ML20087M901

From kanterella
Jump to navigation Jump to search
Forwards marked-up Proposed Proof & Review Tech Specs Re Fire Detection Instrumentation Limiting Condition for Operation & Plant Sys,Per 840316 & 21 Telcons
ML20087M901
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 03/22/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20087M902 List:
References
NUDOCS 8404020132
Download: ML20087M901 (1)


Text

r D

DUKE POWER GOMPANY P.O. HOK 33189 CHARLOTTE, N.o. 28242 HAL B. TUCKER TELEPHONE vms ressment (704) o73-4531 March 22, 1984

-= r-=

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Ms'. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station, Unit 1 Docket No. 50-413 Proof and Review Technical Specifications

Dear Mr. Denton:

Based on the telephone conversations of March 16, 1984 and March 21, 1984 between Mr. Dennis Kubicki, of your staff, and representatives of Duke Power Company, attached are our proposed changes to the Catawba Proof and Review Technical Specifications.

U Very truly yours,

{

l

.h !.

-Hal B.~ Tucker RWO/php Attachment cc:

Mr. James P. O'Reilly. Regional Administrator U. S. Nuclear Regulatory Commission 1 Region II 101 Marietta Street, NW, Suite 2900' Atlanta, Georgia 30303

.NRC Resident Inspector Catawba Nuclear Station 9,.,

ng Mr. Robert Guild, Esq.

,g,_

Attorney-at-Law I-P. O. Box 12097 Charleston South Carolina 29412 f; 10 0o lg Palmetto Alliance 3-g 21351s Devine Street

' @i5 Columbia, South Carolina 29205 pdl i04 Mr. Jesse L. Riley

{gg I

&a,u, Carolina-Environmental Study Group I f i

-854 Henley Place

(

-Charlotte, North Carolina 28207