ML20093K848

From kanterella
Jump to navigation Jump to search
Responds to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves
ML20093K848
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/11/1995
From: Hutchinson C
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-95-07, GL-95-7, GNRO-95-00113, GNRO-95-113, NUDOCS 9510250039
Download: ML20093K848 (3)


Text

'?

i Ent:rgy Oper.ti:ns, Inc.

P 56

= ENTERGY MS 39150 Tel 601437 2800 C. R. Hutchinson October 11, 1995 we nese orwas Grsd Gutt tuem Swon U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C.

20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Generic Letter 95-07 GNRO-95/00113 Gentlemen:

Pursuant to Generic Letter 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves", Entergy Operations, Inc. is submitting this required 60 day response letter as notification that Grand Gulf Nuclear Station (GGNS) intends to implement the requested actions of the generic letter.

GGNS will implement the actions requested in GL 95-07 on the following schedule:

By November 15, 1995 complete the screening evaluations to identify potentially susceptible valves and document operability basis or take action in accordance with Technical Specifications.

By February 13, 1996 complete further analysis and identify corrective actions required to ensure susceptible valves are capable of performing their intended safety function.

The 180 day response to Generic Letter 95-07 will provide the information requested by the generic letter and a completion schedule for any planned equipment or procedural modifications.

Yours tru y, f

s H/RRJ attachment:

Af firmation per 10CFR50.54 (f) cc:

(See Next Page)

..-, n - n -4 9510250039 951011 PDR ADOCK 05000416 P

PDR

?.

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE NO. NPF-29 DOCKET NO. 50-416 l

i IN THE MATTER OF MISSISSIPPI POWER & LIGHT COMPANY and SYSTEM ENERGY RESOURCES, INC.

and SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION and i

ENTERGY OPERATIONS, INC.

+

i l

AFFIRMATION f

I, C. R. Hutchinson, being duly sworn, state that I am Vice President, Operations l

GGNS of Entergy Operations, Inc.; that on behalf of Entergy Operations, Inc.,

System Energy Resources, Inc., and South Mississippi Electric Power Association I i

am authorized by Entergy Operations, Inc. to sign and file with the Nuclear i

Regulatory Commission, this 60-Day Response to Generic Letter 95-07; that I signed c

this application as Vice President, Operations GGNS of Entergy Operations, Inc.;

i and that the statements made and the matters set forth thergin are true and correct to the best of my knowledge, informat nad 1/ eft __

j

?--

~

e C. R.~Hutchinson i

STATE OF MISSISSIPPI COUNTY CT CI AIBORNE e me, a Notary Pu ic, n and for the County and SUBSCRI3dD AND SWORN TO befor/d Stato above'ndmed,'this

/

day of

, 1995.

(SEAL)

/

W5 Notary Public M M nEYwTKMRfE*1C Mf COMMISSION EXPIPIs JUW 5, IMS BONIED THRU STEC.01 f;0 LEY GTJET, j

j 1

' October 11, 1995 GNRO-95/00113 Page 2 of 3 cc:

Mr. J. E. Tedrow (w/a)

Mr. H. W. Keiser (w/o)

Mr. R. B. McGehee (w/o) i Mr. N. S. Reynolds (w/o)

Mr. H. L. Thomas (w/o)

Mr.

P. W.

O'Connor, Project Manager (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.

20555 Mr. L. J. Callan (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 1

i i

i