ML20093K810
| ML20093K810 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 07/20/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| TAC-55177, TAC-55178, NUDOCS 8407310202 | |
| Download: ML20093K810 (8) | |
Text
=_
~
,.7
+
- f--
iV DUKE POWER GOMPANY P.O. Box 33189
' CliARLOTrE. N.C. 28242 -
HALH. TUCKER ruternoxz ena,emesseur (704) 07:>4531 July 20, 1984 mu. --
i~
Mr. Harold R. Denton, Director Office of Nuclear-Reactor Regulation U.'S. Nuclear-Regulatory Commission Washington, D. C. 20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4
Subject:
McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Base Load Operation Technical Specifications
Dear Mr. Denton:
My letter of June 14, 1984 submitted proposed license amendments to Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station, Units 1 and 2, respectively. The amendments (which werel subsequently approved on June 21,1984) expanded the Power Distribution Limits section of the McGuire Unit 1 Techni:a1 Specifications to include Base Load Operation in addition to the previously approved RAOC Operation.
The McGuire 1 Cycle 2 Peaking Factor Limit Report format and content were amended to provide information which permits the exact determination of W(z) versus core height as a function of cycle burnup through the use of three point interpolation of three sets of burnup specific data. The report provides the elevation dependent W(z) values that are to be used as inputs to define the appropriate fitting coef-ficients for W(z) interpolations to be performed as a function of cycle burnup and axial elevation for RAOC and Base Load Operation,'and the value for APLND. The June 14, 1984 submittal (Attachment 2A) included an amended McGuire Unit 1/ Cycle 2 Peaking Factor Limit Report which contained the W(z) functions for RAOC Operation during Cycle 2 and Base Load Operation in the Cycle 2 burnup range of 1200 to 6000 MWD /MTU, and indicated that the base load W(z) functions for the remainder of Cycle 2 (Burnups greater than 6000 MWD /MTU) would be submitted in July, 1984.
Attached is the Peaking Factor Limit Report for McGuire Unit 1/ Cycle 2 Base Load Operation in the Cycle 2 burnup range of 1200 to 10,200 MWD /MTU. This information has been derived for Base Load Operation with a 3 percent AFD about a measured target in the power interval from 80 to 100 percent of rated thermal power. The
.W(z) functions for Cycle 2 burnups of 1200, 3000, and 6000 MWD /MTU were previously transmitted in the June 14, 1984 submittal. These functions are included in Figures 1--3 of the attached report for' completeness. W(z) functions for the re-mainder of Cycle 2 (8000 and 9500 MWD /MTU) are given in figures 4 and 5.
Using the W(z) functions shown in figures 1-5, the W(z) values for Cycle burnups between 1200 and 10,200 MWD /MTU can be determined using three point interpolation (for three point interpolation, the W(z) values from the three burnup steps closest to the measured burnup are used).
8407310202 840720 PDR ADOCK 05000369 Apf 4g0 P
'lI
}qMb
E g-2 In addition,ithe June 14. 1984 submittal indicated that'the application contained one Class III License Amendment for McGuire Unit 1 and one Class I Amendment for McGuire' Unit 2.(pursuant to 10 CFR 170.22), and that consequently.
!a check in the amount of $4,400.00'would be forwarded separately in accordance with 10 CFR 170.12. This check is enclosed.
Very-truly yours, hh l
f, Hal B. Tucker PBN:glb Attachment Enclosure cc:
(w/ attachment)
Mr. James'P. O'Reilly, Regional Administrator U.1S. Nuclear Regulatory Commission Region II, 101 Marietta Street,164, Suite 2900 Atlanta, Georgia 30323 Mr. Dayne Brown, Chief Radiation Protection Branch Division of Facility' Services Department of Human Resources P. O. Box 12200 Raleigh, North Carolina 27605 Mr. W. T. Orders Senior Resident Inspector McGuire Nuclear Station 4
~-
-5
-PEAXING FACTOR LIMIT REPORT'FOR MCGUIRE UNIT 1, CYCLE 2 BASE LOAD OPERATION This Peaking Factor Limit Rap";rt 'is provided in accordance with Paragraph 6.9.1.9 of_ the McGuire Unit 1 Technied Specifications.
The McGuire Unit 1 Cycle 2 'elevstion dependent W(z) values for base load operation between 80% and 100% of rated thermal power with a 3 percent AFD about a measured target value-at 1200, 3000, 6C00, 8000, and 9500 MWD /MTU Cycle 2 burnups are shown in'Fi W(z) gures 1 through 5 respectively. This information is sufficient to determine versus core height for tycle 2 burnups in the range of 1200 MWD /MTU to 10,200 MWD /MTV through the. use of three point interpolation. W(z) was calculated using the method described in Part 8 of Reference 1.
The minimum allowable power level for ba:;e load operation, APLND for McGuire 1 Cycle 2 is 80 percent of rated thermal power. The appropriate W(z) function is used to confirm that the heat flux hot channel factor, F (z) will be limited to the Technical Specification values of:
9
~2.15 F (z) 1 P
[K(z)] for P > 0.50 and 9
F (z) 1 4.30 [K(z)] for P 1 0.50 q
The appropriate elevation dependent W(z) values, when appliea to a power distribution measured under equilibrium conditions, demonstrates that the initial conditions assumed in the LOCA are met, along with the ECCS acceptance criteria of 10CFR50.46.
(1) WCAP-10216-P-A, Relaxation of Constant Axial Control - F S
g urveillance Technical Specification.
1 l
1 i
MEIGHT max (FEET) w(2)
BOT e.H 1.tM :
2
.29
- 1. 4 M I g,g j
3
.de 1.see a l
4
.se 1.004 I g, g 5
.33 3.ete z 6
1.44 1.000 t g,4 7
1.29 1.tes 2 8
1.44 1.394 8 I* "
9 1.64 1.844 3
{
te 3.34 3.478 I* O 11
- 2. M 1.963 12 2.29 1.aEE
!* 4 33 2.44 1 463 e
to 2.68 1 068 1
1.2 15 2.54 1.853 g6 3.M 1 455 1.5 17 3.29 1.451 18 3.44 1.048 19 3.64 1.446 1.34 29 3.88 1.884 f.2 23 4.De 1.943 22 4.28 1 841 i
3.3 23 4.48 3 888 24 4.64 1 839 5
l 25 4.30 1.837 2
1.23 26 5.84 1 838 l
27 5.29 1.042 w{ gg 22 5.44 1.946 hg l
J 29 5.63 1 253 g
3e 5.38 t.454 1.
i 3i 6.a 62 o
g,n 32 6.29 1.869 d
6 l
l 33 f.44 1.872
!.JO 34 6.64 1.074 g
n 35 6.24 1.877
{
t.14 I
36 7.49 1.479 37 7.29 1.888 ft 1
=
I*II 33 7.44 1.481 39 7.64 1.481 f
!.14 44 7.54 1.481 41 3.ee g.agt f.12 I
42 8.20
- 1. ate 43 3.4e 1.e 9 hto '
44 8.64 1.076 45 8.te 1.074 l
46
- 9. N 1.072 1,:10 3':
':'3 47 9.29 1.871 i gf r.
st 8 { 218 3 ll #
48 9.44 1.072 t, g 49 g,gg g,g73 8
. s!I 3
8 54 9.33 1.f73 f"
g 1
Si te.N 3.473 I
52 10.28 1.475 I
l l
g 53 10.4e 3.tes l
54 t,
55 t.o.g a i..t+e a l
m i..
M i:#: '
m i 2.
s.
.. m m 7
.... i..
n..
o 53 11.44 1.ees t M TM M 33 11.Ge t. Me I 64 11.2e 1.eee TO P 61 32.se t.ees :
1 Too and bot tem 15 % excluded as per Technical Scectiteation 4.2.2.1..g FIGURE 1 fic GUI R E. UNI T 1,
CYCLE 2 i
EASELCAD LM::) FOR PCWERS BETWEEN 80% f.ND 100% OF RATED THERMAL pct 4ER N! THIN f, 3 PERCENT AFD OF THE MEMURED TMGET i
1200 MWD /MTU
w.
- -- - m 1
1 7
l
\\
MEIGHT waI (FEET)
WCZ3 N
BOT
...se.
l j
I
.M
- t. See.
Le l
t 3
..e Le l
l
.u s
.s.
i.see.
a s.se s.ao.
{
i,.s 7
9.M l
)
9
.t. ame.
e
..mo.
- 9. as.
t.se.-
is i.a i.m i
H e.se s.tra i,a4 II
- 3. M,,
,t.,t,7,
-h g3 g,
1.2 84 7.se 6,as3 15 4.as 3.3T3 b3 ts 3.se s.ess 17 3.M 9.as s l
3,34
'l 58 3..e
- s. ke l
.t. s.as M
3..
g,g 21 4.as
- e. p.c l
22 4.M t, s..
g
,g M
4.ee f. >=e
)
79 4.se f.K]s N
l 1
5 4.3.
3, g3s j
M S.as e.gls I ba i
EF gM g. p.e I
M 5..e has j
M 5.se e. po Je 5.as i.es s La l
35 s.ae
- s. sse C
d w
s.M e.sss i,a 23 s.ae
.i.as7 3
s..
3 s.am 1.371 35 7.as 3.37g h
I 77 7.M 1.7 73 k:s
{
{
3e 7,. g
,e. s?.
}
l l
l n
..e
,m bl%
=
7.as
- i. r3
.1 B.a.
g. 37.
1 bla 42 8.M t. 87.
o s.*
s.m 3,te l
l s.se e.m l
t as s.a.
- i. m g
l l
as 9.a.
sm a
s.ru i.an Ir gig l
iIg ta s &I laggggasas4 g
a 9..e s.m bE i
t e
y 9
9.se f r3
- ;, ll i, g t '
n In
- 9. Se 9 g3
' 3:g, l
bOs i
H is.ee s.m l
52 v.s.M
- g. gyp i
~
,s.-
.e.
gg....
...j
.g _
. l 1s is.se o. a.
se is.se e..m bet t.at &W 18 43 Le 440 bag &W 65 14 5
- 11. 2 tha as is.ae
- s. ame.
57 it.ie e eus e 1.
59 19.54
.I. e.
C:M gros yttn TOP si is.se i.eus.
se s. s.
l 1 Too and bottcm 15 % excluded as per Technic al Sceciticaticn.2.2.2.49 FIGURE 2 McGUIF.E UNIT 1, CYCLE 2 EAiELCAD W(::) FCR PCUE;S EETWEEN 50% AND 100% OF F :.TED THE.:fd;-L PCNEF WITHIN,+, 3 PE:. CENT AFC OF THE MEAiUFEL T RGET 3000 MWD /MTU 1
i
y
'O HElGHT
>J2 (FEET) w(2) 8079 e.se f.een a 2
.2e 1.8me e 3
.ee f.eme e I*M 4
.M t.ame e S
.Se t.ame e 3* 4 8
9.85 8.sme e 7
3.M t.eas e I* *8 8
3.*e 9.MW e 9
9.se 9.ame e l' "
10 9.go 3.ars Il 2.se t.see I' #
it E.N t.M 13 f.ee 1.s79 I* *8 14 f.se f.ess t$
3.se 3,ame I*3 16
- 3. se 9.m4 17 3.M t.6=e 13 3.ae f.ees 19 3.se t.e*e g
.3 3.as t.oes 21 4.as
- 1. Dea g
22 4.M t. 4'e t 23 4.4e 9.E30 g g 24 4.se 0.877 2
25 4.M t.E35 w
M
$.3e 1.333 IE
- 7 5.M t.tri u
M s.=
t.s33 b
as s..
- t. ras a
38, 5.m t.83e s
s.m f.ee O
63 d
32 8.M t.M3 33 8.4e
- t. N7 8.2 34 6.Se t.SES 35 6.M t.se km 3E 7.85 0.854 37 7.25 1.Ses La 38 7.4e 9.asa 3e 7.se t.See hit se 7.2 1.571
- t 8.se t.m I. I2 42 8.2e 1.872 L ie 43 B.ee f.s79 8.se f.FPt t
8*"
l.de
'a I' M
,;* ',ggtl 18835 3aaa
,a
- 8 8*88
- FPI I
8.3E g"
o 3.3 g,m ee 9.4e
- f. FFF 2
4.M ITt '";ag IIIg; Se 9.95 9.977 I*
I.#
$9 te.Se 9.FPF S@
te.M t.FPF F3 t o. se 9.ame a 1.40 la to.se t.ame e
&W W
2.de 18e 4M S.M t.40
%M b ee 9.as t&S lb se 110e H
to.8e 9.aus e le 91.88 1.aus e 97 ft.2e 9.ame e CUT MICHT FET) sa it.ee 9.ame e so it.se 9.ame e u
i t. se i.mo e TOP si fa.se 9.ame.
X Tco and bottcm 15 % excluded as per Technical spec i f i c a t i on 4e2.2.4 9 FIGURE 3 McGUIRD UNIT le CYCLE 2 EASELCAD W(::) FOR PCNEFS BETWEEN SO% AND 10M. OF RATED THERMAL PCWER WITHIN f, 3 FERCENT AFD OF THE MEASUFED TAFGET 6000 K40/MTU
e 1
kt!cMt mx (FEET)
W12) i 1 50 BOT 1 0.88 1.888
- l l~
l I
2
+28 1 888 8 g,
3 48 1.808
- i i
I
.6 1.eet a 4
. s.0 5
i.en i
l 6
s.n i.ea 1.64 7
1.29 1.888 8 3
1.44 1.eH 2 1* *3 g
1.G4
- 1. 6 H
- 18 1.88 1*891 33 2.H 1 0$$
- 3. **
i
$2 2.20 5*080 8.se 13 2.44 1 874 14 2.68 1.067 15 2.20
- 1. 86 4 I. M 16 3.e4 1.053 17 3.20 1.848 t.34 13 3.44 1.846 4
19 3.60 1.e45 3.2 29 3.80 1.044 21 4.0e 1.042 I.2 22 4.29 1.044 Of I
23 4.48 1.839 2 g,a 24 4.64 1.037 x
25 4.80 1.035 1 g,gg 26 5.00 1.833 27 5.20 1.032 h
t.3 23 5.44 1.0 32 29 5.6e t.e23 72 e
22 34 5.Se 1.435 1
31 6.94 1.042 I*M 32 6.2e 1.eSe E"
33 6.40 1.053 E
I.18 34 6.68 1.e55 25 6.80 1.058 8
1.16 36 7.99 1.e64 37 7.29 1.06 2 l
33 7.40 1.065 1.14 33 7.68 1.966 4e 7.80 1.963 1.12 41 3.00 1.969 42 8.20 1.669 1.10 43 8.44 1.074 r i 44 8.60 1.072 1.00 2
45 8.se 1.e75 a
aJ35**'
1.06
..r88 l a 1, 46 9.9e 1.076 a
,,8ga*
47 9.2e 1.877 l
48 9.d8 1.e77 tgy,,,
g.cn 49 9.64 1.473 "a';88aa 54 9.88 1.678 g,g 51 te.ee 3.e77
\\.-
5.
i..G.
q 52 10.2e 1.073 53 10.4e
' ",;......-, ; 3.,,,
s.
- 5..
H 1.
==
s.
is =
u=
u.=
- .gs -
3. se.
i..,
g.ge 57 it.2.
m er ani it.4 i.e...
Si ii..
- i....
5 ii.6
- i...
6 TOP 61 12.ee 1.000.
t Too and bottom 15 % excluded as per Technical Specification 4.2.2.4 9 FIGURE 4 McGUlFE UNIT 1,
CYCLE 2 EASELOAD W(D FOR PCWERS BETWEEN 80% AND 100% OF RATED THERMAL pct 4E WITHIN +
3 PERCENT AFD OF THE MEASURED TARGET 8000 MWD /MTU
3 HE!3Mr Mar (F(ET)
UtZl -
-/
BOT 1 8.88 1*888 8 1.M j~
j g~
f-2
.24 1.004
- 1.*G g
.3
.de 1.000
- Y l
4
.64 1.898 1
{
h h
S
.30 1.000 2 I.4 6
1.00 1.864 8 l
l 7
1.29 1.000 I f.M 8
1.48 1.000 3 i
I g
1.9 1.60 1.004
- 1.8.
1.e9.
1.43 11 2.00 1.985 l
12 2.20 1.879 1.ao 13 2.40 1.073 s.se 14 2.63 1.966 15 2.86 1.059 16 3.00 1.952 t.M 17 3.20 -
1.047 L
g,y 18 3.44 1.446 19 3.60 1.046 l
20 3.80 1.946 1.2 21 d"
I***I l
22 4.'20 1.044 I* E 23 4.4*-
1.044 2
1*3 l
l 24 4.6e 1.843 25 4.80 1.042 E" I*25 i
26 5.00 1.04 27 5.20 1.039 g
at 5.40 1.838 le 29 5.68 1.937 i-34 5.80 1.037 l
p ' I.22
.i 32
'6.29 1.849 31 6.40 1.843 h
1 30 33 6.46 1.951 l
E 34 6.64 1.054 g 1.te 35 6.88 1.858 36 7.40 1.061 g
l 37 7.23 1.864 3.18 38 7.40 1.066 l
l 39 7.68 1.969 33 49 7.80 1.072 l
41 8.00 1.073 I.12 42 8.20 1.875 l
43 8.48 1.076 1 10 44 8.64 1.977 g
g,3 L
45 8.80 1.077 46 9.e6 1.876
's IAma,1xszas 47 9.29 1.076 1.04 I_
,e,a:
48 9.40 1.076 8a 49 9.68 1.075 a
8 st"trr,m_
j,8 1 04 Se 9.80 1.073
...l 51 10.00 1.072 12 52 18.29 1.074 53 19.40 1.000 t g,3g
-l -
l 54 10.64 1.eee a
- g gg,,,
A00 1.00
& CD 1:0 42 5 00 h /J 7.00
&C 1 00 IS CD 18.00 lA00 t
Si 11.43 1.er' s CDE 4tCHT trttti 55 11.6a 1.e 62 11.80
- 1. f - )
- TOP 61 12.ee 1.000 r I Top And bottom 15 % excluded as per Techr.ical Spec i f i c a t i on 4.2.2.4 9 FIGURE 5 McGUIRE UNIT 1, CYCLE 2 EASELCAD W(::) FOR POWERS EETWEEN 60% AND 100% OF R WITHIN + 3 PERCENT AFD OF THE MEASURED TARGET 9500 MWD /MTU