Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ULNRC-03277, Forwards Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (15:14:52, 13 December 2024)
- ML20093K970 + (15:14:53, 13 December 2024)
- ML20093K969 + (15:14:53, 13 December 2024)
- ML20093K968 + (15:14:54, 13 December 2024)
- ML20093K967 + (15:14:56, 13 December 2024)
- ML20093K962 + (15:14:57, 13 December 2024)
- ML20093K965 + (15:14:57, 13 December 2024)
- ML20093K961 + (15:14:58, 13 December 2024)
- NRC-95-0108, Submits Fermi 2 Personnel Training & Qualification Plan, Rev 13 Per 10CFR50.54(p)(2).Plan Withheld + (15:14:59, 13 December 2024)
- ML20093K953 + (15:14:59, 13 December 2024)
- AECM-84-0399, Forwards Justification for Required Exemption from Certain Regulations Implied by Proposed OL Conditions,Per 10CFR50.12(a) Concerning Div I-III Diesel Generators. Conditions May Be Incorporated Into OL Amend + (15:15:00, 13 December 2024)
- ML20093K943 + (15:15:01, 13 December 2024)
- ML20093K942 + (15:15:01, 13 December 2024)
- W3P84-1928, Requests Exemption from Requirement for Emergency Lighting During Jumpering Procedures for Electrical Isolation of Automatic Diesel Generator Functions from Control Room. Advises of Completion of Safe Shutdown Procedure Open Items + (15:15:02, 13 December 2024)
- ML20093K936 + (15:15:03, 13 December 2024)
- ML20093K934 + (15:15:04, 13 December 2024)
- ML20093K930 + (15:15:05, 13 December 2024)
- ML20093K933 + (15:15:05, 13 December 2024)
- ML20093K926 + (15:15:06, 13 December 2024)
- ML20093K912 + (15:15:07, 13 December 2024)
- NG-95-3089, Provides 60-day Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves + (15:15:07, 13 December 2024)
- ML20093K910 + (15:15:08, 13 December 2024)
- LIC-95-0179, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR for Period Jan 1994 - Apr 1995 + (15:15:09, 13 December 2024)
- TXX-4337, Responds to Question Re Containment Sump Performance.Core Blockage Will Not Occur When Paint Debris Transported in RHR Flow During Cold Leg Recirculation + (15:15:10, 13 December 2024)
- ML20093K900 + (15:15:10, 13 December 2024)
- ML20093K897 + (15:15:11, 13 December 2024)
- L-84-169, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/84-15 & 50-251/84-15.Corrective Actions:Maint Procedure 0707.32, Safety-Related Snubber Surveillance, Revised,Specifying as-found Visual Insp Required + (15:15:12, 13 December 2024)
- ML20093K889 + (15:15:12, 13 December 2024)
- ML20093K883 + (15:15:13, 13 December 2024)
- AECM-84-0410, Discusses Util Conclusion Re Conformance of Tdi Diesel Generators to Reliability Requirements of GDC 17.Diesel Generators Inspected at Least Once W/Satisfactory Results + (15:15:14, 13 December 2024)
- ML20093K867 + (15:15:14, 13 December 2024)
- ML20093K862 + (15:15:15, 13 December 2024)
- ML20093K858 + (15:15:16, 13 December 2024)
- ML20093K853 + (15:15:16, 13 December 2024)
- ML20093K852 + (15:15:17, 13 December 2024)
- ML20093K849 + (15:15:19, 13 December 2024)
- ML20093K848 + (15:15:19, 13 December 2024)
- 05000328/LER-1984-009-02, :on 840630,during Maint on Main Feedwater Pump B,turbine-driven Auxiliary Feedwater Pump Did Not Start When Signaled Due to Flow Control Valve FCV-1-15 Failing to Close.Caused by Grease on Torque Switch + (15:15:21, 13 December 2024)
- ML20093K834 + (15:15:22, 13 December 2024)
- ML20093K830 + (15:15:23, 13 December 2024)
- TXX-4072, Forwards Table Providing Description of Amend 45 to FSAR + (15:15:24, 13 December 2024)
- ML20093K827 + (15:15:24, 13 December 2024)
- TXX-4057, Forwards Table Providing Description of 831010 Amend 44 to FSAR + (15:15:25, 13 December 2024)
- NLS8400019, Submits Followup Response to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class 1E Safety Sys. short- & long-term Corrective Actions Adequately Addressed. Satisfactory Relay Performance Will Be Provided + (15:15:26, 13 December 2024)
- ML20093K807 + (15:15:27, 13 December 2024)
- ML20093K810 + (15:15:27, 13 December 2024)
- ML20093K803 + (15:15:28, 13 December 2024)
- ML20093K794 + (15:15:30, 13 December 2024)
- ML20093K792 + (15:15:31, 13 December 2024)
- ML20093K777 + (15:15:32, 13 December 2024)
- ML20093K780 + (15:15:32, 13 December 2024)
- ML20093K776 + (15:15:33, 13 December 2024)