<.= . m-2 OPERATING DATA REPORT

, DOCKET NO. 50-302 DATE 10/1/n4 COMPLETED BY D. Graham -

TELEPHONE (9041795-3802 OPERATING STATUS Crystal River Unit 3 Notes

't. Unit Name:

, 2. Reporting Period: 9/1/84 - 9/30/84

3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependabie Capacity (Grow MWe): 860

} 7. Maximum Dependable Capacity (Net MWe): 821

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

1 NA t 9. Power Level To which Restricted. If Any (Net MWe): NA

10. Reasons For Restrictions,if Any: NA

' This Month Yr.-to-Date Cumulative i1. Hours in Reporting Period 720 6575 66215

12. Number Of Hours Reactor Was Critical 790 n9an 43n9a_9
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On-Line 720 6218.3 42837.3
15. Unit Reserve Shutdown Hours o o n
16. Gross Thermal Energy Generated (MWH) .

1692039 1490173G 98866071 -

17. Gross Electrical Energy Generated (MWH) 582111 5135795 33062531
18. Net Electrical Energy Generated (MWH) nsanno anonnan 91a1979n
19. Unit Service Factor 100 % 94.6% G4.7%
20. Unit Availability Factor 100 % 94.6 % 64.7 %
21. Unit Capacity Factor (Using MDC Net) 01 R 4 on vor, so naA I
22. Unit Capacity Factor (Using DER Net) 93.4 % 90.3 % 57.5 %
23. Unit Forced Outage Rate 0% 1.7% 21.0 %
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each): ,

Refueline outnee scheduled to begin March 9.1985. and last 20 weeks.

I

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA j

) 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed

. INITIAL CRITICALITY 1/14/77

! INITIAL ELECTRICITY 1/30/77 COMMERa.lAL OPERATION 3/13/77 137A 8410160177 840930 X PDR ADOCK 05000302 PDR (9/77)

R ,

. _ _ . _ _ .._.. _ . _ . _ _ ___ _ ... - _ _ _ _ .... _ ...... _ _. - _ , ~ . _ .. _ ._ - . _ - - -

AVERAGE DAILY UNIT POWER LEVEL' '

t.

DOCKET NO. 50-302 UNIT FLCR P-3 DATE 10/1/84 COMPLETED BY D. Graham TELEPHONE (anal 795-3 802 s.

MONTH OIO4 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 785 g7 688 2 789 g 590 3 810 39 590 4 765 20 740 5 ~795 21 799 6 784 784 12 7 814 23 795 8

809 789 24 9 766 794 25 10 798 26 787 11 788 27 812 _

12 79I 28 770 13 802 29 752 14 781 30 783 15 7RD 31 16 776 INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. C.unpute to the nearest whole megawatt.

19I77)

DOCKET NO. 50-302 '

UNIT SHUTDOWNS AND POWER REDUC 110NS UNIT NAME . l'LGRP-3 DATE 10/1/84 COMPLETED BY S. A. Stewart REPORT MONTH 9/84 TELEPHONE (904) 795-3802 w.

- E E ,

-, 3g "h j5'5 1.icerisee [ r, ye, Cause & Corrective ,,

No. Date 3@ 255 Evert ~?

g g3 Action to i

H y 5 4

jg Report # mO g' Present Recurrence c

84-29 09/17/84 F 0.0 A 5 N/A IIC IITEXCll Reduced power to locate and repair a condenser salt water leak. Also cleaned condenser waterboxes.

I 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Ssheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refuehng 3-Automatic Scram. Event Repori(LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

F-Operator Training & Ucense Examination 5

F-Administratise G-Operational Error (Explam) Eshibit I - Same Source P3/77) Il-Other (E xplain) e e.

L___.______ . _ _ _ _ _ _ _ _ _ _ _ _ _ _

. . g.

MONTHLY OPERATIONAL SUletARY STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 10/1/g4 COMPLETED BY S.A. Stewart TELEPHONE (904) 795-3802 MONTH September 1984

SUMMARY

STATEMENT: Crystal River 3 operated with one power reduction for a condenser tube leak and no outages during September. Throughout the month the plant was limited to approximately 95% power due to high water levels in the Steam Generator caused by fouling.

e e

4-

o e

  • ?.

3 e: ,

COnPOaateom October 4,1984 3F1084-07 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 September 1984 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, o

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments l cc: Mr. 3. P. O'Reilly I

. Regional Administrator, Region 11 l Office of Inspection & Enforcement i U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 l

! [h Ii GEN ERAL OFFICE 3201 Thirty fourth street soutn e P.O. Box 14042, St. Patersburg, Florida 33733 e 813-866-5151