ML20087M889
| ML20087M889 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/15/1984 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 1-416, NUDOCS 8404020118 | |
| Download: ML20087M889 (1) | |
Text
-
TOLEDO
%mm EDISON RCHAAo P. CROUSE Docket No. 50-346 gyt (4191259 5221 License No. NPF-3 Serial No. 1-416 JRINCIPAL STAEF (AA
(@ iPRV '&
March 15, 1984 D/RA DE _
/
A/RA DWSE QH RC ORMA (A0 SCS IGA NR.
/
EId
'~
' File N#
~f&f l~o DRrtsP United States Nuclear Regulatory Commission Regional Administrator, Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Regional Administrator:
Enclosed are six (6) copies of Temporary Modification #T-7718 to Revision 20 of the currently approved and effective " Industrial Security Plan," AD 1808.00, for the Davis-Besse Nuclear Power Station.
This revision is being submitted pursuant to 10 CFR 50.54(p) as the report containing a description of the change.
Very truly yours, f
+
RPC: ARS :gj Enclosures
,cc:.DB-1 NRC Resident Inspector - w/o attachments 5
I I
B404020118 840315 PDR ADOCK 0500034 F
0 bDW THE TOLEGO EDISON COMPANY EOISON PLAZA 300 MAOISON AVENUE TOLEOO. OHIO 43652 g 26 #