3F1084-07, Monthly Operating Rept for Sept 1984

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1984
ML20093H132
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/30/1984
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F1084-07, 3F1084-7, NUDOCS 8410160177
Download: ML20093H132 (5)


Text

.

<. =

m-2 OPERATING DATA REPORT DOCKET NO.

50-302 DATE 10/1/n4 COMPLETED BY D. Graham -

TELEPHONE (9041795-3802 OPERATING STATUS

't. Unit Name:

Crystal River Unit 3 Notes

2. Reporting Period:

9/1/84 - 9/30/84

3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe):

825 860

6. Maximum Dependabie Capacity (Grow MWe):

}

7. Maximum Dependable Capacity (Net MWe):

821

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

1 NA t

9. Power Level To which Restricted. If Any (Net MWe):

NA

10. Reasons For Restrictions,if Any:

NA This Month Yr.-to-Date Cumulative i1. Hours in Reporting Period 720 6575 66215

12. Number Of Hours Reactor Was Critical 790 n9an 43n9a_9
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 720 6218.3 42837.3
15. Unit Reserve Shutdown Hours o

o n

16. Gross Thermal Energy Generated (MWH) 1692039 1490173G 98866071
17. Gross Electrical Energy Generated (MWH) 582111 5135795 33062531
18. Net Electrical Energy Generated (MWH) nsanno anonnan 91a1979n
19. Unit Service Factor 100 %

94.6%

G4.7%

20. Unit Availability Factor 100 %

94.6 %

64.7 %

21. Unit Capacity Factor (Using MDC Net) 01 R 4 on vor, so naA I
22. Unit Capacity Factor (Using DER Net) 93.4 %

90.3 %

57.5 %

23. Unit Forced Outage Rate 0%

1.7%

21.0 %

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

Refueline outnee scheduled to begin March 9.1985. and last 20 weeks.

I

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

NA j

)

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERa.lAL OPERATION 3/13/77 137A 8410160177 840930 X

PDR ADOCK 05000302 (9/77)

R PDR

. _ _. _ _.._.. _. _. _ _ ___ _... - _ _ _ _.... _...... _ _. - _, ~. _.. _._ -. _ - - -

AVERAGE DAILY UNIT POWER LEVEL' t.

DOCKET NO.

50-302 UNIT FLCR P-3 DATE 10/1/84 COMPLETED BY D. Graham TELEPHONE (anal 795-3 802 s.

OIO4 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 785 g7 688 789 590 2

g 3

810 39 590 4

765 20 740 5

~795 799 21 784 6

12 784 7

814 795 23 809 8

24 789 766 9

25 794 10 798 787 26 11 788 27 812 79I 770 12 28 13 802 752 29 14 781 30 783 15 7RD 31 16 776 INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. C.unpute to the nearest whole megawatt.

19I77)

DOCKET NO.

50-302 UNIT SHUTDOWNS AND POWER REDUC 110NS UNIT NAME. l'LGRP-3 DATE 10/1/84 COMPLETED BY S. A. Stewart REPORT MONTH 9/84 TELEPHONE (904) 795-3802 w.

E E

3g "h

j5'5 1.icerisee

[ r, ye, Cause & Corrective

~?

g3 Action to No.

Date i

3@

4 255 Evert g

g' Present Recurrence y

5 jg Report #

mO H

c 84-29 09/17/84 F

0.0 A

5 N/A IIC IITEXCll Reduced power to locate and repair a condenser salt water leak. Also cleaned condenser waterboxes.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions S: Ssheduled A-Equipment Failure (Explain)

I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refuehng 3-Automatic Scram.

Event Repori(LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

F-Operator Training & Ucense Examination F-Administratise 5

G-Operational Error (Explam)

Eshibit I - Same Source P3/77)

Il-Other (E xplain) e e.

L

g.

MONTHLY OPERATIONAL SUletARY STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 10/1/g4 COMPLETED BY S.A. Stewart TELEPHONE (904) 795-3802 MONTH September 1984

SUMMARY

STATEMENT:

Crystal River 3 operated with one power reduction for a condenser tube leak and no outages during September. Throughout the month the plant was limited to approximately 95% power due to high water levels in the Steam Generator caused by fouling.

e e

4-

o e

?.

3 e:

COnPOaateom October 4,1984 3F1084-07 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 September 1984 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, o

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments l

cc:

Mr. 3. P. O'Reilly I

Regional Administrator, Region 11 l

Office of Inspection & Enforcement i

U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 l

[h Ii GEN ERAL OFFICE 3201 Thirty fourth street soutn e P.O. Box 14042, St. Patersburg, Florida 33733 e 813-866-5151