ML20093H174
| ML20093H174 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/31/1984 |
| From: | Bryant K, Miltenberger S, Patterson J UNION ELECTRIC CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| ULNRC-917, NUDOCS 8410160190 | |
| Download: ML20093H174 (6) | |
Text
..
~
MONTHLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE September 4. 1984 COMPLsrsu BY.T. T J Pat-t orson TELEPHONE (116) 676-R707 PART A OPERATIONS
SUMMARY
August 1984 The plant entered August operating in Mode 5.
On August 10, 1984 the plant entered Mode 4, and on August 29, 1984 the plant entered Mode 3.
d PART B PORV AND SAFETY VALVE
SUMMARY
None l
I 8410160190 840831 PDR ADOCK 05000483 R
PDR CA-//804 05/09/84 QDP-ZZ-04204 Page 1 of 4 i
_-w w
3m w
y-w
---v-w<-3gyv ew-w
,--v-
,-y
,m
-r-
<-y--r--3 y--wyng yyyye---
wv w-yw er--w--
w--
.~
j I
l
- Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT Callaway DATE September 1,-1984 COMPLETED BY K. R. Bryant TELEPHONE gl4) 676-8292 MONTH August a
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 1 0
37 o
0 o
2 3,
0 0
3 3,
0 0
4 3
f 5
0 0
21
's 0
o u
0 0
7 23 3
0 24 0
0 0
9 3
0 0
to 26 0
11 27 12 0
23 0
0 0
13 gg 0
0 14 3,
0 0
15 33 1s 0
')
0 [0 N4 Page 2 of 4 QDP-ZZ-04204
~~
'W
't'
~
w
_,,,4
3 3_
., c j
l a
Part D OPERATING DATA REPORT 50-483 DOCKET NO.
UNIT Callaway-DATE September 1, 1984 K. R. Bryant COMPLETED SY (314) 676-8292 TELEPHONE OPERATING STATUS
- 1. REPORTING PERIOD:
August GROS MOURS IN REPORTING PERIOD:
7AA 0
3411 Max. DEPEND. CAPACITY (MWe Nott:
- 2. CURRENTLY AUTHORIZED FOWER LEVEL (MWil:
DESIGN FL.ECTRICAL MATING (WWs. Net):
1I35 G
0
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) IMWo Not):
- 4. REASONS FOR RESTRICTION (IP ANY): Required to meet e
n 7.
a b kk
$weh THIS MONTM YR TO DATE CUMULATIVE ben he a
0 0
0
- 5. NUMOER OF MOURS REACTOR WAS CRITICAL 0
0 0
- 6. REACTOR RESERVE SMUTDOWN MOURS y
0 0
0 7
- 7. MOURS GENERATOR ON LINE.
0 0
0 1
- s. UNir RESERVE SMUTDOWN MOURS 0
0 0
- 9. GROSS THERMAL ENERGY GENERATED IMWM) 0 0
0
- 10. GROSS ELECTRICAL ENERGY GENERATED IMWM)...
0 0
0
- 11. NET ELECTRICAL ENERGY GENE 1ATED (MWM)
NA NA NA
- 12. REACTOR SERVICE FACTOR
- 13. REACTOR AVAILAtlLITY FACTOR NA NA NA NA NA NA
- 14. UNIT SERVICE FACTOR NA NA
_ NA
- 15. UNIT AVAILASILITY FACTOR NA NA NA
- 16. UNIT CAPACITY FACTOR (Uems MDC1 NA NA NA i
- 17. UNIT CAPACITY FACTOR (Dems Dougn MWel.
- 18. UNIT FORCED OUTAGE RATE NA NA NA
- 19. SMUTDOWNS SCHEDULED OVER NEXY 6 MONTHS (TYPE. DATE. AND DURATION OF EACHl: None r
- 20. IF SMUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
9/19/R4
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED i
INITI AL CRITICALITY 9 /15 /R4 INITIAL ELECTRICITY 9/?R/R4 COMMERCIAL OPERATION
- Forecast completion of ascension testing 11/26/84.
O l
Page 3 of 4 QDP-ZZ-04204
-l L- =:::~:L :-
e
}
.l>-
4 Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway i.
I) ATE September 1, 1984 4
J. T. Patterson COMPLETED By i
~ TELErilONE (314) 676-8207 REPORT MONTil AUGUF t
METHOD OF 4
TYPE SHUTTING DOWN i
F: FORCED DURATION THE REACTOR OR i
NO.
DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS i
i i
1 I
j j.
I, -
j
SUMMARY
No unit shutdowns or power reductions as the plant is in its initial startup in Mode 3, l
ascending for the first time.
l l
i CA-f804 05/09/84 Page 4,of 4 QDP-ZZ-04204
q a.
.T
@;p v. 3 m n
. m Ql}'4 li ?,1
- h t' > s.
_ UNION'..EtscTaic COMPANY
_ CALLAWAY PLANT '
t MAluMO ADDREse:
P.O. sox eso FULTON, MO. statt
~
September'7, 1984 r
Director,-Resource Management-
'- U.-S. Nuclear Regulatory Commission.
Washington, DC 20555 ULNRC-917 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1
-FACILITY. OPERATING LICENSE NPF-25 MONTHLY OPERATING REPORT
-AUGUST 1984
Dear Sir:
.The enclesed Monthly Operating Report for August 1984 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
S. E. Miltenberger JTP/WHS/
drs Enclosure cc: Distribution attached
?
9)
---s,,m
--n-w.-a
--*------s----a---
cc distribution for ULNRC-917 with enclosures James G. Keppler USNRC Region III Office 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 American Nuclear Insurers Library c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 NRC Resident Inspector Missouri Public Service Commission D. F. Schnell J. E. Davis (Z40MOR)
R. L. Powers l
D. W. Capone A. C. Passwater/D. E. Shafer/ D. J. Walker G. A. Hughes W. JR. Robinson (QA Record)
P..T. Appleby SEM Chrono 3456-0021.6 Z40ULNRC G56.37 N. Date O
\\\\\\
--