Responds to Re NUREG-0737,Item II.E.4.2(7), Purge & Vent Valve Isolation. Revs to Unit 2 Tech Specs Expected to Be Submitted by 840905.Unit 1 Mods Will Be Completed During Scheduled Fall 1984 Refueling Outage
ML20095A008
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/16/1984
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.4.2, TASK-TM NED-84-425, NUDOCS 8408210357
Download: ML20095A008 (2)


Text

  • Georgia Pcmer Company i 6 333 Piedmont Avenue l A'!anta, Georg:a 30308 Telephone 404 5266526 Ma+ng Address: '

Post Off.ce Box 4545 Atlanta. Georgia 30302 Georgia Power L T. Gucwa tre sournem electoc system Manager Nuclear Engineering and Chiet Nuclear Eng:neer NED-84-425 August 16, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Comtission Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HMCH NUCLEAR PIRTP UNITS 1, 2 NUREXI-0737 ITEM II.E.4.2(7), PURGE AND VENT VALVE ISOIATION Gentlenen:

In your August 1,1984 letter it was noted that Georgia Power Cmpany (GPC) had camiitted to the subnittal of Technical Specifications for the subject iten but had not done so. It was also noted that the NUREG-0737 requirenents had been established for a "long time" and that the NRC staff sought their timely implenentation. GPC was requested to subnit the appropriate Technical Specifications within 30 days of receipt of your letter (if the modifications were cmplete).

GPC wishes to respond to the connents made in your letter. Concerning establishment of the requirenents, the IER Owners Group took exception to Item II.E.4.2(7) shortly after NUREG-0737 was issued. This item was the subject of considerable discussion, and it was not until your letter of July 29, 1983 was issued that the final requirenents were established. With respect to GPC's~ cemit2nent, it was proposed in our August 31, 1983 letter that the required mo-Jifications be implemented during the scheduled 1985 refueling outages. Approval of this proposal was granted by the NRC letter dated Septenber 29, 1983. The GPC letter of April 10, 1984 provided a detailed description of the intended modifications and the Technical Specification revisions which would be subnitted following implenentation.

Although GPC is not obligated to do so until the 1985 outage, we have recently empleted the modifications to Hatch Unit 2. Appropriate revisions to the Unit 2 Technical Specifications are expected to be subnitted by 8408210357 840816 pDRADOCK 05000321 hh PDR s

'D GeorgiaPower d Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 August 16, 1984 Page 'IWo Septenber 5,1984. 'Ihe Unit 1 modifications will likely be car.pleted during the scheduled Fall 1984 refueling outage. It is our intent to subnit

" revisions to Unit 1 Technical Specifications following canpletion of the modifications.

Please contact this office if there are any questions.

Very truly yours, f N ^: r_=

L. T. Gucwa JHAnb xc: J. T. Beckhan, Jr.

H. C. Nix, Jr.

J. P. O'Reilly (NRC- Region II)

Senior Resident Inspector m_ - . _ _ _ , , , - , _ . _ ~ _ , _ - - - - , , - . - - - - - - , - - - , - - - - - - , - - * *-- - - - * - ~ ~ " - - - - - ~ - ' -