Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093H393 + (15:23:06, 13 December 2024)
- ML20093H363 + (15:23:08, 13 December 2024)
- ML20093H377 + (15:23:08, 13 December 2024)
- ML20093H357 + (15:23:09, 13 December 2024)
- 05000348/LER-1995-007-01, :on 950927,discovered That Control Room Pressurization Units Moisture Controllers Incapable of Performing Intended Function Due to Procedural Inadequacy. Established Repetitive PM Tasks + (15:23:12, 13 December 2024)
- ML20093H335 + (15:23:13, 13 December 2024)
- ML20093H332 + (15:23:14, 13 December 2024)
- 05000348/LER-1995-008, :on 950916,loop a Main Steam Line Isolation Valves (MSIV) Failed to Close Due to Personnel Error.Loop a MSIVs Vented & Closed,Test Procedure Modified & Operator Coached on Event + (15:23:15, 13 December 2024)
- ML20093H299 + (15:23:16, 13 December 2024)
- ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project + (15:23:17, 13 December 2024)
- ML20093H254 + (15:23:18, 13 December 2024)
- ML20093H255 + (15:23:18, 13 December 2024)
- ML20093H240 + (15:23:19, 13 December 2024)
- ML20093H222 + (15:23:20, 13 December 2024)
- ML20093H235 + (15:23:20, 13 December 2024)
- ML20093H201 + (15:23:21, 13 December 2024)
- ML20093H198 + (15:23:22, 13 December 2024)
- ML20093H193 + (15:23:23, 13 December 2024)
- ML20093H184 + (15:23:24, 13 December 2024)
- ML20093H179 + (15:23:25, 13 December 2024)
- 05000354/LER-1995-021, :on 950920,results of HPCI Sys Oil Reservoir Sample Indicated Moisture Content Above Specified Limit Established by Vendor.Caused by Steam Leakage Through Turbine Steam Admission Valve.Hpci Drained + (15:23:30, 13 December 2024)
- ML20093H174 + (15:23:31, 13 December 2024)
- ML20093H170 + (15:23:32, 13 December 2024)
- ML20093H163 + (15:23:33, 13 December 2024)
- ML20093H165 + (15:23:33, 13 December 2024)
- PY-CEI-NRR-1989, Monthly Operating Rept for Sept 1995 for Perry Nuclear Power Plant + (15:23:34, 13 December 2024)
- ML20093H152 + (15:23:35, 13 December 2024)
- ML20093H148 + (15:23:35, 13 December 2024)
- ML20093H146 + (15:23:36, 13 December 2024)
- JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant + (15:23:37, 13 December 2024)
- 3F1084-07, Monthly Operating Rept for Sept 1984 + (15:23:38, 13 December 2024)
- ML20093H138 + (15:23:38, 13 December 2024)
- ML20093H128 + (15:23:39, 13 December 2024)
- ML20093H119 + (15:23:39, 13 December 2024)
- 0CAN109510, Forwards NRC Providing on Page 2 Requested Signature Signifying Util Acceptance of Conditions Stated in NRC Re SCDAP/RELAP5 Cpmputer Code + (15:23:40, 13 December 2024)
- ML20093H106 + (15:23:41, 13 December 2024)
- 1CAN108401, Application for Amend to License DPR-51,allowing Gagging of 14 Steam Safety Valves & Resetting of Two Safety Valve Setpoints Below Required Test Pressure to Perform Hydrostatic Test.Fee Paid + (15:23:42, 13 December 2024)
- ML20093H092 + (15:23:42, 13 December 2024)
- ML20093H060 + (15:23:43, 13 December 2024)
- ML20093H053 + (15:23:44, 13 December 2024)
- 05000255/LER-1984-018, :on 840905,surveillance Test for Snubber on Steam Supply Line to Feedwater Pump Not Performed.Caused by Personnel Error.Computerized Tracking Tool Being Developed + (15:23:49, 13 December 2024)
- 05000370/LER-1984-021-01, :on 840831,unit Tripped on Two Out of Four Channel Power Range High Flux Rate Signals During Test Procedure.Caused by Personnel Error.Personnel Instructed + (15:23:52, 13 December 2024)
- ML20093H044 + (15:23:53, 13 December 2024)
- ML20093H028 + (15:23:54, 13 December 2024)
- ML20093H026 + (15:23:55, 13 December 2024)
- LIC-95-0201, Informs That Util Implemented Necessary Actions Associated W/Listed Open TAC Issues & That Subject to Agreement by NRR Project Manager,Items Considered Ready to Close + (15:23:56, 13 December 2024)
- 05000285/LER-1984-008, :on 840516,RCS Leakage Approached 110 Gpm W/Indication of Tube Rupture in Steam Generator B RC-2B. Caused by Igscc.Corrective Actions Contained in + (15:23:57, 13 December 2024)
- 05000285/LER-1984-019, :on 840902,ventilation Isolation Actuation Sys Started.Caused by Operator Error During Changing of Ventilation Discharge Duct Monitor.Monitors Returned to Normal & Sys Reset.Procedures Under Review + (15:24:00, 13 December 2024)
- BECO-LTR-95-106, Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 951213.W/o Encl + (15:24:01, 13 December 2024)
- ML20093G987 + (15:24:02, 13 December 2024)
- ML20093G980 + (15:24:05, 13 December 2024)