Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092P368 + (15:50:37, 13 December 2024)
- ML20092P370 + (15:50:37, 13 December 2024)
- 05000289/LER-1984-002-02, :on 840603,partial Engineered Safeguards Actuation Sys Actuation Occurred.Caused by Engineered Safeguards Actuation Sys Relay Failures in Conjunction W/ Maint Testing.Maint Procedure Will Be Updated + (15:50:39, 13 December 2024)
- ML20092P365 + (15:50:40, 13 December 2024)
- 05000289/LER-1984-001, :on 840427,relay Room Floor Fire Barrier Penetration Seal 735 Identified in Deficient Condition.No Seal Material Installed in Condulet.Seal Inspected & Repaired + (15:50:42, 13 December 2024)
- ML20092P362 + (15:50:43, 13 December 2024)
- 05000321/LER-1984-006, :on 840311,while Operating Personnel Were Reducing Reactor Power,Control Rod 50-31 Found to Be Three Position Notches Away from Control Rod 02-23.Reactor Manually Scrammed + (15:50:45, 13 December 2024)
- ML20092P358 + (15:50:49, 13 December 2024)
- ML20092P357 + (15:50:49, 13 December 2024)
- SNRC-1064, Forwards Shift Advisor Training Program & Exams in Response to 840531 Request.Info Contained in Refs 2 & 3 Will Be Updated in Late Jul 1984 + (15:50:50, 13 December 2024)
- 05000244/LER-1984-007, :on 840530,electrical Generator Trip Occurred, Causing Trip of Turbine W/Subsequent Reactor Trip.Caused by Neoprene Sponge Rubber Gasket Being Sucked in Airflow Path & Lodged Into Rectifier Area of Exciter + (15:50:52, 13 December 2024)
- 05000317/LER-1984-005, :on 840502,through-wall Hole Occurred During Removal of Graphite Layer on Component Cooling HX 22.Second Hole Created on 840503.All Units 1 & 2 Saltwater Pumps Inoperable on 840514.Cause Unknown + (15:50:54, 13 December 2024)
- ML20092P351 + (15:50:55, 13 December 2024)
- 05000416/LER-1984-026, :on 840601,discovered That Since 840524,fuel Oil Day Tank for One Gas Turbine Would Hold Only 270 Gallons.Cause Not Listed.Addl Day Tank Installed to Yield Total Capacity Greater than 700 Gallons + (15:50:57, 13 December 2024)
- ML20092P344 + (15:50:58, 13 December 2024)
- ML20092P345 + (15:50:58, 13 December 2024)
- 05000388/LER-1984-006-01, :on 840521,LPCI Valve HV-2F015B Closed & de-energized Following Dual Indication on Testable Check Valve HV-2F05B.Reactor Shut Down on 840528.Caused by Loose Plate Connector on Valve HV-2F122B + (15:51:01, 13 December 2024)
- ML20092P340 + (15:51:02, 13 December 2024)
- ML20092P339 + (15:51:02, 13 December 2024)
- 05000219/LER-1984-013, :on 840606,post-indicating Valve V-9-12 Damaged by Maint Vehicle,Resulting in Loss of Fire Suppression Water Sys.Caused by Soft Soil & Lack of Protection Around Valve. Damaged Valve Repaired & Water Sys Restored + (15:51:04, 13 December 2024)
- ML20092P336 + (15:51:05, 13 December 2024)
- ML20092P333 + (15:51:06, 13 December 2024)
- ML20092P334 + (15:51:06, 13 December 2024)
- NRC-84-0015, Amend to Application for OL & Application to Amend License NPF-25,deleting License Condition 20 Re post-accident Sampling Capability,Per NUREG-0737,Item II.B.3,on Basis of Prohibitive Limitations of Process Noise Methodology + (15:51:07, 13 December 2024)
- ML20092P330 + (15:51:07, 13 December 2024)
- ML20092P328 + (15:51:08, 13 December 2024)
- ML20092P322 + (15:51:09, 13 December 2024)
- ML20092P323 + (15:51:09, 13 December 2024)
- ML20092P320 + (15:51:10, 13 December 2024)
- AECM-84-0340, Forwards Proposed Changes to Offsite & Unit Organization Charts Contained in Tech Specs & Resumes of Individuals Holding Positions Shown in Organization Charts,Per NRC Telcon Request + (15:51:11, 13 December 2024)
- ML20092P318 + (15:51:11, 13 December 2024)
- ML20092P316 + (15:51:12, 13 December 2024)
- 05000361/LER-1984-031, :on 840525,during Performance of Routine Surveillance on Toxic Gas Isolation Sys,Emergency Chiller E-336 Inadvertently Started.Caused by Technician Error. Program Timer & Microswitch Replaced + (15:51:14, 13 December 2024)
- ML20092P311 + (15:51:15, 13 December 2024)
- ML20092P308 + (15:51:16, 13 December 2024)
- 05000219/LER-1984-011, :on 840527,both Trains of Standby Gas Treatment Sys (SGTS) Inoperable for 9 Minutes While Performing Preventive Maint on Circuit Breaker.Caused by Design Deficiency in Control Sys Sgts.Sgts Modified + (15:51:18, 13 December 2024)
- ML20092P301 + (15:51:19, 13 December 2024)
- 05000247/LER-1984-005, :on 840602,during Refueling Outage,Msivs MS-1-21 & MS-1-24 Failed to Close within 5 S,Per Tech Specs. Caused by Packing Friction Resulting from Shaft Lubricant Loss.Valves Will Be Overhauled + (15:51:21, 13 December 2024)
- ML20092P291 + (15:51:22, 13 December 2024)
- ML20092P286 + (15:51:23, 13 December 2024)
- ML20092P289 + (15:51:23, 13 December 2024)
- ML20092P285 + (15:51:24, 13 December 2024)
- ML20092P284 + (15:51:25, 13 December 2024)
- ML20092P283 + (15:51:26, 13 December 2024)
- ML20092P280 + (15:51:27, 13 December 2024)
- ML20092P279 + (15:51:28, 13 December 2024)
- ML20092P278 + (15:51:29, 13 December 2024)
- ML20092P273 + (15:51:29, 13 December 2024)
- AECM-84-0323, Forwards Suppl to Monthly Operating Rept for May 1984 & Revs 2 & 3 to Offsite Dose Calculation Manual, Describing Change to Radwaste Treatment Sys + (15:51:30, 13 December 2024)
- ML20092P267 + (15:51:31, 13 December 2024)
- ML20092P264 + (15:51:31, 13 December 2024)
- 05000280/LER-1984-013, :on 840601,w/RCS Solid,At 145 F & 325 Psig,Porv Cycled in Response to Overpressure Condition While Placing Charging Sys in Svc.Caused by Personnel Error + (15:51:34, 13 December 2024)