Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093E647 + (15:31:12, 13 December 2024)
- ML20093E650 + (15:31:12, 13 December 2024)
- ML20093E644 + (15:31:13, 13 December 2024)
- ML20093E640 + (15:31:14, 13 December 2024)
- ML20093E641 + (15:31:14, 13 December 2024)
- ML20093E637 + (15:31:15, 13 December 2024)
- ML20093E630 + (15:31:16, 13 December 2024)
- ML20093E633 + (15:31:16, 13 December 2024)
- ML20093E625 + (15:31:17, 13 December 2024)
- ML20093E624 + (15:31:18, 13 December 2024)
- ML20093E621 + (15:31:19, 13 December 2024)
- ML20093E623 + (15:31:19, 13 December 2024)
- ML20093E620 + (15:31:22, 13 December 2024)
- 3F1095-02, Monthly Operating Rept for Sept 1995 for Crystal River Unit 3 + (15:31:23, 13 December 2024)
- U-120203, Final Deficiency Rept 55-84-05 Re Incorrect Matl Substitutions of Large Bore Pipe.Initially Reported on 840127.Applicant Determined Substitution Issue Not Reportable Under 10CFR50.55(e) + (15:31:23, 13 December 2024)
- ML20093E599 + (15:31:26, 13 December 2024)
- 3F0584-07, Responds to NRC Re Violations & Deviation Noted in IE Insp Rept 50-302/84-09.Corrective Actions:Surveillance Procedure SP-317 Reperformed Using Other Calibr Instrumentation & RCS Leakage Determined within Spec + (15:31:27, 13 December 2024)
- ML20093E577 + (15:31:28, 13 December 2024)
- ML20093E584 + (15:31:28, 13 December 2024)
- ML20093E572 + (15:31:29, 13 December 2024)
- ML20093E567 + (15:31:30, 13 December 2024)
- ML20093E571 + (15:31:30, 13 December 2024)
- ML20093E565 + (15:31:31, 13 December 2024)
- ML20093E562 + (15:31:32, 13 December 2024)
- 05000361/LER-1984-051, :840829,safety Injection Tanks 10 & 7 Inoperable Due to Leakage Through Fill & Drain Valve.Caused by Installation of Valve Fuses on Tank 10 & Nitrogen Cover Pressure Exceeding Limits of Operation + (15:31:33, 13 December 2024)
- 05000423/LER-1995-016-02, :on 950911,A Train Quench Spray Pump Discharge Valve Exceeded TS Surveillence Periodicity Limit.Caused by Programmatic Error.Surveillance Tracking Procedure Revised + (15:31:36, 13 December 2024)
- ML20093E553 + (15:31:37, 13 December 2024)
- RC-95-0261, Monthly Operating Rept for Sept 1995 for VC Summer Nuclear Station + (15:31:37, 13 December 2024)
- ML20093E550 + (15:31:38, 13 December 2024)
- ML20093E547 + (15:31:42, 13 December 2024)
- ML20093E544 + (15:31:43, 13 December 2024)
- ML20093E543 + (15:31:44, 13 December 2024)
- ML20093E536 + (15:31:45, 13 December 2024)
- ML20093E533 + (15:31:46, 13 December 2024)
- ML20093E532 + (15:31:46, 13 December 2024)
- ML20093E531 + (15:31:47, 13 December 2024)
- ML20093E530 + (15:31:48, 13 December 2024)
- ML20093E525 + (15:31:48, 13 December 2024)
- ML20093E524 + (15:31:49, 13 December 2024)
- HL-5044, Forwards Monthly Operating Repts for Sept 1995 & Revised Page E1-4 for Aug 1995 Repts + (15:31:50, 13 December 2024)
- ML20093E522 + (15:31:50, 13 December 2024)
- ML20093E514 + (15:31:51, 13 December 2024)
- ML20093E506 + (15:31:55, 13 December 2024)
- ML20093E509 + (15:31:55, 13 December 2024)
- GL-705928-25, GLTS: Past Due General License Device Annual Registration: Gbc Metals, LLC GL-705928-25 + (15:31:56, 13 December 2024)
- ML20093E502 + (15:32:00, 13 December 2024)
- ML20093E495 + (15:32:01, 13 December 2024)
- ML20093E497 + (15:32:01, 13 December 2024)
- ML20093E489 + (15:32:02, 13 December 2024)
- ML20093E483 + (15:32:03, 13 December 2024)
- ML20093E480 + (15:32:03, 13 December 2024)
- ML20093E479 + (15:32:04, 13 December 2024)