Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000354/LER-1995-026-01, :on 951026,RMCS Found in locked-up Condition Causing Entry of LCO Action Statement.Caused by Failure to Maintain Power Supply within Required Tolerances. Investigation Continuing + (13:55:46, 13 December 2024)
- ML20095A100 + (13:55:47, 13 December 2024)
- ML20095A097 + (13:55:48, 13 December 2024)
- W3P84-2184, Application to Amend CPPR-103,extending Completion Date to 841231 + (13:55:49, 13 December 2024)
- ML20095A091 + (13:55:50, 13 December 2024)
- ML20095A081 + (13:55:51, 13 December 2024)
- A07702, Torsiograph Test of Emergency Diesel Generator 1A at Catawba Nuclear Power Station + (13:55:53, 13 December 2024)
- ML20095A068 + (13:55:53, 13 December 2024)
- ML20095A045 + (13:55:56, 13 December 2024)
- ML20095A033 + (13:55:57, 13 December 2024)
- ML20095A031 + (13:55:58, 13 December 2024)
- ML20095A027 + (13:55:59, 13 December 2024)
- ML20095A022 + (13:56:00, 13 December 2024)
- ML20095A018 + (13:56:01, 13 December 2024)
- ML20095A008 + (13:56:02, 13 December 2024)
- ML20095A010 + (13:56:02, 13 December 2024)
- ML20094S659 + (13:56:03, 13 December 2024)
- ML20094S654 + (13:56:04, 13 December 2024)
- ML20094S646 + (13:56:05, 13 December 2024)
- ML20094S649 + (13:56:05, 13 December 2024)
- ML20094S642 + (13:56:06, 13 December 2024)
- 3F0492-03, Documents Closure of Open Commitment Re Sebring Utils Commission Transfer (Amend 140) of Ownership Share to Florida Power Corp.Transfer & Ownership Completed on 920318 & Became Effective on 920319 + (13:56:07, 13 December 2024)
- B11261, Forwards Response to SER Open Item Re Internally Generated Missile from nonsafety-related Equipment & Effect on safety-related Equipment,Per + (13:56:07, 13 December 2024)
- ML20094S613 + (13:56:08, 13 December 2024)
- ML20094S605 + (13:56:09, 13 December 2024)
- ML20094S603 + (13:56:10, 13 December 2024)
- ML20094S599 + (13:56:11, 13 December 2024)
- ML20094S602 + (13:56:11, 13 December 2024)
- ELV-03637, Monthly Operating Repts for Mar 1992 for Votgle Electric Generating Plant,Units 1 & 2 + (13:56:12, 13 December 2024)
- ML20094S593 + (13:56:13, 13 December 2024)
- ML20094S589 + (13:56:14, 13 December 2024)
- ML20094S588 + (13:56:15, 13 December 2024)
- ML20094S581 + (13:56:15, 13 December 2024)
- ML20094S579 + (13:56:16, 13 December 2024)
- BVY-92-042, Monthly Operating Rept for Mar 1992 for VT Yankee Nuclear Power Station + (13:56:17, 13 December 2024)
- ML20094S575 + (13:56:17, 13 December 2024)
- ML20094S571 + (13:56:18, 13 December 2024)
- ML20094S567 + (13:56:19, 13 December 2024)
- ML20094S559 + (13:56:20, 13 December 2024)
- ML20094S546 + (13:56:21, 13 December 2024)
- ML20094S555 + (13:56:21, 13 December 2024)
- ML20094S545 + (13:56:22, 13 December 2024)
- ST-HL-AE-1019, Forwards Rev 5 to QA Program Description for Design & Const Phases.Includes Revs to Bechtel & Ebasco Programs + (13:56:23, 13 December 2024)
- ELV-03632, Special Rept 2-92-2:on 920317,dust & Debris Observed Settling in Vicinity of Generator End of Diesel.Caused by Large Piece of Fireproofing Insulation Falling Into Lead Termination Box.Power Termination Box Repaired + (13:56:28, 13 December 2024)
- W3P84-2196, Submits Addl Info Re Radwaste Solidification Process Control Programs.Nus Process Svcs Corp Will Perform Initial Solidification.Expeditious Review Requested to Facilitate Interim Approval to Process Wet Radwastes + (13:56:29, 13 December 2024)
- ML20094S522 + (13:56:29, 13 December 2024)
- ELV-03627, Special Rept:On 920320 & 21,invalid Failures of DG 2A Occurred Due to Inadequate Fuel in Supply Lines & Governor Speed Increased Too Slowly.On 920322,DG High Vibration Trip Occurred Due to Defective Sensor.Sensor Replaced + (13:56:30, 13 December 2024)
- ML20094S517 + (13:56:31, 13 December 2024)
- 05000265/LER-1995-004-01, Forwards LER 95-004-01 Re Condenser Vacuum Scram Switches Found Out of TS Limits Due to Apparent Setpoint Drift + (13:56:34, 13 December 2024)
- GO2-92-083, Forwards Rev 22 to Physical Security Plan.Rev Covers Security Contingency Measures for Physical Protection of Util Facilities in Which SNM Used.Rev Withheld (Ref 10CFR73.21) + (13:56:38, 13 December 2024)
- ML20094S497 + (13:56:39, 13 December 2024)