696.00 1440.00 72985.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 671.60 1338.40 46065.82
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 66?.13 1301.06 43086.53 15.- UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1468832.00 2744288.47 81321009.49
- 17. GROSS ELEC. ENERGY. GEN. (MWH) 487062.00 910369.00 27020067.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 471735.00 881155.00 25908973.00
- 19. UNIT SERVICE FACTOR 95.13 90.35 59.03 20..lUNIT AVAILABILITY FACTOR 95.13 90.35 59.03
'22.
UNIT CAP. FACTOR (USING DER NET) 82.56 74.53 43.24
- 23. UNI,T FORCED OUTAGE RATE 4.87 2.66 15.62
- 24. SHyTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
3 OFF-GAS / CONDENSER RETUBING 3/10 - 10/15/84 5500 Hours
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
-26.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: March 1984 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 operated at a 95.13% availability factor for the month of February with an 88.79% capacity factor. There was cne off-line outage and six power reductions. Details are in Appendix D, The Unit Shutdowns and Power Reduction. Log. 1Nie unit is operating at reduced power due to first stage drain tank east MSR manway gasket leak.
.There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick No. I fuel pool.
i
DOCKET NO. 050-0324 UNITSHUTDOWNS AND POWER REDUCTIONS Brunswick II UNIT NAME DATE March 1984 Frances Harrison COMPLETED BY REPORTMONTy February 1984 TELEPHONE D W 457-9521 r.
E c
Licensee j t, je.
Cau e & Corrective
.! E 3
j._E 5 No.
Date g
3g
(
,5 g 5 Event p
g"g Action to H
$E 5
j gji g Report c mL Prevent Recurrence g
6 l
84-008 02-10-84 S
.00 B
5 NA Reduced power for scram testing.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A. Equipment Failure (Explain) 1 Minual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C. Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-0161)
D-Regulatory Restriction l-Continuat. ions i
E-Operator Training & License Examination F-Adnunistrative 5-Load Reductions 5
G-Operational Error (Ex, lain) 6-Other Exhibit I. Same Source 19/77)
Il-Other (Explain)
DOCKET NO. 050-0324
. UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick II DATE March 1984 REPORT MONTH Februarj'1984 COMPLETED BY Frances liarrison TELEPHONE W W) 457-9521 "i
c c.
.5w e g"
.E _e E
2 5 'A Licensee g *r.
g.
Cause & Corrective No.
Date g
gg g
,3gg Event uT
[3 c.
Action to
$E 5
j di g Report #
N0 U
Prevent Recurrence H
6 84-G06 01-14-84 F
.00 A
5 NA CH I!'STRU Operating at reduced power because 1st and 2nd stage reheat isolated due to steam leak on east 1st stage manway drain tank.
i I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-M anual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) l-Continuations i
E-Operator Training & Ucense Examination F Administrative 5-Load Reductions 5
G-Operational Error (Explain)
(,-O t he r Exhibit I Same Source 19/77)
H-Other (Explain)
4 DOCKET NO. 050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME R n m cui cic TT narca i m DATE REPORTMONTH ebruary 1984 COMPLETED BY Frances Harrison F
TELEPHONE (919)457-9521 e.
.! E 3
.E Licensee
,E v.
Cause & Corrective o
No.
Date c;
3 gj g
jg&
Event
- s!
[3 c.
Action to
$E j gg g Report
- N0 O
Prevent Recurrence H
1 6
B4-011 02-18-84 S
.00 B
5 NA Rod improvement 1
t 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sh -ets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) l-Continuations i
E-Operator Training & License Examination F-Administrative 5-Load Reductions 5
GOperational Error (Explain)
(,-Other Exhibit I-Same Source t9/77)
H-Other (Explain)
a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 Brunswick 11 UNIT NAME
- ~
DATE March 1984 F
COMPLETED BY Frances Harrise REPORTMONTM ebruary 1984 TELEPHONE (919)457-9521
% sa =i 8
c er
.E e 25X Licensee g%
g4 Cause & Corrective
~~
No.
Date g
gg
,g g g Event u7 c.3 Action to w"
$E E
j di j Report *
$0 0
Prevent Recurrence 6
34-012 02-18-84 S
.00 B
5 NA Reduced power for debris filter back-wash as per OP-29.
k r
1 I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) l-Continuat ons i
i E-Operator Training & l.icense Examination F-Administrative 5-Load Reductions 5
G-Operationa! Error (Explain) 6-Other Exhibit I-Same Soures (9/77)
H-Other (Explain)
050-0324 DOCKET NO.
UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brun.swick 11 D ATE """" "
- REPORT MONTH February 1984 COMPLETED BY nances 11arrison TELErilONE (919)457-9521 9
.$E 3
Yk Licensee
,Ee, Cause & Corrective No.
Date g
3g ij
,3g5 Event gg Action to f:
5 j iji g Report #
mV Prevent Recurrence H
g 5
84-013 02-17-84 F
.00 A
5 NA Reduced power inorder to establish a stable condenser vac:rtm greater than 26 inches.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A. Equipment Failure (Explain)
I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
- Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction
~
0161)
E-Operator Training & Ucense Examination le-Continuations F-Administrative 5-Load Reduetions 5
G-Operational Error (Explain) 6-Other Exhibis 1 - Same Source (9/77) li-Other (Explain)
i 050-0324 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick II DATE March 1984 Frances Harriso COMPLETED BY REPORT MONTH February 1984 TELEPHONE (919)457-9521 m
B E
5 ?
3 y.E 3 Licensee
,Eg h"
Cause & Corrective 4
Date g
3g i;
jg5 Event p
gg Action to H
y:
E j;jjg Report a mo Prevent Recurrence g
6 34-016 02-22-84 P
33.52 A
3 NA CD VALV0P Rx Scram-Steam line "D" out-board MSIV shutting during performing of PT A22.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2 Manuzi Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) 4-Continuations E-Operator Training & License Examination F-Administrative 5-Load Reductions S
G-Operational Error (Explain) 6-Other Exhibit I - Same Source 19/77)
H-Other (Explain)
1 DOCKET FIO. 050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick II DATE March 1984 COMPLETED BY Frances Harrison REPORT MONTH February 1984
' TELEPHONE (919)457-9521 1
e.
E E
s
,$?
3 jY5 Cause & Corrective Licensee
,Ev, No.
Date g
3g g
,gg&
Event g7 A'
H 5
jgg Report sr mO EO Prevent Recurrence g
h 84-018 02-24-84 F
.00 A
5 NA CH PUMPXX Lost 2B reactor feedpump.
e i
~-
l l
l i
2 3
4 F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manua; for Preparation of D:ta B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-0161)
D-Regulatory Restriction 4-Continuat.ons E-Operator Training & License Examination F-Administr9tive 5-Load Reductions 5
G4perational Error (Explain) 6-Other Exhibit I Same Source 19/77)
H-Other (Explain)
j eo CP&L Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC ' 28461-0429 March 5, 1984
-FILE:
B09-13510C SERIAL: BSEP/84-0538 Mr. R. C. DeYoung, Director
' Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 MONTHLY OPERATING REPORT
. i' ear Mr. DeYoung:
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2, Cr., lina Power & Light Company herewith stibmits the report of operating statistics and 4hutdown experience for the
/
month of February 1984.
Very traly yours, 4.4 C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/kal/LETJA Enclosures cc: