Proposed Tech Specs,Revising DG Fuel Oil Testing Performed on New Fuel Prior to Addition of New Fuel to Storage Tank
ML20087J005
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/28/1995
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20087J003 List:
References
NUDOCS 9505050178
Download: ML20087J005 (4)


Text

. __,

.h ;

'u' j

t i

Docket No. 50-421-i B14783 r:

l i

i i

f Millstone Nuclear Power Station, Unit No. 3 Proposed Revision to Technical Specifications Emergency Diesel Generator Fuel Oil Sampling Requirements Marked-Up Page i

r e

i f

i t

i l

i April 1995

bN 1r wAca wasz, A,o serum:

-rarrez> esa Acceed wem ASTH 2)nu-82.

p-ELECTRICAL POWER SYSTEMS January 3,1995 SURVEILLANCE REQUIRENENTS (Continued) b)

A kinematic viscosity at 40*C of greater than or equal to 1.9 contistokes, but less than or equal to 4.1 contistokes

-(alternatively, Saybolt visc ity, SUS at 100*F of greater than or equal to 32.6, but no less than or equal to

(

40.1), if gravity was not e ined by comparison with the supplier's certification; c)

A flash point equal to or greater than 125'F; and d) clearandbrIghtappearancewithpropercolor en tested in accordance with ASTM-D4176-82.

a2 L

~yT T 2)

By verifying within 30 days of obtaining the sample that the 2

other properties specified in Table 1 of ASTM-D975-81 are met k

when tested in accordance with ASTM-D975-81 except that the j

9y analysis for sulfur may be performed in accordanc with ASTM-E D1552-79, ASIN-D2622-82 or ASTM-D4294-83.

d f.

y'V At least once every 31 days by obtainiNying tsat total particulate a samale of fuel oil in 4

accordance with ASTM-D2276-78, and ver

,i d #

9 contamination is less than 10 mg/ liter when checked in accordance Qg with ASTM-D2276-78, Method A; g

2 At least once per 18 months, during shutdown, by:

o1*fa4 1)

Subjecting the diesel to an inspection in accordance with E

procedures prepared in conjunction with its manufacturer's n

3jj$

recommendations for this class of standby service; l

jR 2) 3 Verifying the generator capability to reject a load of greater n

. i

~

$1 than or equal to 595 kW while maintaining voltage at 4160 1 420 fgg volts and frequency t 60 1 3 Hz; j

s

-3

- @f a

l 3)

Verifying the generator capability to reject a load of 4986 kW i

y without tripping. The generator voltage shall not exceed 4784 2

volts during and following the load rejection; 4)

Simulating a loss-of-offsite power by itself, and:

d a)

Verifying deenergization of the emerge cy busses and load 4

shedding from the emergency busses, and j

b)

Verifying the diesel starts on the auto-start signal, energizes the emergency busses with permanently connected loads within 11 seconds, energizes the auto-connected shutdown loads through the load sequencer and operates for greater than or equa to 5 minutes while its generator is t

loaded with the shutdown loads. After energization, the steady-state voltage and frequency of the emergency' busses shall be maintained at 4160 1 420 volts and 6010.8 Hz during this test.

NILLSTONE - INIIT 3 3/48-5 Amendment No. (, 3, M. U,100

    • t3JY

-.~,.

t';. i' '

2

.l Docket'No. 50-423 l

B14783 l

l t

f f.

i

>t i

s h

Attachment 2

Millstone Nuclear Power Station, Unit No. 3 Proposed Revision to Technical Specification Emergency Diesel Generator Fuel Oil Sampling Requirements Retyped Pages l

{

r t

i f

I t

i April 1995 I

-a

g:

Q '

y

?

'/

SURVEILLANCEREQUIRENENS-(Continued) b)

A kinematic viscosity at 40*C of greater than or equal to l.9 centistokes, but less than or. equal to 4.1 centistokes (alternatively, Saybolt viscosity, SUS at 100*F of greater than or equal to 32.6, but less than or equal to 40.1), if l

l 4

gravity was not determined by comparison with the supplier's certification; c)

A flash point equal to or greater than 125'F; and d)

Water and sediment less than 0.05 percent by volume when tested in accordance with ASTM-D1796-83.

l 2)

By verifying within 30 days of obtaining the sample that the other properties specified in Table 1 of ASTM-D975-81 are met when tested in accordance with ASTM-D975-81.except that:

(1) the cetane index shall be determined in accordance with ASTM-D976 (this test is an appropriate approximation for cetane l

number as stated in ASTM-D975-81 [ Note E]), and (2) the analysis for sulfur may be performed in accordance with ASTM-D1552-79, ASTM-D2622-82 or ASTM-D4294-83.

f.

At least once every 31 days by obtaining a sample of fuel oil in accordance with ASTM-D2276-78, and verifying that total particulate contamination is less than 10 mg/ liter when checked in accordance with ASTM-D2276-78, Method A; g.

At least once per 18 months, during shutdown, by:

1)

Subjecting the diesel to an inspection in accord w.e with procedures prepared in conjunction with its marafacturer's recommendations for this class of standby service; l

2)

Verifying the generator capability to reject a load of greater than or equal to 595 kW while maintaining voltage at 4160 1 420 volts and frequency at 60 1 3 Hz; 3)

Verifying the generator capability to reject a load of 4986 kW without tripping. The generator voltage shall not exceed 4784 volts during and following the load rejection; 4)

Simulating a loss-of-offsite power by itself, and:

a)

Verifying deenergization of the emergency busses and load shedding from the emergency busses, and j

b)

Verifying the diesel starts on the auto-start signal, energizes the emergency busses with permanently connected loads within 11 seconds, energizes the auto-connected shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the shutdown loads. After energization, the steady-state voltage and frequency of the emergency busses i

shall be maintained at 4160 420 volts and 60 1 0.8 Hz during this test.

MILLSTONE - UMIT 3 3/4 8-3 Amendment No. J. Jp, (J 77 Jpp.

OM1

.