Omaha Public Power District 1623 Harney Omaha, Nebraska 68102 402/536 4000 July 26,1984 L IC-84-211 l
Mr. James R. Miller, Chief l
U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Operating Reactors Branch No. 3 Washington, D.C.
20555
References:
(1)
Letter from W. C. Jones to J. R. Miller, dated March 9, 1984 (LIC-84-062)
(2)
Docket No. 50-285
Dear Mr. Miller:
Radiological Effluent Technical Specifications (RETS)
The Omaha Public Power District's letter to the Commission, dated March 9, 1984, provided a revised schedule for submittal of specifications intended to resolve the remaining issues for RETS relating to the Fort Calhoun Sta-tion. That schedule was based on the District's manpcwer requirements for the refueling outage and the fact that the refueling outage was scheouled to end in early May,1984.
Hcwever, several recent events have affected resources intended for completion of the RETS related analytical work, pri-marily the May 16, 1984 steam generator tube failure. Following'this fail-ure, all available resources were devoted to the steam' generator tube fail-ure recovery effortis. The-recovery ef forts included preparation of reports to the Commission, preparation for rrectings with tne Commission and imple-mentation of corrective actions. The activities associated with the steam generator tube failure, coupled with the unavailability of key personnel, has caused.a delay in the District's RETS submittal, as discussed w'th your staff on June 27 and July 20, 1984.
The Fort Calhoun Station.hn returned to power cperation and, consequently, some personnel who were involved with activities associated with the steam generator tube failure are now worting on finalizing the RETS submittal. provides a description of the reminit;J RETS items along with revised submistal dates. -
8407310236 G40726 PDR ADOCK 05000285 P
PDR 1
c5 ss24 Emptoume uat opporra.vtg
- =.
o x
Mr. James R. Miller, Chief July 26,1984 Page Two Based upon the current schedule, the District intends to provide the next RETS submittal on September 1,1984. This RETS submittal will address the remaining RETS issues relating to Fort Calhoun Station. The September 1, 1984 submittal will include Technical Specifications, which the District believes will satisfy NUREG-0472 (Draft 7) and 10 CFR Part 50.36a require-ments.
Sinc 1,
R. L. Andrews Division Manager Nuclear Production RLA/CWN/rh-B Attachment cc:
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036 Mr. E. G. Tourigny, Project Manager Mr. L. A. Yandell, Senior Resident Inspector s
Attachment OMAHA PUBLIC POWER DISTRICT RADIOLOGICAL EFFLUENT TECHNICAL SPECIFICATIONS SCHEDULE Description Date 1.
Submittal of proposed Technical Specifica-September 1,1984 tion changes incorporating radiological effluent monitoring and surveillance re-quirements conforming to dose design objectives of Appendix I,10 CFR 50, to the NRC.
2.
Submittal of proposed Offsite Dose Calcula-September 1,1984 tion Manual (0DCM) (containing the methodology and parameters equivalent to offsite dose calculational manual objectives) to the NRC.
3.
Availability of a formal Process Control Pro-November 1,1984 gram (PCP) (containing operating procedures detailing the sampling, analysis, and evalu-ation methods equivalent to process control program objectives) at the Fort Calhoun Sta-tion.
4.
Implementation of Radiological Ef fluent Tech-Sixty days af ter nical Specifications, ODCM, and PCP.
receipt of issued Facili ty Operating License Change and revised Technical Specifications.
,