List of results
- ML20087J194 + (19:16:32, 13 December 2024)
- ST-HL-AE-5079, Application for Amends to Licenses NPF-76 & NPF-80.Amends Would Change Requirements for Operable Channels of Core Exit Thermocouples + (19:16:33, 13 December 2024)
- ML20087J183 + (19:16:34, 13 December 2024)
- ML20087J177 + (19:16:34, 13 December 2024)
- 05000250/LER-1984-007, :on 840216,while at Steady Operation,Dual Unit Trip Occurred from 100% Power,Resulting in Loss of 4,160- Volt Buses 3C & 4C.Caused by Bolt in Breaker 4AC01 Cubicle Door Travel.Doors Checked for Proper Clearance + (19:16:36, 13 December 2024)
- ML20087J159 + (19:16:37, 13 December 2024)
- ML20087J153 + (19:16:38, 13 December 2024)
- ML20087J139 + (19:16:39, 13 December 2024)
- ML20087J112 + (19:16:41, 13 December 2024)
- ML20087J124 + (19:16:41, 13 December 2024)
- ML20087J109 + (19:16:42, 13 December 2024)
- JAFP-84-0228, Responds to NRC Re Violations Noted in IE Insp Rept 50-333/83-28.Corrective Actions:Review of safety- Related Work for Period of Time from Start of Commercial Operation to 780131 Will Be Completed by 840909 + (19:16:43, 13 December 2024)
- ML20087J073 + (19:16:43, 13 December 2024)
- ML20087J063 + (19:16:47, 13 December 2024)
- ML20087J055 + (19:16:50, 13 December 2024)
- ML20087J051 + (19:16:50, 13 December 2024)
- PLA-2130, Completes Response to IE Bulletin 83-07, Apparently Fraudulent Products Sold by Ray Miller,Inc & Two Suppls. No Ray Miller,Inc Matl Installed.Nuclear Energy Svc,Inc Supplied Ultrasonic Calibr Blocks + (19:16:54, 13 December 2024)
- ML20087J043 + (19:16:55, 13 December 2024)
- 05000275/LER-1984-006, :on 840217,four 4.16 Kv Circuit Breakers Failed to Remain Closed.Caused by Excessive Wear in Teflon Coated Fiberglass Sleeve Bearings Used in Mechanical Actuator. Breakers Repaired + (19:17:02, 13 December 2024)
- 05000267/LER-1984-003, :on 840212,automatic Plant Protective Sys Reactor Scram Initiated by One of Two Logic Trips Involving Nuclear Startup Channel Ii.Caused by Insertion of Fuel Block Containing Neutron Startup Source + (19:17:04, 13 December 2024)
- ML20087J029 + (19:17:05, 13 December 2024)
- ML20087J025 + (19:17:06, 13 December 2024)
- B15193, Application for Amend to License NPF-49,requesting Exemption from Requirements of III.D.2 & III.D.3 of App J to 10CFR50 to Permit Plant to Perform Type B & C Tests & Bypass Leakage Tests Beyond 24 Months + (19:17:07, 13 December 2024)
- ML20087J016 + (19:17:08, 13 December 2024)
- ML20087J017 + (19:17:08, 13 December 2024)
- B15162, Application for Amend to License NPF-49,revising 24-month Fuel Cycle + (19:17:09, 13 December 2024)
- ML20087J005 + (19:17:10, 13 December 2024)
- ML20087J008 + (19:17:10, 13 December 2024)
- B14783, Application for Amend to License NPF-49,revising DG Fuel Oil Testing Performed on New Fuel Prior to Addition of New Fuel to Storage Tank + (19:17:11, 13 December 2024)
- ML20087H999 + (19:17:12, 13 December 2024)
- ML20087H996 + (19:17:13, 13 December 2024)
- B15196, Application for Amend to License NPF-49,revising Action Statement of LCO 3.7.5 to Permit Plant Unit 3 to Remain in Modes 1-4 W/Average Water Temp of UHS Greater than 75 Degrees F for 12 H + (19:17:16, 13 December 2024)
- ML20087H984 + (19:17:17, 13 December 2024)
- ML20087H977 + (19:17:18, 13 December 2024)
- ML20087H981 + (19:17:18, 13 December 2024)
- PLA-2100, Responds to NRC Re Violations Noted in IE Insp Rept 50-387/83-23.Corrective Actions:Total Responsibility Assumed for Design Change Process & Program for Processing FSAR Change Requests Adopted + (19:17:19, 13 December 2024)
- 05000311/LER-1984-003-01, :on 840215,pressurizer Overpressure Protection Sys Actuated Due to Induced Pressure Transient.Caused by Starting Reactor Coolant Pump.Operating Procedure OPII-1.3.4 Amended + (19:17:21, 13 December 2024)
- U-602481, Requests That Action Requested by GE Supporting Change in Mislocated Fuel Bundle Event Acceptance Criteria Be Considered Cost Beneficial Licensing Action for CPS in Accordance W/Nrc Administrative Ltr 95-02 + (19:17:22, 13 December 2024)
- 3F0495-17, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/95-07.Corrective Actions:Counselled Maint Crew Members Conducting Procedure Re Event + (19:17:23, 13 December 2024)
- ML20087H960 + (19:17:23, 13 December 2024)
- ML20087H954 + (19:17:24, 13 December 2024)
- ML20087H946 + (19:17:27, 13 December 2024)
- ML20087H941 + (19:17:28, 13 December 2024)
- PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License + (19:17:29, 13 December 2024)
- NRC-84-0044, Responds to Three NRC Questions Re Analysis of Steam Generator Tube Rupture Event,Contained in Fsar.Util Reanalyzing Condition Using Operator Times from Actual Events & ANS Draft Std 58.8.Rept Expected by 840630 + (19:17:29, 13 December 2024)
- ML20087H932 + (19:17:30, 13 December 2024)
- ML20087H931 + (19:17:31, 13 December 2024)
- ML20087H928 + (19:17:32, 13 December 2024)
- PY-CEI-NRR-1934, Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS + (19:17:32, 13 December 2024)
- ML20087H916 + (19:17:34, 13 December 2024)
- NRC-84-0046, Forwards Requested Changes to Final Draft Tech Specs.List of Tech Specs Discussed W/Description of Status & Action Required Also Encl + (19:17:34, 13 December 2024)
- ML20087H914 + (19:17:35, 13 December 2024)