Informs That Upon Issuance of Safety Evaluation on Resolution of Generic Issue Re Integrity of BWR Scram Sys Piping (NUREG-0803),util Will Comply W/Generic Resolution, Including Recommendations in 841013 Telcon
ML20093K897
Person / Time
Site: Limerick Constellation icon.png
Issue date: 10/15/1984
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
References
CON-#484-585, RTR-NUREG-0803, RTR-NUREG-803 OL, NUDOCS 8410180215
Download: ML20093K897 (3)


Text

_ __

mm e

[

\\

~

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET r

E" P.O. BOX 8699 PHILADELPHI A PA.19101 L

JOHN 5. KEMPER VIC E-PR ESID E NT October 15, 1984

...............n...c" Mr. A. Schwencer Docket No.:

50-352 Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Ccmnission Uashington, D.C. 20555

Subject:

Limerick Generating Station, Unit 1

^3 NUREG-0803, " Generic Safety Evaluation Report Regarding Integrity of BWR Scram

[

System Piping".

G

References:

1) letter frm D. R. Helwig (BhPOG) to

[

D. G. Eisenhut (NRC) titled "Transnittal of E

Additional Information on Scram Discharge Pipe Breaks Requested by NRC Staff at February 23, 1984 Meeting with BWR Owners' Group (BWROG)" dated May 10, 1984.

2)

R. J. Stipcevich (PECO) and B. Siegel (NRC) telecon dated 10/13/84.

File:

GOVT l-1 (NRC)

Dear Mr. Schwencer:

The reference 1) letter provided an evaluation of the subject concern by the BWR Owners' Group.

The reference 2) telecon requested Philadelphia Electric Capany's cmmitment to ocuply with the reommendations contained in that report to resolve this generic issue. Specifically to:

1.

Confirm that the leak rates, loading conditions and material properties for the scram discharge volume piping system are bounded by the limiting value for these parameters identified in the May 10, 1984 BWROG letter.

2.

Cmply with the BhTOG r-ndations on leak detection j

capability.

3.

Cmply with the applicable generic secondary containment g 7cy procedures guidelines.

[\\

8410180215 841015 PDR ADOCK 050003S2 A

PDR j

l O i

r

~ 3

-4.

Provide assurance that the expected radiation field and contact exposure' level at the scram discharge volume piping

_ system in the facility will not inpair the performance of routine' test inspections and post scram reset walkdowns.

'Ib date~,' the NRC has not issued their safety evaluation on the resolution of this generic issue. Upon issuance of that safety evaluation,~ Philadelphia Electric will emply with the generic resolution of this concern, including the appropriate recumerdations as outlined above.

Sincerely, h4? -

f"/:-

y.e.,

TES/RTS/gra/10158401-cc: 'See Attached Service List

~.

l

i b

i g:.

cc: -Judge Helen F. Hoyt

. Judge Jerry. Harbour-

. Judge Richard F. Cole

~

Judge Christine N. Kohl

- Judge Gary.J. Ed1es dudge Reginald L. Gotchy Troy.B. Conner, Jr., Esq.

Ann P. Hodgdon,_Esq.

Mr. Frank R. Romano Mr. Robert ~L. Anthony

- Ms. Phyllis.Zitzer Charles W. Elliot, Esq.

Zort G. Ferkin,-Esq.

Mr. Thomas Gerusky.

.D1 rector, Penna. Emergency. Management Agency

- Angus R. Love, Esq.'

David.Wersan, Esq.

Robert J. Sugarman, Esq.

-Martha W. Bush, Esq.

Spence W. Perry, Esq..

day M. Gutierrez, Esq.

Atomic Safety & Licensing Appeal Board Atomic Safety & Licensing Board Panel Docket &. Service Section Mr. James Wiggins

.Mr. Timothy-R.~ S.-Campbell' 1

e t-N-

-g-p

,r~--

p.e---

e w

ensw.---

p+4.e.~,e r y.,,--,p

..s--

-.-c..

. -,.....,-. ~

..-,es w-w e

-,