Forwards Updated Status of Tech Spec Change Requests (Tscr). Requests Priority for NRC Review & Approval Be Given to Designated Tscrs
ML20092P351
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/29/1984
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
5211-84-2123, NUDOCS 8407060195
Download: ML20092P351 (3)


Text

s 1

e

= ee*

GPU Nuclear Corporation Nuclear

,omeg:,v8o Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

June 29, 1994 5211-84-2123 Office of Nuclear Reactor Regulations Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stolz:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Status of TMI-1 Technical Specification Change Requests (TSCRs)

Attached is a table which provides an updated status of TSCRs for THI-1 which havenotyetbeenapproved(ytheNRC. This table should facilitate a mutual understanding of the status of each pending TSCR.

It is requested that the priority for NRC review and approval be given to TSCRs designated as "as soon as possible" (TSCRs 116, 126, 135 and 139).

We request, as in the previous TSCR status report, to be notified by telephone of any amendment that is issued with an implementation different than requested.

Sincerely,

. D. bkill, Director, THI-1 HDH/SM0/mle Attachment cc:

R. Conte J. Van Vliet

!!. Silver O. Thcrnpocn l

0407060195 840629 DRADOCK05000g

$ eel GPU Nuclear Corporation is a subsidlary of the General Public Utilities Corporation

~..

SHORT TITLE /-

DATE SUBMITTED PUBLIC NOTICE IMPLEMENTATION STATUS s.*'

TSCR SUBJECT TO NRC ISSUE DATE REQUESTED j

38 Fuel Handling 9-21-76 30 days of GPUN Phase I response to Heavy Loads.

Building Fuel Cask receipt NRC approval requested Drop 97 Fire Protection Rev. 0 1-26-81 60 days of NRC Approval requested Rev. I 12-1-83 receipt

.104 RV Material Surveil-Rev. 0 6-5-81 Immediately As a result.of the Host Reactor's lance (Capsule with-Rev. 1 4-5-83 schedule (CR-3) this TSCR must be drawal sequence)

Rev. 2 TBD further revised. NRC approval is requested after Rev. 2 is submitted.

105 Snubber Surveillance Rev. 0 6-8-81 60 days of NRC approval requested Program Rev. 1 2-17-84 receipt 110 Auxiliary Building Rev. 0 4-6-83 60 days of GPUN intends to revise this TSCR to HVAC Flow Rate

.Rev. 1 TBD receipt reflect new design basis flowrates as a result of damper replacements and other system changes..NRC approval'isL requested after Rev.1 is submitted 114 High Range Radiation-Rev. 01-5-83 2-24-84 45 days of NRC approval is requested.

Monitors Rev. 1 6-14-84 receipt 116 RB Purge Surveil-Rev. 0 8-13-83 60 days of NRC approval requested as soon as lance & Limiting Rev. I 11-24-83 receipt possible Conditions

~

SHORT TITLE /

DATE SUBMITTED PUBLIC NOTICE IMPLEMENTATION STATUS TSCR-

. SUBJECT TO NRC ISSUE DATE REQUESTED J

126-IOSRG Qualifications 7-11-83 2-25-84 Immediately NRC approval' requested as soon

& Minimum Staffing as possible

& Surveillance Applicability 130 Backup Incore

'2-13-84 4-25-84 30 days of NRC approval requested Thermocouple Display receipt Operability 1

135 H2 &02 Limits 6-1-84 Immediately NRC approval requested as soon in the Waste Gas as possible Holdup System i

139-Definition of Rev. 0 3-23-84 45 days of NRC approval requested as soon Operable Rev. 1 5-11-84 receipt as possible i