Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091B970 + (17:42:12, 13 December 2024)
- LD-92-045, Submits Listing of Deviations Between Acceptance Criteria of NRC Std Review Plan & Sys 80+ Design Certification Application & Submits Std Review Plan Comments + (17:42:13, 13 December 2024)
- ML20091B967 + (17:42:14, 13 December 2024)
- B14086, Forwards Changes to Initial Test Program for Item 71 of FSAR Table 14.2-1.Changes Cover Spent Fuel Pool Cooling Sys,Boron Thermal Regeneration Sys,Turbine Generator & CRD Sys + (17:42:17, 13 December 2024)
- ML20091B949 + (17:42:18, 13 December 2024)
- ML20091B945 + (17:42:18, 13 December 2024)
- ML20091B941 + (17:42:20, 13 December 2024)
- 05000325/LER-1992-008, :on 920302,during Hot Shutdown,Spurious Trip of Chlorine Detector Led to AOP & Automatic Isolation of Control Bldg Ventilation.Possibly Caused by Spurious Actuation of Detector.Job Order Initiated + (17:42:22, 13 December 2024)
- ML20091B933 + (17:42:23, 13 December 2024)
- 05000282/LER-1992-002-02, :on 920224,discovered That 4,160-volt Ac Breaker Lockout Relay Reset Circuit for Safeguards Pump Motors Not Completely Protected by Redundant Fusing. Replacement Fuses Staged Near Panels + (17:42:24, 13 December 2024)
- AECM-84-0156, Forwards Response to NRC Re Violations Noted in IE Insp Rept 50-416/83-58.Corrective Actions:Memo Issued to Maint Superintendents Informing of FSAR Requirement & Plant Administrative Procedure 01-S-01-11 Revised + (17:42:25, 13 December 2024)
- ML20091B893 + (17:42:26, 13 December 2024)
- ML20091B892 + (17:42:27, 13 December 2024)
- ML20091B873 + (17:42:27, 13 December 2024)
- ML20091B868 + (17:42:28, 13 December 2024)
- ML20091B866 + (17:42:29, 13 December 2024)
- ML20091B861 + (17:42:30, 13 December 2024)
- ML20091B859 + (17:42:31, 13 December 2024)
- ML20091B858 + (17:42:31, 13 December 2024)
- AECM-84-0260, Forwards Supplemental Response to NRC Re Violations Noted in IE Insp Rept 50-416/83-58.Corrective Actions:Rev 8 Issued to Plant Administrative Procedure 01-S-01-11 & Violation Reviewed by Safety Review Committee + (17:42:32, 13 December 2024)
- 3F0584-09, Forwards Recent Correspondence W/Epa,Per Tech Specs App B, Part Ii,Section 3.2 Re Sample Gathering for 316 Study & Denial of Relief from Delta T Limitations Requested on 840424 + (17:42:33, 13 December 2024)
- ML20091B831 + (17:42:33, 13 December 2024)
- ML20091B821 + (17:42:34, 13 December 2024)
- RBG-17-850, Interim Deficiency Rept DR-134 Re Four Lines Located at Outlet of Each RHR Sys HX Shell.Next Rept Will Be Provided by 840720 + (17:42:35, 13 December 2024)
- PY-CEI-NRR-1460, Forwards Requested Changes to Bases for TSs to Incorporate Miscellaneous Changes Not Associated W/Any Future TS Change Requests + (17:42:35, 13 December 2024)
- ML20091B810 + (17:42:36, 13 December 2024)
- ML20091B800 + (17:42:37, 13 December 2024)
- ML20091B798 + (17:42:39, 13 December 2024)
- AECM-84-0303, Responds to 840508 Request for Addl Info on Proposed Changes to Tech Specs Re Min Suppression Pool Water Level.Response to Item 1.5 of Request for Addl Info & Info Re Safety Review Committee Encl + (17:42:40, 13 December 2024)
- 2CAN070109, Submits Proposed Rev to Tech Specs 3.2.1 & 3.2.4 Re Power Distribution Limits,Per NRC 910429 Request + (17:42:41, 13 December 2024)
- ML20091B789 + (17:42:41, 13 December 2024)
- ML20091B786 + (17:42:42, 13 December 2024)
- ML20091B787 + (17:42:42, 13 December 2024)
- ML20091B784 + (17:42:43, 13 December 2024)
- ML20091B783 + (17:42:44, 13 December 2024)
- ML20091B779 + (17:42:44, 13 December 2024)
- ML20091B776 + (17:42:45, 13 December 2024)
- ML20091B778 + (17:42:45, 13 December 2024)
- ML20091B770 + (17:42:46, 13 December 2024)
- ML20091B768 + (17:42:47, 13 December 2024)
- ML20091B761 + (17:42:47, 13 December 2024)
- ML20091B752 + (17:42:48, 13 December 2024)
- 3F0584-10, Discusses Generic Ltr 81-21, Natural Circulation Cooldown, Per NRC .Reactor Vessel Head Voiding During Natural Circulation Cooldown Not Safety Concern,Provided Reactor Operators Equipped W/Adequate Training & Procedures + (17:42:49, 13 December 2024)
- ML20091B739 + (17:42:49, 13 December 2024)
- ML20091B735 + (17:42:50, 13 December 2024)
- W3P84-1485, Notifies That Response to 840514 Request for Addl Financial Info Will Be Provided by 840601 + (17:42:50, 13 December 2024)
- ML20091B733 + (17:42:51, 13 December 2024)
- ML20091B728 + (17:42:52, 13 December 2024)
- ML20091B731 + (17:42:52, 13 December 2024)
- A03949, Responds to NRC Re Violations Noted in IE Insp Rept 50-423/84-02.Corrective Actions:Within 1 Wk After Notification of Violation,Locked Covers Installed on Manholes & Controlled Key Sys for Access Implemented + (17:42:53, 13 December 2024)
- ML20091B699 + (17:42:55, 13 December 2024)