Text
.
OPERATING DATA REPORT DOCKET NO.
50-263______
DATE-9-5-84____
COMPLETED BY A. L. Myrabo
. TELEPHONE 612/295-5151 OPERATING STATUS
[ Notes i
1.-Unit Name : ________________________Monticalto l
l
- 2. R porting period: ___________________ AUGUST I
l
- 3. Licensed Thermal Power-(MWt):
____________1670 l
'l
- 4. Nsmoplate Rating (Gross MWe): _ _ _ _ _ _ __ _ _ _ _ _5 6 9 - l l
- 5. D sign Electrical Rating (Net MWe): _____545.4 l'
l
- 6. Maximum Dependable Capacity (Gross MWe): __553 l
l
- 7. Maximum Dependable Capacity (Net MWe):
____525 l__________________________l IB. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: __N/A_____________________________________________
- 9. Power Level To Which Restricted, If Any (Net MWe): ___N/A___________________
- 10. Raasons For Restrictions, If Any:
N/A_____________________________________
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
_____744
_____5855
____115464
- 12. Number Of Hours Reactor Was Critical 0.0
___ 810.5
__ 89915.4
- 13. Roactor Reserve Shutdown Hours
_____0.0
______0.0
_____940.7
- 14. Hsurs Generator On-Lins 0.0
___ 808.8
__ 88003.0
- 15. Unit Reserve Shutdown Hours
_____0.0
______0.0
_______0.0
.16. Gross Thermal Energy Generated (MWH) 0 897898
_141233814
- 17. Gross Electrical Energy Generated (MWH)
.0
__ 296117
__45185053
- 13. Nat Electrical Energy Generated (MWH)
__ -1274
__ 271865
__43183629
- 19. Unit Service Factor 0.0%
___ 13.8%
____ 76.2%
- 20. Unit Availability Factor 0.0%
___ 13.8%
____ 76.2%-
- 21. Unit Capacity Factor (Using MDC Net)
__ -0.3%
0.8%
____ 71.2%
- 22. Unit Capacity Factor (Using DER Net)
__ -0.3%
8.7%
____ 70.0%
- 23. Unit Forced Outage Rate 0.0%
0.0%
5.3%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
__ February 3, 1984 - Refueling Outage - 286 days ________________________
- 25. If Shut Down At End Of Report Per iod, Est imated Date Of Startup :__11-13-84__
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY
. INITIAL ELECTRICITY COMMERCIAL OPERATION h1 8410120160 840831 f/
PDR ADOCK 05000263 R
PDR n,
,,,.,,.,-,.,--,,,,,-,,,,,,,,,,n,-
,n
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263______
UNIT MonticelLo__
DATE 9-5-84____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ AUGUST 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i
_2____________
17
~
o_
18
_2____________
3
-2____________
19
-2____________
4-o0
_o____________
5
-1____________
21
-2____________
no 6
,3 7
8 o4
_o____________
~
9
_o____________
o5
_1____________
~
i0
-o____________
26
_o____________
~
11
_2____________
27 12
-9____________
28
-9____________
~
13
-2____________
29
-2____________
i i4
-2____________
30
_o_____________
15
_2____________
31
_o____________
~
16
-2____________
INSTRUCTIONS On this format, List the average daity-unit power Level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
o-NARRATIVE 7UMMARY OF OPERATING EXPERIENCE DOCKET NO.
50-263______
DATE 9-5-84____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ AUGUST 8-1-84 to Continuation of-1984 refueling outage.
8-31-84 l
l 1
)
Note: Power operation defined as essentially 100% of rated power except for weekend Load drops for specified surveitLance testing.
. j,
- m-
,y 1
DOCKET NO.
sn_n a UNIT SHUTDOWNS ANs) POWER REDUCTIONS UNIT NAME ' MDnticello-DATE 6-84 CGAPLETED BY i Nkr=ha REPORT MONTH Auaust' TELEPHONE 612/295-5151 I
E E
E 3-3 $3 Licensee j-r, Cause & Corrective 5E Ewns s7 63 Auion tu.
~ 3, 5 N...
D. rte E
iE 4
Repors =
$0
,E '
Pr' event Recurreti,c,e 2
=
v e
d i
2 2-3-84 S
744.0 C
4 N/A ZZZZ ZZZZZZ Continuation of 1984 Refueling outage t-1 l-3 4..
8 1
2 Method:
l Exhibit G Instructions F: Forced Reason.
1 -Manual for Preparation of Data S: Scheduled A Equipment Failure (Explain) 2-Manual Scram.
Entry Sheets for Licensee B-Maintenance of Test 3 Automatic Scram.
Event Report (LER) File (NUREG-C Refueling D Regulatory Restriction 4-Other (Explain) 01611 E-Operator Training & License Examination
.i F Administrative Exhibit ! Same Source G Operational Error (Explaint
]
(9/77)
Il-Other (Explain)
.o Northem States Power Company 414 Nicollet Mall Minneapohs. Minnesota 55401 Telephone (612) 330-5500 l
I
)
l September 11, 1984 i
l Director, Office of Resource Management U S Nuclear Regulatory Commission Washington, DC 20555 1
MONTICELLO NUCLEAR GENERATING PLANT l
Docket No. 50-263 License No. DPR-22 Monthly Operating Report i
August, 1984 l
Attached are twelve copies of the Monthly Operating Report for August, 1984 for the Monticello Nuclear Generating Plant.
David Musolf Manager of Nuclear Support Services DMM/ dab cc:
Regicnal Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment 0
OR g[
DESlgt;ATED j
)
n Certifier 1 37 d
3 t
i