Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087M981 + (18:59:13, 13 December 2024)
- ML20087M978 + (18:59:14, 13 December 2024)
- ML20087M976 + (18:59:16, 13 December 2024)
- ML20087M975 + (18:59:17, 13 December 2024)
- ML20087M973 + (18:59:18, 13 December 2024)
- ML20087M972 + (18:59:19, 13 December 2024)
- ML20087M968 + (18:59:20, 13 December 2024)
- ML20087M957 + (18:59:22, 13 December 2024)
- ML20087M966 + (18:59:22, 13 December 2024)
- ML20087M953 + (18:59:23, 13 December 2024)
- ML20087M955 + (18:59:23, 13 December 2024)
- ML20087M950 + (18:59:24, 13 December 2024)
- ML20087M949 + (18:59:25, 13 December 2024)
- ML20087M943 + (18:59:27, 13 December 2024)
- ML20087M934 + (18:59:28, 13 December 2024)
- ML20087M932 + (18:59:28, 13 December 2024)
- ML20087M926 + (18:59:29, 13 December 2024)
- AECM-84-0179, Application for Amend to License NPF-13,changing Tech Spec Table 3.7.4-2 to Add Mechanical Snubber Q1E51G18OR01 to RCIC Sys + (18:59:30, 13 December 2024)
- ML20087M919 + (18:59:30, 13 December 2024)
- ML20087M918 + (18:59:31, 13 December 2024)
- NRC-84-0056, Forwards Rev 2 to Util Rept on Control of Heavy Loads, Updating 820804 & 840127 Submittals.Rev Provides New App E, Summarizing Westinghouse Analysis of Special Lifting Devices & Revises App C, Analyses of Reactor Vessel Head Drop + (18:59:32, 13 December 2024)
- 05000250/LER-1984-008, :on 840223,during Auxiliary Feedwater Sys Test, Pump B Removed from Svc When Flow Oscillations Observed. Caused by Defective Differential Pressure Cell.Cell Repaired & Pump B Returned to Svc + (18:59:34, 13 December 2024)
- 05000325/LER-1984-004-01, :on 840131,0301,02,09 & 14,control Bldg Emergency Air Filtration Trains a & B Actuated.Possibly Caused by Painting in Area,Cooking Fumes & Spurious Control Room Fire Alarm.Corrective Actions Evaluated + (18:59:36, 13 December 2024)
- ML20087M904 + (18:59:37, 13 December 2024)
- ML20087M903 + (18:59:38, 13 December 2024)
- ML20087M901 + (18:59:39, 13 December 2024)
- ML20087M900 + (18:59:40, 13 December 2024)
- ML20087M897 + (18:59:40, 13 December 2024)
- RBG-17-351, Interim Deficiency Rept DR-107 Re Category I 125-volt Air Circuit Breakers Supplied by Gould Brown-Boveri Electric, Inc.Investigation Incomplete.Next Rept Will Be Provided by 840510 + (18:59:41, 13 December 2024)
- ML20087M893 + (18:59:42, 13 December 2024)
- ML20087M889 + (18:59:43, 13 December 2024)
- ML20087M891 + (18:59:43, 13 December 2024)
- ML20087M882 + (18:59:44, 13 December 2024)
- GO2-84-110, Advises That Insp Item 83-50-04 (from 831214 Insp of Fire Protection Sys) Re Lack of Thermal Lagging on Redundant Electrical Distribution Panels Providing Safe Shutdown Capability Closed.Panels Lagged Prior to Fuel Loading + (18:59:45, 13 December 2024)
- ML20087M875 + (18:59:45, 13 December 2024)
- ML20087M870 + (18:59:49, 13 December 2024)
- ML20087M866 + (18:59:53, 13 December 2024)
- ML20087M861 + (18:59:54, 13 December 2024)
- RBG-17-357, Interim Deficiency Rept DR-168 Re Interpretation of W3 Welding Procedure.Investigation Incomplete.Interim or Final Status Rept Will Be Provided by 840524 + (18:59:55, 13 December 2024)
- W3P84-0709, Requests Review of Encl Exceptions from 10CFR50,App R Technical Requirements for Reactor Auxiliary Bldg,Per Ser. Generic Ltr 83-33 Used to Reevaluate Compliance W/Technical Requirements + (18:59:57, 13 December 2024)
- ML20087M853 + (18:59:58, 13 December 2024)
- ML20087M852 + (18:59:59, 13 December 2024)
- ML20087M851 + (19:00:00, 13 December 2024)
- ML20087M850 + (19:00:02, 13 December 2024)
- ML20087M847 + (19:00:03, 13 December 2024)
- 3F0384-19, Forwards Fee for Review of Tech Spec Change Request 103,per 830414 Submittal,In Response to 840316 Request + (19:00:04, 13 December 2024)
- ML20087M842 + (19:00:04, 13 December 2024)
- RBG-17-358, Interim Deficiency Rept DR-121 Re Motor Control Ctr Equipment Supplied by Ite Gould,Inc.Investigation Incomplete.Interim or Final Rept Will Be Provided by 840424 + (19:00:05, 13 December 2024)
- B11092, Forwards Response to NRC 840116 Request for Addl Info Re 480 Series Questions on Containment Sys.Response to Request Numbers 480.11,19 & 34 Will Be Submitted by 840410.W/one Oversize Table.Aperture Card Is Available in PDR + (19:00:06, 13 December 2024)
- ST-HL-AE-1052, Confirms That Response to 840105 Notice of Violation Contained in IE Insp Repts 50-498/83-22 & 50-499/83-22 Will Be Submitted by 840221,per 840131 Telcon + (19:00:07, 13 December 2024)
- ML20087M832 + (19:00:08, 13 December 2024)
- ML20087M828 + (19:00:10, 13 December 2024)