Forwards B&W Summary Technical Repts of First Capsule from Reactor Vessel Surveillance Program,Per App H of 10CFR50. Repts Delayed Due to Administrative Oversight
ML20095A081
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/16/1984
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20095A084 List:
References
479, NUDOCS 8408210375
Download: ML20095A081 (1)


Text

_

VIRGINIA ELEcrRIC AND POWER COMPANY HIcIIxoxn, VIRGINIA 2020,1 w.L. sin w ar Vace Passepawr noc2.ai or==inoi.. August 16, 1984 Mr. Harold R. Denton, Director Serial No. 479 Office of Nuclear Reactor Regulation M0/JHL:acm Attn: Mr. James R. Miller, Chief Docket Nos. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND_2_

REACTOR VESSEL MATERIAL SURVEILLANCE TEST RESULTS Per the requirements of 10 CFR 50, Appendix H, Reactor Vessel Material Surveillance Program Requirements, enclosed is one copy of the summary technical reports of the first capsule from the North Anna 1 and 2 reactor vessel surveillance program. Due to an administrative oversight, these reports were not submitted within the timeframe specified in 10 CFR 50, Appendix H (one year).

As a result of the evaluation of the first capsule of the reactor vessel surveillance program at North Anna 2, the pressure-temperature limits are being revised and the operating period for these new limits will be extended to 10 effective full power years. These changes are being submitted in the form of a amendment request and will be submitted by October,1984.

The evaluation of the changes to the North Anna 1 pressure-temperature limits and the operating period has not been completed. This evaluation should be completed by December, 1984 and the changes necessary will be submitted by February, 1985. The current pressure-temperature limits will remain bounded by the original five effective full power year curves.

truly you s, 8408210375 840816 DR ADOCK 05000 _ hyv

g. L. Stewart Enclosures cc: Mr. James P. O'Reilly (w/o enclosures) A Regional Administrator Region II 4 i\\