Responds to IE Bulletin 83-07, Apparently Fraudulent Products Sold by Ray Miller,Inc. Companies Supplying Matls or Svcs to Facilities Listed.No Matl Purchased from Ray Miller,Inc
ML20087H960
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/14/1984
From: Liden E
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-83-07, IEB-83-7, NUDOCS 8403220036
Download: ML20087H960 (4)


Text

r --

?

?..

OPSEG Pubhc Service Electric and Gas C ompany P.O. Box 236 Hancocks Bndge, New Jersey 08038 Nuclear Department March 14, 1984 Dr. Thomas E.

Murley U.

S.

Nuclear Regulatory Commission 631 Park Avenue King of Prussia, P A 19406

Dear Dr. Murley:

IE BULLETIN 83-07 APP ARENTLY FRAUDULENT PRODUCTS SOLD BY RAY MILLER, INC.

S ALEM GENER ATING ST ATION NO. 1 AND 2 UNITS DOCKET NOS. 50-272 AND 50-311 PSE&G has performed the following actions in response to the referenced Bulletin.

Item la Based on a review of the lists of Ray Miller, Inc.

customers who received apparently fraudulent materials and pertinent information obtained from any of these companies, identify those that supplied materials or services to Salem.

Response

PSE&G has reviewed the companies listed on Attachments 1 and 2 of this Bulletin and in Supplements 1 and 2 to the Bulletin.

We have determined that the following companies on our approved vendors list supplied materials or services to Salem:

American Standard Company Buffalo Tank Dravo Corporation Huntington Alloys Joy Manufacturing Permutit Company Richmond Engineering Company Item lb Determine whether any of the apparently f raudulent Ray Miller, Inc., materials were provided to or used at Salem.

The Energy People

/

I 4/03 N 06.Th n_m n

.<g

.s U.

S.

Nuclear Regulatory 3/14/84 Commission

Response

Our investigation concluded that Ray Miller, Inc. is not an approved vendor, and no material has been purchased from that company for use at Salem, nor have any of the companies listed in Item la above provided material supplied by Ray Miller, Inc.

To preclude any inappropriate use of material supplied by vendors that obtain material from Ray Miller, Inc., PSE&G has taken the following actions:

1.

Vendor mill test reports are examined to determine the vendor's source.

2.

0A Receiving Control has been instructed to segregate and tag any material that vendors obtain from Ray Miller, Inc.

Such' material will not be installed in safety-related systers pending disposition of the deficiency reports.

The Bulletin identifies a general concern that some vendors may substitute substandard or nonconforming materials and provide fraudulent documentation.

PSE&G will implement measures to

-prevent fraudulent practices and intercept substandard materials.

Additionally, we will require that vendors also take actions to prevent fraudulent practices.

These measures and schedules for implementing them are as follows1

. SHORT-TERM ACTIONS 1.

Purchase orders or contract documents will include a caution that all materials may be subjected to, verification by an independent testing facility.

PSE&G will also require all documents from foreign suppliers to be translated into English and'the translation " notarized.

2.

Ref resher, training will be provided to the.'OA/0C receiving group in the following areas :

a.

Recognition of altered documents,' and

+

b.

Comparison of certification documents with hardware received.

.The short-term actions will be implemented by May 1, 1984.

. :. s'

  • ~

U."S.' Nuclear ~ Regulatory -

3/14/84

. Commission

. LONG-TERM - ACTIONS

.l..

Applicable OA procedures will be revised to include a statement: instructing the responsible OA engineer to verify during. the : audit or surveillance activity that the OA programs of our vendors addressuthe subject of " altered documents".

2.

A' plan? and procedure for sampling selected incoming material Jwill be; implemented.

1The long-term' actions will be implemented by August 1,1984.

Should you.have any questions, please do not hesitate to contact us..

Sincerely, E.

A.

Liden y

Manager - Nuclear Licensing'and Regulation

RSP :mg cca M r.' Donald C.:Fischer-Licensing. Project Manager.

. Mr.-James Linville Senior: Resident Inspector L U.' S.. Nuclear ~ Regulatory Commission Document Control Desk

- Washington,.D.

C.-

20555 E

4 4

a l

T I[

w W

jf v

-~Ty-+-

P y-

"}++W.

q>

r--

'W5

-g b

^Fy--

-- -- " y v-9 n g

f-9 4

  • T*y

-iM7'eg vFv' y 9 7-"*

+v-=

y1f

-]

s,

-2.,

STATE OF NEW JERSEY

)

)

SS.

COUNTY OF SALEM

)

RICHARD A. UDERITZ, being duly sworn according to law deposes and says:

I am a Vice President of Public Service Electric and Gas Company, and as such, I find that matters set forth in our response dated March 14, 1984, to IE BULLETIN 83-07 "Apparently Fraudulent Products Sold by Ray Millor, Inc.",

are true to the best of my knowledge, information and belief, b_

RICH ARD A. CDERIT #

e Subscribeds and sworn to before' me this /5b day of bM

, 1984 YAA>

Ok4J g; Notary Public <>'New Jersey

+ * '

DEu ks g My Commission ez;..za wh.Y 8f NerJersey

- m n. um

-