ML20087J159
| ML20087J159 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 03/20/1984 |
| From: | Levin H TERA CORP. |
| To: | Jackie Cook, Eisenhut D, James Keppler CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), Office of Nuclear Reactor Regulation |
| References | |
| OL, OM, NUDOCS 8403220100 | |
| Download: ML20087J159 (5) | |
Text
I L J March 20,1984 Mr. James W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 Mr. J. G. Keppler Administrator, Region ill Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. D. G. Eisenhut Director, Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket Nos. 50-329 OM, OL and 50-330 OM, OL Midland Nuclear Plant - Units I and 2 Independent Design and Con =truction Verification (IDCV) Program Meeting Notice - Eighth OCR Status Review Meeting Date:
Marc h 28,1984 Time:
9:00 AM Location: Bechtel Offices Conference Room IBl/IB2 777 East Eisenhower Parkway Ann Arbor, Michigan
Subject:
Discussion and Status of Confirmed items and Findings Agendo:
See Attachment !
8403220100 e40320
{DRADOCK 05000329 PDR TERA CORPORATION 7101 WISCONS;N AVENUE BETHESDA MAFMAND 20814 301 654 8960
Multiple Addressees
Participants:
H. Levin, et al., TERA L. Gibson, et al., Consumers Power Company J. Milhoon, H. Wang, NRC, l&E HQ R. Burg, et al., Bechtel Since ely,
, mm Howard A. Levin Project Manager Midland IDCV Program cc:
Participants R. Erhardt, CPC D. Budzik, CPC D. Quammy, CPC (site)
J. Agar, Babcock & Wilcox R. Whitaker, CPC (site)
J. Taylor, NRC, I&E T. Ankrum, NRC, I&E D. Hood, NRC, NRR J. Ko r, S&W (site)
Midland IDCVP Service List HAL/sl TERA CORPORATION
SERVICE LIST FOR MIDLAFO INDEPEf0ENT DESIGN AIO CONSTRUCTION VERIFICATION PROGRAM cc:
F'orold R. Denton, Director Ms. Barboro Stamiris Office of Nuclear Reactor Regulat. ion 5795 N. River U.S. Nuclear Regulatory Commissim Freeland, Michigan 48623
. Washington, D.C. 20555 Mr. Wendell Marshall James G. Keppler, Regional Administrator Route 10 U.S. Nuclear Regulatory Commission, Midland, Michigan 48440 Region ill 799 Roosevelt Road Mr. Steve Godler Glen Ellyn, Illinois 60137 2120 Carter Avenue U.S. Nuclear Regulatory Commision Resident inspector: Office Ms. Billie Pirner Garde Route 7 Director, Citizens Clinic Midland, Michigan 48640 for Accountable Government Government Accountability Project Mr. J. W. Cc,ok Institute for Policy Studies Vice President l901 Gue Street, N.W.
Consumers Power Company Washington, D.C. 20009 1945 West Pornoll Road Jackson, Michigon 49201 Charles Bechhoefer, Esq.
Atomic Safety & Licensing Board Michael I. Miller, Esq.
U.S. Nuclear Regulatory Commission Isham, Lincoln & Beoie Washington, D.C. 20555 Three First National Plaza, Sist floor Dr. Frederick P. Cowan Chicago, Illinois 60602 Apt. B-125 6125 N. Verde Trail James E. Brunner, Esq.
Boca Roton, Florido 33433 Consumers Power Company 212 West Michigan Avenue Jerry Harbour, Esq.
Jackson, Michigan 49201 Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Ms. Mary Sincla.ir Washington, D.C. 20555 5711 Summerset Dr.ive Midland, Michigo, 48640 Mr. Ron Collen Michigan Public Service Commission rY & FIYm 6545 Mercontile Way Suite 3700 P.O. Box 30221 Three First National Plaza Lansing, Michigan 48909 Chicago, Illinois 60602 Mr. Paul Rcu Ms. Lyme Bernobe.'
Midland Daily News Government Accountability Project 124 Mcdonald Street 1901 Q Street, NW Midland, Michigan 48640 Washington, D.C. 20009 9
o ATTACHMENTI MIDLAPO ltOEPEtOENT DESIGN AND CONSTRUCTION VERIFICATION PROGRAM AGEFOA FOR MARCH 28,1984 OCR STATUS REVIEW MEETING BECHTEL OFFICES APN ARBOR, MICHIGAN 1.
Estimated Time Start:
9:00 AM Lunch:
12:00 PM to 12:45 PM Adjournment: 3:00 PM 11.
Discussion of Confirmed items, Findings, Observations, and Resolved items item TERA Lead A.
Mechanical / Systems e R-026*
Dougherty e Z-043*
Dougherty e C-Il2 Setka e R-129*
Witt e C-133 Setka e C-144 Witt e C-148, C-149, C-150 Setka e B-158*
Dougherty B.
Electrical e R-097*
Witt e C-109 Setka e C-110*
Setka e R-ill*
Setka e R-132*
Setka e R-134*
Setka e C-135 Setka e C-141 Setka e C-146 Setka e C-147 Setka e C-153*
Dougherty e B-159*
Setka
i I
l ATTACHMENTI (Continued)
C.
Civil / Structural e F-015*
Mortgot e R-071*
Mortgat e R-102*
Mortgot e R-103*
Mortgot e R-114*
Mortgot e R-il6*
Mortgot e B-155*
Mortgot e C-156*
Mortgat e C-157*
Mortgat 111.
Presentation of plans / schedule for response Burg to issues discussed at the March I,1984, (Bechtel) civil / structural review meeting.
IV.
Discussion of programmatic issues - as required.
V.
Discussion of Action items and Logistics for Information Exchange Notes: 1.
Items are grouped to the degree practical to facilitate discussion and minimize manpower requirements during the entire meeting.
2.
Items that changed status during the February reporting period are c enoted with an usierisk.
3.
The following OCRs have not reached a final disposition; however, further TERA or Midland Project actions have been identified during post public meetings.
Accordingly, discussions are not contemplated by TERA unless the Midland Project has identified new information that is pertinent to the ongoing activities.
s C-005 e F-050 e C-022 e F-052 thru -056 e F-031 e C-077 e F-036 e C-084 l
e C-038 e C-085 e F-047 e C-087 thru -089 e C-048 e F-091 e F-049 e F-092 thru -096 I
v v
T--
w y
m ee