Rev 5 to QA Program for Design & Const of South Texas Project
ML20094S555
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/01/1983
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20094S541 List:
References
NUDOCS 8408210317
Download: ML20094S555 (54)


Text

r PART A HOUSTON LIGHTING AND POWER COMPANY QUALITY ASSURANCE PROGRAM DESCRIPTICN SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION REVISION 5

DATE November 1. 1983 8408210317 831101 PDR ADOCK 00000498 A

PDR

4 TABLE 1 ANSI STANDARD AND REGULATORY G]IDE COMPLIANCE rr The STP Quality Assurance Program complies with the following ANSI Standards and associated Regulatory Guides except as noted:

STANDARD TITLE ANSI N45.2-1971 Quality Assurance Program Require-R.G.l.28 (Rev. 0,6/72) ments for Nuclear Facilities ANSI N45.2.1-1973 Cleaning of Fluid Systems and Asso-R.G.l.37 (Rev.0,3/73) ciated Components During Construc-(see Notes 3 through 10) tion Phase of Nuclear Power Plants ANSI N45.2.2-1972 Package, Shipping, Receiving, Storage R.G.l.38 (Rev. 0,3/73) and Handling of Items of Nuclear (see Notes 11 through 16)

Power Plants ANSI N45.2.3-1973 Housekeeping During the Construction R.G.l.39 (Rev. 0,3/73)

Phase of Nuclear Power Plants (see Notes 17 and 18)

ANSI N45.2.4-1972 Installation, Inspection and Testing R.G.l.30 (Rev. 0,8/72)

Requirements for Instrumentation and (see Notes 19 and 20)

Electric Equipment During the Con-struction of Nuclear Power Generating Stations ANSI N45.2.5-1974 Supplem2ntary Quality Assurance Re-(see Notes 1 and 2) quirements for Installation, Inspection and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants ANSI N45.2.6-1973 Qualifications of Inspection, R.G.l.58 (Rev. 0,8/73).

Examination and Testing Person-As modified by positions C.5, nel for the Construction Phase C.6, C.7, C.8 and C.10 of of Nuclear Power Plants Rev. 1 (see Note 33) 5 ANSI N45.2.8-1975 Supplementary Quality Assurance Reg. 1.116 (6/76)

Requirements for Installation, (see Notes 21 through 23)

Inspection and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants ss Table 1-1

ro 4

TABLE 1 ANSI STANDARD AND REGULATORY GUIDE COMPLIANCE (Continued) written notification detailing what corrective action was taken and when the corrective action was. completed.

In actual practice, the audited organization will provide the auditing organization with documented corrective action including the date when the corrective action will be completed. The auditing organization will evaluate the corrective action response to determine if corrective action verification is necessary.

If verification is necessary, the corrective action verification will be performed after the scheduled completion date and the results of the verification will be documented.

33. HL&P Vendor Surveillance shall comply with ANSI N45.2.6 - 1978 and R. G.

5 1.58(Rev.1,9/80)only.

Exception is taken to regulatory position C.1 for personnel who (1) approve preoperational, startup, and operational test results and (2) direct or supervise the conduct of individual preoperational, startup, and operational tests.

These personnel will be qualified under the guidelines of ANSI N45.2.6 - 1978, rather than R. G.

1.8.

i Table 1-9

r Supplier control and use of Certificates of Conformance, when required by procurement documents, are evaluated by audits, vendor inspections or tests to ensure they are valid. The supplier's records shall include a description of those nonconformances from the procurement requirements dispositioned " accept as is" or " repair," including evidence of acceptance by the purchaser's engineering organization.

Site receiving inspection ensures that, for nuclear safety-related items received at the South Texas Project, there is accompanying documentation that indicates review and concurrence by the appropriate prime contractor or designee, that the item complies with established requirements or has an authorized waiver prior to shipment.

BEC Quality Assurance audits and surveillances are performed to ensure compliance with these criteria.

HL&P Design Office Quality Assurance ensures by audits / surveillance of the AE/ construction manager's vendor surveillance function that source surveillance and inspection are performed in accordance with the quality assurance program.

In addition, HL&P Quality Assurance performs audits and surveillances of activities commencing with receiving inspection at the site to ensure proper controls of purchased material and equipment are exercised and to insure overall compliance.

8.0 Identification and Control of Material, Parts and Components The HL&P Project Quality Assurance Plan requires that prime contractors and suppliers establish written procedures for the identification and 5

control of materials, parts and components including partially assembled components.

Prime contractor's and supplier's procedures shall include the documented verification at correct identification of materials, components and subassemblics, and that the method of identification does not affect the function or quality of the item prior to release of the items for assembly or installation. These procedures must:

Establish controls to identify and control materials (including consumables), parts and camponenta (including partially fabricated subassemblies).

Provide specific identitication and traceability controls when 5

required by codes, standards or specifications.

Provide a method for identification and control of incorrect or defective items. This system includes verification and documentation prior to release for fabrication, assembling, shipping and installation.

BEC and ESI Quality Assurance verify that the above criteria are incorporated into the quality / construction procedures during the 4

review / approval cycle and then follows up with audits and surveillances to verify compliance.

20

p --

PART B BECHTEL ENERGY CORPORATION QUALITY ASSURANCE PROGRAM DESCRIPTION SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION REVISION 5

DATE November 1, 1983

i 4

BECHTEL QUALITY ASSURANCE PROGRAM DESCRIPTIO!!

FOR SOUTH TEXAS PROJECT INTRODUCTION The Bechtel Quality Assurance Program Description used by the Bechtel Energy Corporation for the South Texas Project is described in the NRC approved Bechtel Topical Report BQ-TOP-1, Rev. 3A, Bechtel Quality Assurance Program for Nuclear Power Plants and the modifications and additions described below.

Throughout the Program Description (Part B) where the Program Description states Thermal Power Organization, it shall be construed 4

as synonymous with Bechtel Power Management.

Throughout the Program Description (Part B) where Construction Quality Control is stated, it shall be construed that Project Quality Control reports to the Project Quality Assurance tianager.

SCOPE OF SERVICES Bechtel Energy Corporation is responsible for Engineering, Procurement and l4 Construction llanagement activities at the South Texas Project. This activity includes receiving, storage, maintenance, receiving inspection and Quality.

Assurance functions. Bechtel Construction Management is responsible for management of the construction and quality assurance / quality control activities of the Constructor / Contractor (s). Construction flanagement consists 4

of planning, scheduling, monitoring and evaluating the Constructor / Contractor (s) construction and quality assurance / quality control activities. The construction, field engineering, and quality control activities defined in the topical will be the responsibility of the Constructor / Contractor (s). The 4

Constructor / Contractor (s) will be responsible for submitting to Bechtel, for approval, a quality program which is consistent and compatible with the applicable sections of Bechtel's Topical Report.

The following is a description of the South Texas Project modifications to meet the scope of the project and client requirements.

Section 1 - Organization o

1.5.4 Division Construction

!!anagers of Division Construction provide technical and administrativo direction to the Construction Department personnel. !!anagers of Division Construction are assisted by Construction Managers and Chief Construction Engineers, where assigned. Construction Managers are responsible for the management and technical direction of assigned projects, and for assuring that construction projects are provided with appropriate personnel and are following prescribed division practices and procedures for conduct of construction activities.

Revision 5 Page 1 of 10

r-o' 1.6.1 Project Quality Assurance o

The project quality assurance program is directed by the Project Quality V

Assurance llanager who is responsible to assure that Quality Assurance or 6

Quality Control actions listed below are accomplished in accordance with 14 the requirements of the project:

1)

Coordinate the functions of the project quality program, and serve 4

as the focal point for project conciunication on matters relating to this program.

2)

Coordinate project quality-related activities of Engineering, 4

Procurement, Project Administration, Records Management System, and Construction.

3)

Audit and surveillance of project quality-related functions and adherence to procedures. Advise management of the status of program implementation. Conduct prescheduled project audits and supplemental audits directed by the Project Quality Assurance Manager.

4)

Review Supplier and Constructor / Contractor (s) quality assurance l4 program requirements in procurement documents, conditional releases of nonconforming items at the construction site, and completed quality verification records packages prior to turnover to the client.

5)

Concur with evaluation of recommended supplier's quality assurance !

program, in accordance with subsection 7.1.

Evaluate supplier's 4

Quality Programs for jobsite originated safety related purchases when determined necessary by the Project Quality Assurance Manager.

6)

Take stopnork action when warranted.

7)

Identify quality problems, initiate documented action leading to a solution, and verify implementation of solutions.

8)

Review project plans and schedules for quality-related activities to assure timely and effective implementation of the quality assurance functions for the project.

4 9)

Provide periodic reports to the Division Quality Assurance lanager.

and Project flanager evaluating the status of the project quality assurance progran and advising of any problems requiring special attention.

10) Coordinate quality assurance functions within the project and with groups outside the division, such as M5QS and Procurement Supplier l

Quali ty.

1

11) Assure that quality assurance related procedures and manual.;

i

}

prepared by or used for the project meet project quality program requirements and initiate revisions when necessary.

Revision 5 Page 2 of 10

m

12) Review, prior to use, Procurement Quality Surveillance Inspection plans and Quality Control instructions for clarity and the existence of the information described in Sections 7 and 10.

In addition, evaluate the adequacy of selected plans and instructions by perfonning an in-depth review of:

a.

Accuracy of translation of drawing and specification requirements, b.

Basis for detemining inspection level and sequence.

c.

Adequacy of inspection method.

This review provides assurance that the total quality program requirements inclusions are complete. Reviews of generic plans and instructions can be performed on a generic basis.

In that_ case, the PQAM only verifies that the review of the generic plan or instructions has been performed.

13) Revidw and approve Constructor / Contractor (s) quality programs.

4

14) Prepare quality assurance descriptions in Safety Analysis Reports.
15) Review Nonconfomance Reports and other quality problem related documents to detennine trends, identify significant deficiencies, and recomiend appropriate corrective action.

The field quality assurance program includes the capability to perfonn:

o Receiving inspection of pemanent plant material and equipment.

o Maintenance and storage inspection of pennanent p1 ant equipment and material in Bechtel's custody.

o Review of receiving and Bechtel QC documentation.

o Surveillance inspection of work perfomed by Constructor /

4 Contractor (s). This inspection supplements the quality programs of the Constructor / Contractor (s) who have responsibility for their work and their quality verification.

Surveillance inspection includes either selected physical inspection at prescribed hold points and observation or witness of inspections perfomed by 4

the Constructor / Contractor (s):

o Reviewing quality control documentation.

I o

Reviewing Bechtel and/or Constructor / Contractor (s) quality l4 documentation.

i o

Providing technical direction to testing laboratories and inspection Contractors.

4 Revision 5 Page 3 of 10

r 7

O Reviewing supplier fynlity verification document packages for o

completeness and traceability to the item (s).

o Identifying quality problems, initiating action leading to solutions, and verifying implementation of solutions.

o Reviewing Constructor / Contractor (s) quality verification l4 documents, o

Reinspection of Constructor / Contractor (s) completed work may be l4 imposed as deemed necessary.

1.6.2 Project Engineering 3)

Prepare specifications for Supplier and Constructor /

5 Contractor (s) Quality Assurance Program.

5)

Review and approve the design changes and approve nonconfomance 5

dispositions.

6)

Miew drauir.gs, procedures, test data, manuals and reports submitted to Engineering by suppliers and Constructor /

5 Contractor (s).

8)

Provide support to Construction management relative to storage 5

and maintenance of pemanent plant equipment.

Li i

1.6.3 Project Construction Management A Manager of Construction is assigned to each nuclear plant project involving 4

construction or construction management assignment, and is responsible for the project field construction performance. The Manager of Construction is responsible for assuring that construction activities are performed in accordance with the design requirements as established by project engineering and other applicable requirements.

The project construction nanagement organization is shown in Figure 11.

l5 The Constructor / Contractor (s) are assigned first-level responsibility for the l4 control of the quality of their work. Their perfomance is coordinated and monitored by the Bechtel field organization. The Bechtel Quality Assurance organization performs documented audits and surveillances and has the capability to perfom surveillance inspection.

Ir. cases where the Constructor / Contractor (s) are responsible for quality l4 verification inspection or other quality assurance functions, the contract documents incorporate the requirements for the Constructor / Contractor (s) 4 quality assurance program. Constructor / Contractor (s) quality assurance and quality control personnel are required to have the appropriate authority, organizational freedom, and independence within their own organization.

Constructor / Contractor (s) progran requirements are specified by incorporation l4 of the requirements of Reg. Guide 1.28 (6/7/72) or the ASME Boiler and Pressuu Vessel Code,Section III, as appropriate.

In the event that the Constructor / Contractor (s) is unable to provide an acceptable program, Bechtal nay l4 assume quality verification inspection responsibilities or these nay be contracted to another organization.

Revision 5 Page 4 of 10 I

l l.6.4 Project Procurement The Project Procurement 11anager receives technical and administration direction from the i4anager, Division Procurement, LAPD through the llanager, Division 5

Procurement, Houston and project direction from the designee Project ilanager.

Section 3 - Design Control Page 30 - first paragraph:

In the case of proposed changes to the original design initiated at the constructia site, the design changes shall be reviewed, accepted and 5

documented by Bechtel Project Engineering. Acceptance of design changes by Bechtel Project Engineering is required prior to implementation. For design changes proposed by suppliers, acceptance of the design change by 4

Project Engineering is required prior to shipment of the item to the jobsite.

- third paragraph:

Certain other detail design work described below may be performed by Bechtel Engineering. This work is not subject to design verification or checking described above.

The nature and scope will vary with each Engineering discipline. Civil Engineering design affecting safety-related structures, systems, and components is limited to functions such as the design of form details for concrete placement and design of temporary supports for reinforcing and embedded steel.

Within Instrumentation and Electrical Engineering, theqe design functions include the preparation of isometric drawings of ele'ctrical conduit 5

and instrumentation tubing and the detailing and selection of hangers and supports. Within Piping Engineering, these design functions are normally limited to the preparation of isometric drawings and detailing of small (two-inch nominal and under) piping using sizes, material, routing and support criteria provided by Engineering specifications.

Sizing, separation, instrument location, support criteria and standard designs are developed by Bechtel Engineering within the program described above.

- fourth paragraph:

Suppliers are not allowed to change Bechtel design requirements or Bechtel reviewed supplier design documents without obtaining approval by Bechtel Project Engineering. Construction site changes to engineering design are documented by means of change notices or change requests which require authorization by Project Engineering.

Significant or unique changes are authorized individually; Project Engineering may give written authorization in the form of specifications or other instructions to field i

organizations to make routine changes. Field organizations have the 5

authority to approve changes to design details in cases where the original design details were prepared by that field organization.

I r

i j

Revision 5 Page 5 of 10 l

y

Section 4 - Procurement Document Control 4

Page 32 - paragraph 3, item 1) through iten. 8) Page 33:

Replace the paragraph beginning "...The following describes the sequence of steps..." with the following paragraph:

Appropriate project procedures provide details to accomplish the administrative actions in processing procurement documents in the design office and at the jobsite.

Section 5 - Instructions, Procedures, and Drawings Page 34 - sixth paragraph:

Field organizations prepare other procedures when dngineering docuaents l5 require amplification to perfora various discipline activities associated with fabrication, cleaning, erection, installation, test, repair, modification, etc., of items.

Section 6 - Document Control Page 35 - sixth paragraph:

Changes nade to approved design docuaents by Project Engineering or proposed by field organizations are reviewed and approved by Project l5 Engineering in accordance with established procedures which provide that changes are reviewed in the same aanner as the original issue.

Section 7 - Control of Purchased l13terial, Equipment & Services 4

Page 37 item number 2):

2)

Determination by Engineering and Quality Assurance that the supplier or Constructor / Contractor (s) quality program is capable of meeting the specified requireaants. This aay be based on evaluations by Procureaant Supplier Quality for nanufacturin jobsite Constructor / Contractor (s)g suppliers or Quality Assurance for

, and field procurements.

Section 14 - Inspection, Test, and Operating Status Page 50 - fourth paragraph:

Project Engineering and supervisory personnel are authorized to apply l5 and reaove identifying tags, markings, and labels on equipment in accordance with approved procedures.

Quality Control personnel are

.I 5 the only ones authorized to direct application and renoval of inspection status indicators. Bechtel, in cooperation with the plant owners' operating personnel, establishes a tagging procedure which delineates those authorized for applying and removing tags during preoperational testing phases.

Revision 5 Page 6 of 10

r 1

0 Section 15 - Nonconforming Items Page 51 - paragraph 2 items 2, 3 and 5):

5

- paragraph 2 item 4 - Delete 2)

Determine interim disposition by field organizations.

3)

Have Project Engineering approve dispositions.

5)

Provide conditional release of nonconforming items upon approval of 4

Quality Assurance.

- last paragraph:

The authority for disposition of nonconforming items follows the rules 5

for approval of design changes described in Section 3 of this report.

Quality Assurance reviews dispositions to determine that they are fully responsive to the conditions described in the nonconformance report.

Quality Control is responsible for verification of rework and repair dispositions, applying inspection processes at least equivalent to that applied to the original work.

" Repair" or "use as is" dispositions on nonconformances to procurement requirements at a supplier's plant must be approved by Project Engineering.

Page 52 - second paragraph:

Nonconforming items discovered at final inspection which cannot be 4

corrected by rework or completion of originally prescribed processing are required to be identified, tagged, and/or segregated.

Discrepancies in work not yet submitted for final inspection which can be corrected by rework or completion of work processes are not considered to be nonconformances.

For construction work performed by Bechtel, no further work can proceed on the nonconforming item until an approved disposition is implemented, unless a conditional release is approved by Quality Assurance.

Suppliers, and Constructor / Contractor (s), as required by procurement documents, apply similar procedures involving their quality assurance functions. Bechtel Procurement Supplier Quality Representatives are instructed to withhold release for shipment until all nonconformances have been resolved or an interim disposition is approved by Project i

Engineering.

l Revision 5 Page 7 of 10

The following is a modification of Aloendix "A" of the topical which describes Bechtel's position on Regulatory Guit.e aad ANSI standards:

l o

Reg. Guide 1.58 Rev. O, 8/73 Plus positions C.5, C.6, C.7, ANSI N45.2.6,1973 C.8, and C.10 of Rev. 1 o

Reg. Guide 1.144 Rev.1, 9/80 a

ANSI H45.2.12,1977 Exception listed below o

Reg. Guide 1.146 hev. O, 8/3d ANSI N45.2.23,1978 Full Compliance - No exceptions 1

Exc'eption ANSI N45.2.12-1977, Section 4.5.1 states, "The audited organization shall 4

provide a follow-up report stating the corrective action taken and the date corrective action was completed." This implies that the audited organization must provide the auditing organization with written notification detailing what corrective action was taken and when the corrective action was completed.

In actual practice, the audited organization will provide the auditing organization with documented corrective action including the date when the corrective action will be completed. The auditing organization will evaluate the corrective action response to determine if corrective action verification is necessary.

If verification is necessary, the corrective action verification will be performed after the scheduled completion date and the result of the verification will be documented.

i i

l i

Revision 5 l

Page 8 of 10

l Attacluent A is a modified Table I to the topical which describes Bechtel's Quality Program Documents.

j i

i 1

6 i

i 1

I i

Revision 5 Page 9 of 10

P O

%II I

a I

o 3

12>

I 5"

ri w.

5.I "1;_:-

N E

t"

==

4 g 0

IU" c.E s 3 :8 a a

$e

." l

  • n

. Big W>

o.

wt.

EES 3%El 44 y =.3 W E

=

W

=

EMO EU 55:h I

eat i

g i

t c.:

cEl:

i i

l ta=t

{

ta

=Eh.

U

=

b-I ME Z

l En W

a I

03b I

5."v!

h.

m o<

i t

O<*

5 c2g I

"55 f3I o

z g

4

a. < 0 2-1
  • e "o

9:

8 N

XH g,0 I

WO I

5.

w

u. e>ra oa eOZ og Y

c.

yp4 3,2 He E5:$

55 D C. U "5

C 3 a:

MO In

-a 2

ag

==

5 O

u I

a E.4 I

8 E"

~3 US 5 E*

n =f *,

2*

a t*n U

n.

a U

e s

f.N 9

3ra1s m>g i

U$.N

)

Y En:

322

==$$

ma

$ 2 *'$

es E

," V 3

W.e

. 3.-

3 e

-1

" K.

g*

1s e

.a. 3 3 :

..~

ee

+ o.

Attachment A BECHTEt, CUALITY PROGRAM COCUMENT3 O RIGIN Afl10 REvitW FOR 44 POLICY AUTHO Rl2143 00CtlMt4f Auf MO RITY A90P90CnAtemt0Ulpt'elTf1 A M OVAL C0if f *f f t 4

  • BICNitt QUAlffY MANAGin GA tPC" PRittotif A40 POLittti AND PROC 10URIt FOR A13UR A4CE MANUAL.

C&$iRAE Olvl3104 APPROPRIAT4 OVER ALL t!CMTIL PaoGR44 Atut 4WCLIAR QUAttTY A13URANCE AufMORilloC006 APPtiCAlt! TO AS AlvroAt COMPO N E NTS IIQAnb MANACIA (1571Cfl0N AGt'dCY fl4 A5Mt ill)

QUAttfY PROJECT N/A DIVitIO1 PRCCt0VR13 f 01Co*10VCil'63 4

ASSURANCI QUAlff Y A03URANCI QUAllfY ASSUAANCE PROJECT DUAlif Y AiluRANCE PROCLCURt3 MAltAGER MtiACER ACfiVifit$

4 4

E NCINt E nig g 015:094f10 OIVlil010U ntif f M AN ACIR Civill0's 01fliffl0107 4t!P0%fitillfitt OIPARTMINT 140lV10 U ALS ASSURANCE MANAGtft* (NGimt ERING" A'do PROCICURt3 f 0R DEIJ31 PROCEDURtsAND Ot:131 RIVitYt. A'40 OcClutif INSTRUCTIO41 C0if ROL 11 THE tiliit t RiiG OtPARfutNf3 l4 PROCURtutif 444UALS PROCURtuffsf CA 8PC" CCCitfAlf P40Ct00Rit701MO*AtofflCtAi3 (OU AttfY PROGR AM PROCURtralNT fitt0 PR'JCUntutif itCttaw f 0 RELAftDI MANAGIR3 70Lt04 fP0 00Atl1Y P3ttCY

  • PROCURtut47 MANAGER QA 4PC" M 4'f A$t R PROCuttI4147 $UPPtit 4

$UPFtttR OUALITY PROCURtutNT PROCURauf hf luPPLitR QU Atif Y PROClouRt s htA4W A L

$UPPLit4 OUALITy QUALIFY MARS PROC 10URt A40 M AN AG E R 4% Q3 GA 8PC" MANAGtR QQ3 POLttit1 Ai3 PRCCt0VRil P*9 P0tlCY CUlot310U All!Y Pt R704'Ali3 FA6CS P 49Cfia%8 PROGRAM Rit ATICI 1ICMetCAL $UPPORf PRO-itCHNICALSERyttil olvis104 CA M AN ACIR M AN A glr TIChitC AL Rt170italitiff tl A40 H0ClSumit 4

CIOURES MAhu AL SERVICIS FCR PRollCT SUPPORf GA0bP1 l4 PROJt ti M A 4U A tt COGNt2A47 POAt C049ftA4f 40f t !

PR0ct 0Unis tou Atif f PROJECT f t AM MANAttR3 PROGRAMRELAft0)

MtMatR

'AVAltAtti 01 Rf oulti10 APPROPtAf f RtCUL ATORY AGthCitt 20ftt: 1 Rivitioit 70 7H858 C0CUwlif f Rt0V144 Tht SAuf AtVite

'19CLU0tt Rivits ty Otvitt09 QU4 tiff At3URA4CI'aA4ACIR$

AND APPROVAL At IME ORI?t% AL.

'" art A Of flCIICP1 art Rtvilato A40 APPROVt3 tY TMt ARE A 2 TMIRI A At PPOVill0il FOR P40 JECT UWaul M00tfiC4f6343 Of fitt GUAlllY At3URA4Cl MAR AGIR Ato ARE A Of flCt 10 tnt A30V8 00CuWiillTO Ottigt Att $PIClflC Pn0JICT M A4 ACIR Of I4419t t R196. TMitt (OPS SM ALL st Stmi RIQUIRIMt4f18UT 10f Of P4RT pa0M iut P40ca4y 70 01Vis104 00AlffY ASSURAitt st Af f 70R P0tf AtaulRtutif s 07 TMet RIP 0Af Atvita agg AP*40 Vat APPROYAL RtVitW.

AufMOAi!Y f 0ft strCM M00lflCat:043 A94 Of f 6910 ellut1 IHt COVE RH10 PROCT 0UREL Page 1 of 1 Revision 5 w

PART C i

E8 ASCO SERVICES,1NCORPORATED QUAllTY ASSURANCE PROGRAM DESCRITION i

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION i

l i

REVISION 6

DATE November 1, 1933 i

l

l'

,/

r, e

M 1

6109 6 IST A 90.02 P & G t, _. _ O F

'tsAsco senvices NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL stCTION INcompomatto HOUSTON LIGHTING AND POWtR COMPANY SOUTH TEXA5 PROJECT

{

ELtCTRIC GENERATING STATION UNITS s & 2 5

/MM-e TABLE OF CONTENTS 5-20-83

........., 7,,t, oarg v

PART I - Cencral Section Title Rev. No.

Date QA-I-1 Quality Assurance Program 4

5-20-83 l

QA-I-2 Organization and Responsibilities 4

5-20-83 I

QA-I-3 Personnel Indoctrination and Training Program in Quality Assurance 2

11-19-82 QA-I-4 Deleted (not applicabic)

QA-I-5 Quality Assurance 1' valuation of Suppliers / Contractors 2

11-19-82 QA-I-6 Quality Assurance Records 2

11-19-82 PART II - Enginecting Offices Deleted (not applicabic)

PART III - Construction Site Section Title Rev. No.

Date QA-III-1 Instructions, Procedures, and Drawings 2

11-19-82

+

QA-III-2 Document Control 2

11-19-82 QA-III-3 Procurement Document Control 1

$-4-82 QA-III-4 Construction Site Procurements 2

11-19-82 QA-III-5 Supplier / Contractor Surveillance 1

5-4-82 QA-III-6 Nonconformances 2

11-19-82 QA-III-7 Correctivn Action 2

11-19-82 OA-III-H Control of Special Proconsen 3

12-13-82 QA-III-9 Quality Agnurance Audits 3

2-22-81

t v.;

^

p a c t _.2 2

sios.o isen e.e:

_ or

'Es Asco stRvicts HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECT 10N INCompORAta0 HOUlTON LIGHTING AND P0n[N COMPANY SOUTH TEXA5 PROJECT i

ELtcTRic GENERATING $TATION UNIT 5 I a 2 5

g a a visio

t. ((md TABLE OF CONTENTS cata _ 5-20-83

............pf.............

v PART III - Construction Site (Cont'd)

Section Title Rev. No.

Date QA-III-10 Identification and Control of Items 1

5-4-82 QA-III-11 Inspection 3

2-22-83 QA-III-12 Teat Control 2

2-22-83 QA-III-13 Control of Measuring and Testing Equipment 2

11-19-82 QA-III-14 Control of Receiving, Handling, and Storage 3

2-22-83 QA-III-1$

Inspection, Test, and Operating Status 1

5-4-82 Appendix I Terms and Definitions 1

5-4-82 Appendix II Ebasco Exceptions to US Nuclent Regulatory Guides and ANSI Standards Indicated in Section QA-I-1 2

2-22-83

t 6109.6 it?Pi to.e2 Do r.t

._ o r

'ta Asco stRvices HUCLEAR QUALITY A$$URANCE PROGRAM MANUAL StcTION

'NCo"8'oRafto HOUSTON UGHTING AND PontR COMPANY QA-I-I

$0UTH TEXA$ PROJECT i

EttcTRic cthtRATING STAfl0N UNITS 1 & 2 4

m t ys te o.e

_s6 / W QUALITY ASSURANCE PROGRAM 5-20-83 cage

.............cf......... u 1.0 SCOPE The purpose of this section is to describe the Quality Assurance Program of Ebasco Services Incorporated and its applicab!!1ty to safety-related activities and services performed by Ebanco in the construction of South Texas Project. This program has been designed to meet the applicable requirements of the United States Nuclear Regulatory Commission 18 Quality Assurance Criteria of 10CFR50, Appendix B.

I* has also been designed to meet the regulatory position of the following US NRC Regulatory Guides and ANSI Standards, with exceptions and clarifications as stated in Appendix II of this Manual Standard Titic ANSI N45.2-1971 quality Assurance Program R.C. 1.28 (Rev. O, 6/72)

Requirements for Nuclear Power Plants ANSI N45.2.1-1973 Cleaning of Fluid Systens and R.C.1.37 (Rev. O, 3/73)

Associated Components During (See Appendix II Notes 3 through 5)

Construction Phase of Nuclear Power Planto ANSI N45.2.2-1972 Packaging, Shipping, Receiving, R.C.1.38 (Rev. O, 3/73)

Storago, and llanoling of items (See Appendix II Notes 6 through 11) for Nu:Isar Power Plants (During the Construction Phase)

ANSI N45.2.3-1973 Itounckeeping During the R.C. 1.39 (Rev. O, 3/73) construction Phase of Nuclear (See Appendix II Notes 12 and 13)

Power Plants ANSI N45.2.4-1972 Innta11ation, Inspection, and R.C. 1.30 (Rev. O, 8/72)

Testing Requiremento for (See Appendix II Notes 14 and 15)

Inntrumentation and Electric Equipment During the Construction of Nuclear Power Cencrating Stations ANS! N45.2.5-1974 Supplementary Quality Annurance (See Appendix 11 Noten I and 2)

Requirements for Inntallation, Innpcetion, and Tenting of Structural Concrete and Structural Steel Duritig the Construction Phase of Nuclear Ptswer Planta

L s

Poo t..a_ o r 20 61 Do.4 ist Pi 10.e3 ESASCO SERVICE $

NUCLEAR QUALITY AS$URANCE PROGRAM MANUAL s t C Ti0,4 l

esecompon A t t o NOWSTON LIGHTING AND PoetR C0teraNY QA-I-1 SOUTH TEXA5 PROJECT

{

ELECTRIC GENERATING STATION UNITS 1 & 2 4

_M.....,.A-*7,.,.>...........

5-2043

..,p.f QUALITY ASSURANCE PROGRAM oats v

}

Standard Title

(

ANSI N45.2.6-1973 Qualifications of Inspection, R.G. 1.58 (Rev. O. 8/73)

Examination, and Testing Plus Positions C.5, C.6, C.7, Personnel for the Construction C.8, and c.10 of Rev. 1 Phase of Nuclear Power Plants l

ANSI N45.2.8-1975 Supplementary Quality Assurance R.G.1.116 (6/76)

Requirements for Installation, j

(See Appendix II Notes 16 through 18)

Inspection, and Testing of l

Mechanical Equipment and Systems

[

for the Construction Phase of i

Nuclear Power Plants

)

ANSI N45.2.9-1974 Requirements for Collection, StoraEc,

[

R.G. 1.88 (Rev. 2, 10/76) and Haintenance of Quality Assurance (See Appendix II Notes 19 through 21)

Records for Nuclear Power Plants l

ANSI N45.2.10-19/3 Quality Assurance Terms and R.C. 1.74 (Rev. O, 2/74)

Definitions ANSI N45.2.12-19/7 Requirements for Auditing of Quality R.G. 1.144 (Rev. 1, 9/80)

Assuranco Programs for Nuclear Power (See Appendix 11 Note 27)

Plants l R4 l

ANSI N45.2.13-1976 Quality Assurance Requirements for R.C. 1.123 (10/76)

Control of Procurement of items and i

(See Appendix II Notes 22 through 26)

Services for Nucle.ir Power Plants ANSI N45.2.23-1978 Oualification of Quality Assurance R.C. 1.146 (Rev. O, 8/80)

Program Audit Personnel for Nuclear i

Power Plants

[

Table 1-1.1 provides a matrix which shows the sections of the Ebasbo Nuclear Quality Assurance Progran Manual that correspond to the requirements of t

10CFR50, Appendix B and US NRC Regulatory cuide 1.28. Rev. O.

The Ebasco j

Quality Assurance Program is comprised of: The Ebasco Nuc1 car Quality l

Assurance program Manual, written corporate policies, procedures, departmental i

instructions, and drawings related to quality. Tablo 1-1.2 provides a matrix f

of the principal implementing procedures with 10CFR50, Appendix n.

Tablo I-1.3 is a listing of these procedures by title. The principal pg impicmenting proceduren are not necessarily limited to those indicated in the matrix.

Implementing procedurce will be issued for South Texas Pro, Ject uto as the need for apcelfic proecdurcs arisca due to the expanding neupe of Ebanco safety-related activitics, f

6..

O 6t os.s istm,o.es e a r.t

_._.0, EsAsco stRvicts HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL Stcil0N o.compomatto HOUlTON LIGNTING AND PoetM COMPANY QA-I-l SOUTH TEXA5 PROJECT I

tLECTRIC GENtnATING STATION UNITS 1 & 2 4

g an n o

i. _jd@w _v e QUALITY ASSURANCE PROGRAM can

$-20-83

.............,7.............

The Ebasco Nuclear Quality Assurance Program Manuni han been designed to meet the requirements of 10CFR50.34 (7) for n quality nanurance program description.

It will be incorporated into applienble portionn of safety analysis reports by reference as provided by 10CFR50.32.

The Ebasco Quality Program for the South Texas Project is in force at the Ebasco Engineering Offlee and Constructinn Operations. The Ebanco Engineering Office is an organized unit where engineering, procurement, and reinted functions are performed. Construction Operations encompass thone activition reinted to the construction of a nuclear power station. Ebanco's responsibility for imp 1tmenting the Ebanco Quality Program shall begin at the commencement of activitten affecting quality and shall end with tho turnover of completed systems to the Client.

Definitions pertaining to the Ebonco Quality Program are listed in Appendix !

of thin Manual.

2.0 QUALITY ASSURANCE ENGINEERING 2.1 The Ebanco Quality Assurance Engineering Department is responsible for catablishing new, and updating existing, quality aneurance requirements.

In addition, this department in responsible to administer and enforce the implementation of the Ebnaco Quality Annurance Manual.

3.0 OUA!. TTY PROGRAM COMMITTFE 3.1 The thanco Quality Program Committee in responsible for and has authority to make and approve procedures for any changen to this Manual.

Thin comnittee is comprised of representativen of the Materints Engineering and Quality Assurance, Engineering, Construction Projceta, R4 Purchasing, Connutting Engineering, Advanced Technology, and Plant Operations and Betterment Departmentng and of Envirosphere Company.

These representatlVes are appointed by the Vice PrcNident of thu respective department.

R4 The Vice President Materints Engineering and Quality Annurance in designated by the Executive Vlec Pronident Operat ions as the Chairman of the Quality Program Committcc. A member of Quality Annurance Engineering Department nhall be designated by the Chairman an Quality I'rogram Coordinator, who nhall function as the Quality Program Committec'n secretary and be a member of the Committee.

U The Chief Quality Assurance Engineer la deninneted by the Vice Prentdent Materials Engincoring and Quality Annurance as a permanent reprencntative of the Materials Engineering and Quality Anwurance Department on the Qualit y Pror.rnm Commit t ee.

The Conmittco nhall be responsib!c for and shall have authority to make any changen to the policien and proccituren of the Ebaco Quality Program.

4 20 l

sios.s inica io.e ecot w

'tB ASCO SERVICES HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL 5t C T10H ine c om po m a t t o HoulTON UCHTING AND PontR COMPApeY QA-I-1

$0UTH TEXA5 PROJECT tLtCTRIC CtNtRATING STATION UNIT 11 & 2 4

=

a t vi v os.

!.g/..M....M d 5-20-83 QUALITY ASSURANCE PROGRAM oat:

....,.p.............

=

V All changes or revisions to the Ebasco Quality Program shall be processed through the Quality Program Committee by the Quality Program Coordinator.

3.2 Ebasco Quality Program Procedures document the various significant activities of the Quality Program that are the direct responsibility of the Quality Program Committee or the Quality Program Coordinator. These procedures include but are not limited to the followings l R4 3.2.1 Quality Program Procedure No. 4 entitled, QUALITY PROGRAM COORDINATOR - DESCRIPTION OF POSITION, DUTIES, RESPONSIBILITIES.

l 3.2.2 Quality Program Procedure No. $ entitled, DEVIATING EBASCO PROJECT-RELATED QUALITY ASSURANCE PROGRAMS FROM Tile EBASCO NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL. This providen for control of such deviations by requirinR execution of an authorization form involving approval of specified authorities to assure, among other things, that safety and/or quality will not be sacrificed.

3.2.3 Quality Program Procedure No. 6 entitled, ASSIGNMENT, DISTRIBUTION AND CONTROL OF Tile EBASCO NUCLEAR Ql'ALITY ASSURANCE PROGRAM MANUAL.

i 3.2.4 Quality Program Procedure No. 7 entitled REVISIONS TO Tile i

EBASCO NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL.

l l

4.0 CENERAL 4.1 Section QA-I-2 of this Manual describes the organizational structure, functional responalbilities, levels of authority, and lines of internal and external communication for management, direction, and execution of the Ebasco Quality Annurance Program.

By the Statement of Authority at the front of this Manual, Ebasco's President mandaten the Ra company-wide uso of this Manual and its nuProrting documents which make up j

the Ebanco Quality Program.

4.2 It shall be the renponnibility of each Ebanco department and the individual pernonnel of that department to adhere to the requirements of l

thin Program.

Section QA-I!!-l of thin Manual requires theme departments l

to develop and control instructionn, proceduren, and/or drawings which describe the manner in which activities af fceting quality are to be accomplished. When documented evidence in required for the natisfactory performance of these activitics, checklintn, formn, and/or other i

appropriate means shall provide thin evidence.

The documents which contain the procedurun listed in Table 1-1.3 and are uned to irclement the thanco QA Program are:

4.2.1 Quality Anourance Engineering Department - Quality Anurance Proceduron Manual L

4 5

20 sico.stsT m m.e2 PME o,

'EBASCO SERVICES NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION INCoRPoRATEo HOU$TCN UGHTING AND POWER COMPANY QA-I-I SOUTH TEXA5 PROJECT N

ELECTRIC GENERATING STATION UNITS 1 & 2 4

g wa vision k /M/WP QUALITY ASSURANCE PROGRAM oATE 5-20-83 c.v om.,, app.n s.smu n 4.2.2 Quality Assurance Engineering Department - Site Quality Assurance Procedures Manual 4.2.3 Company Procedures Manual - Quality Program R4 4.2.4 Company Procedures Manual - Nuclear 4.2.5 Vendor Quality Assurance Department - Vendor Quality Assurance Department Procedures Manual 4.2.6 Site Quality Assurance Engineering Department - Quality Control Procedures Manual 4.2.7 Site Quality Assurance Engineering Department - Site Quality Assurance Instructions Manual 4.2.8 Site Construction Department Procedures Manual -

Administrative Site Procedures 4.2.9 Site Construction Department Procedures Manual -

Construction Site Procedures The above-listed manuals may also contain departmental working procedures which do not describe activities affecting quality and therefore are not governed by the requirements of this Manual. Furthermore, certain implementing procedures may require changes in order to suit unique client requirements; such procedures for a_ specific project will be included in a project manual of procedures and/or a site manual.

In this case, the changed procedure shall be designated a Project Procedure.

These procedures will be subject to controls similar to those applicable to the original documents.

4.3 In addition to the requirements of Section QA-III-l of this Manual and Paragraph 4.2 above, Section QA-III-8 of this Manual further assures control over quality-related activities by requiring that special processes shall be performed in accordance with written qualified procedures, and that they shall be performed only by qualified personnel. All qualifications shall be in accordance with applicable codes, stJndards, specifications, and other requirements as applicable.

The Ebasco Quality Program provides for the verification of quality requirements through written policies, procedures, and instructions for the performance of inspections and tests. These inspections and tests are performed on Ebasco purchased items and services as well as on services supplied by Ebasco. All inspections shall be performed by individuals other than those who performed the activity.

~4.4 In order to extend the control cf activities affecting quality to the supplier level, suppliers of Ebasco purchased items and services 3

~

6,, 20 sics.s istm m.e2 Pace

'EBASCO SERVICE 5 NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION tNCORPoRATED HOU$ TON LIGHTING AND POWER COMPANY QA-I-l SOUTH TEXA5 PROJECT N

ELECTRIC GENERATING STATION UNITS 1 & 2 4

g ac visios

.d/h k

/

QUALITY ASSURANCE PROGRAM carc 5-20-83

....m...f..... n..... u.

shall be evaluated with respect to quality assurance capability in accordance with the requirements of Section QA-I-5 of this Manual.

Section QA-I-5 requires Ebascc suppliers to have in effect quality programs that meet the requirements of 10CFR50 Appendix B and ANSI N45.2 that are applicable to the items and services being purchased.

Items and services shall not be purchased from suppliers that do not meet the applicabic requirements of Section QA-I-5.

In addition to the initial quality assurance evaluation of suppliers, the Ebasco Quality Program provides for the in process surveillance of items 4

in the supplier's shops. This surveillance program is described in Section QA-III-5 of this Manual.

5.0 INDOCTRINATION AND TRAINING Section QA-I-3 of this Manual provides for the company-wide indoctrination and training of Ebasco personnel engaged in activities subject to the requirements of the Ebasco Quality Assurance Program.

The objectives of the training program are to familiarize applicable R4 Ebasco personnel with this Quality Assurance Program, herein defined as the Ebasco Topical Report ETR-1001 and the implementing procedures identified in Table I-1.3.

Overall responsibility for training as delineated in QA-I-3 rests with the Quality Assurance Engineering Department.

6.0 REVIEW OF QUALITY PROGRAM ADEQUACY 6.1 The adequacy of the Ebasco Quality Program is reviewed on a regular basis. The determination of program adequacy is based on audit results and trend analyses. Section QA-III-9 of this Manual provides for the performance and follow-up of audits by Quality Assurance Engineering and of audits of the Materials Engineering and Quality Assurance functions.

6.2 Audits performed by Quality Assurance Engineering are designed to evaluate the Quality Program effectiveness on a project basis. When corrective action is necessary, re-audits are scheduled to assure implementation of corrective action.

6.3 Information on audits performed by Quality Assurance Engineering shall be submitted to the Quality Assurance Engineering Internal Audit Supervisor.

He shall make an analysis of the available quality data with R4 respect to quality trends and report the result at least semi-annually to the appropriate executive level of management for review and assessment in accordance with Quality Assurance Engineering Procedure QA-D.3.

The Vice President of Materials Engineering and Quality Assurance shall be responsible for initiating the implementation of any changes or corrective action deemed necessary to improve the effectiveness of the Ebasco Quality Assurance Program.

(

.,-c

-, - --~,, -

. e m r-

.w---

,,.-r..-

7---

<~f r--

.ei,-a

sico.s urpi to.e3 pact or EBASCO SERVICE 5 HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL S E CT10H INCORPORATc0 HOU5 TON LIGHTING AND POWER COMPANY QA-I-1 SOUTH TEXA5 PROJECT I

ELECTRIC GENERATING STATION UNITS 1 & 2 4

g Re visiew k

8 / A m..........

5-20-83 QUALITY ASSURANCE PROGRAM care 4.............y TABLE I-1.1 MATRIX OF COMPLIANCE TO US NRC 10CFR50 APPENDIX B AND ANSI N45.2 10CFR50 ANSI N45.2 Ebasco Nuclear Quality Appendix B Criteria Paragraph Assurance Program Manual Section 1

3 QA-I-2 II 2

QA-I-1, QA-I-3 IV 5

QA-III-3 V

6 QA-III-l VI 7

QA-III-2 VII 8

QA-I-5, QA-III-2, QA-III-4 VIII 9

QA-III-10 IX 10 QA-III-8 X

11 QA-III-5, QA-III-ll XI 12 QA-III-12 XII 13 QA-III-13 XIII 14 QA-III-14 XIV 15 QA-III-15 XV.

16 QA-III-6

. XVI 17 QA-III-7 XVII 18 QA-I-6 XVIII-19-QA-III-9

.--r.

g e

-'9, y

-4'y p-

'"--T-"-"

9"--

N 8-

u 4&

F 1'rW-'"YP T'*-T-*wW 7=TeT+

-et""

-9 w

v

'*7

v.

1

,' y (Oy y*,

i ' '

e p

t e-APPROVAL TARif I-l.2 MATRlt OF Cr>MrLIANCE OF h)

PRINCIPAL 1MPLFMFNT!hC PROCFl*nt:5 7010CFR50 APPFNDlI B.

8 b g

M

-8'..

f..-

e g

z ia n>

"l h

c O$

I p-9,ettty

(,%e11t y Quellty Vendar Q et sty

  • Queltty b

i mO b

l.

Nuclear Contret

, Assurance Assurance Const ruction Dept. Procedures Assurance Deat.

Progres 1

j' Crl-(N.)

Procedures Instructione (QA-)

(VQADr),

(QP-)

t sE terson Procedures (Qfr-)

(QAl-)

Proc edu rea (ASP-)

( CSP-)

(CHI-)

Procedures Proc edures Y

. p.10 I

4 HI Er N

i

-21

-1.1

-003

-2 a

0 "n' e

II

-2.1,-2.2

-C 0 3.-012.-017,-018

-C.3.-5.1.-5.23

-14,-34

-4 through -7

.f

,s s'

IV

-009

-D.I.-D.2,-P.6

-3 l

V

-23

-6.1 -6. 3

-005

-C.I.-C.2,-P.1,

-1,-7,

-1 through y

-S.23

-11.-12

-100 (en I

applicable)

C O

VI

-6.2

-002

-C.I,-C.2 -S.3.-S.9

-6 p

h K

y Q. g.g. @m VII

- P. I.-P. 5,- P. 9,

-3

-4 through -15 og 3

-5.10

-17.-18.-19 2

y t*

5 V* o >

V111

-14.1

-5,-32

-14.-25-38, M

Oz

~39 H

O C r-K

$H CQ II

-9.1 through

-014 -015

-P.I.-P.7,-P.12

-81 through

  • >=

Z

-9.5

-S.15 through -5.20

-95 M

>Hd>

w amx mw o

c p

I

  • -2,1.-10.1

-C. 3.1,- P. 5, - P.12 F,

yy%

2 through -13.3 C

, ut 2's

+

(se opplicable) f'

-t O 1

> 3 *U O tr3 dmOEA II

-11.1

-P.1.-P.5

-5,- 17. -32

+

N s.- r,i U

en"h

' 3'4 -94 o

att

-12.1

-015

-S.8 a

sao Ill!

-10.22 -13.1,

-P.1,-5.5,-5.6

-4,-5,

-37,-60

. -4 3: m "o D

-13.2,-13.3

-82 through-65 z

Ilv

-14.1

-P.1,-P 5

-O 8"

u XV

- 15.1.-15. 2,

-004

-P. 3.-s. 7

-15,-33 c

-15.3 I~

s IV!

-16.1

-007.-C08 -011

-D. 3.-P. 3.-S.7

-16 xvtl

-17.1

-010,-016,-019

-D. 5,-C. 3. -C. 4,

-8' S

-P. 9,- P.12,- S. 4,

4 O

1

-$ I t t

-4 O

O 6

g Z

IVIII

-24

-003,-006.-013

-D.4,-D.5.-D.5.1, u

co o

-17.5.2 -C.3.-P.9,

-S.1 through -S.23 e

I

( e s r e'r t *S.7)

Y.

o, p

CO i

La M

O U1

9 20 sico.2 isv pi io.e3 pacc or EBA$CO SERVICES HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL

$LCTION INCORPORATED HOU1 TON LIGHTING AND POWER COMPANY QA-I-l SOUTH TEXAS PROJECT d

ELECTRIC GENERATING STATION UNIT 51 & 2 4

g na vision

[,dT%/

QUALITY ASSURANCE PROGRAM 5-20-83 oave c.

.m.,, vj...........

TABLE I-1.3 PRINCIPAL IMPLEMENTING PROCEDURES Procedure No.

Title N-21 Nuclear Quality Program Authorization and Implementation R4 N-23 Reporting a Defect / Noncompliance to the NRC N-24 Ebasco Management Quality Assurance Audit Committee QA-G.1 Preparation and Control of Quality Assurance Engineering Department Procedures QA-G.2 Control and Distribution of Project-Related Manuals QA-G.3 Qualification of QA Audit Personnel QA-G.3.1 Qualification of Inspection, Examination and Testing Personnel QA-C.4_

Quality Assurance Engineering Records

.QA-D.1 Review of Safety-Related Component Specifications QA-D.2 Review of Engineering Drawings QA-D.3 Determination and Analysis of Quality Trends QA-D.4

' Resolution of External Audit Findings QA-D.5 Internal Audits QA-D.5.1 Internal Auditing of Vendor Quality Assurance Representatives QA-D.5.2 Site Audit Procedure QA-P.1 Review of Vendor's Procedures QA-P.3 Review of Nonconformances

sico.e istP to.e3 POGr OF

'EB ASCO SERVICES NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION INCORPORATro HOUSTON LIGHTING AND POWER COMPANY QA-I-l SOUTH TEXAS FROJECT N

ELECTRIC GENERATING STATION UNITS 1 & 2 4

g arvision

k.. M...' [.. M - %,.............

5-20-83 QUALITY ASSURANCE PROGRAM carc v

Procedure No.

Title QA-P.5 Requirements for Preparation, Implementation and Control of QA Plans R4 QA-P 6 Evaluation of Bid Exceptions QA-P.7 Review of Nondestructive Examination (NDE)

Procedures QA-P.9 Quality Assurance Vendor Evaluations QA-P.12 Procedure for Review of Radiographic Film Submittals QA-S-1 Planning of Site Quality Assurance Engineering Activities QA-S-2 General Audit Procedure QA-S-3 Processing of Quality Assurance Engineering Audit Reports QA-S-4 Quality Assurance Records Audit QA-S-5 Material Receipt Audit QA-S-6 Material and Component Storage Audit l

QA-S-7 Processing Nonconformance Reports QA-S-8 Calibration and Cage Control Audit QA-S-9 Document Control Audit QA-S-10 Vendor Documentation Audit QA-S-Il System Turnover Audit QA-S-12 Civil Activities Audit QA-S-13 Structural Steel Audit QA-S-14 Reinforcing Steel Audit I

11 20 stos s tsvei io.sz Pact or

' EBASCO SERVICES HUCLEAR QUAllTY ASSURANCE PROGRAM MANUAL SECTION suconpoRATED HOU$ TON LIGHTING AND power COMPANY QA-I-l SOUTH TEXA5 PROJECT j

ELECTRIC GENERATING $TATION UNITS 1 & 2 4

as. vision 5-20-83 N

QUALITY ASSURANCE PROGRAM oart

~

v 1

Procedure No.

Title QA-S-15 Protective Coating Audit R4 QA-S-16 Welding Material Control Audit QA-S-17 Welding Qualification Audit QA-S-18 Mechanical and Welding Activities Audit J

QA-S-19 Nondestructive Examination Audit QA-S-20 Radiographic Review Audit QA-S-21 Electrical Activities Audit QA-S-22 Instrumentation Activities Audit QA-S-23 Quality Assurance Instructions QP-4 Quality Program Coordinator - Description of Position, Duties, Responsibilities QP-5 Deviating Ebasco Project-Related Quality Assurance Programs from the Ebasco Nuclear Quality Assurance Program Manual QP-6 Assignment, Distribution and Control of the Ebasco Nuclear Quality Assurance Program Manual QP-7 Revisions to the Ebasco Nuclear Quality l

Assurance Program Manual VQAD-1 Assignment of Purchase Orders / Contracts and Sub-Orders / Contracts for Examination of Safety Related items VQAD-2 Assignment of Purchase Orders / Contracts and Sub-Orders for Examination of Non-Safety Related and Fossil Fuel Plant Items VQAD-3 Requirements for Processing and Implementation of Quality Assurance Plan 4

f 9

K.

' i i o9.6 (ST P) 10.83 POGE OF EBASCO SERVICES HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION INCORPORATED HOU5 TON LIGHTING AND POWER COMPANY QA-I-l SOUTH TEXAS PROJECT N

ELECTRIC GENERATING STATION UNITS 1 & 2 4

R E VI SIO N dN QUALITY ASSURANCE PROGRAM care 5-20-83

............f...............

Procedure No.

Title VQAD-4 Use of Form 719-QA-W " Quality Assurance Report" R4 VQAD-5 Setting-Up and Maintaining Purchase Order Files VQAD-6 Processing Quality Assurance Non-Conformance Reports (Form 6009-11) [ Follow-Up of Non-Conformance and Review of Vendor Rework Records)

VQAD-7 Use of " Problems that Require Resolution" Form VQAD-8 Preparation and Control of Vendor Quality Assurance Report Release for Shipment Form

[ Form 1305]

VQAD-9 Review and Processing Quality Assurance Reports Form 719-QA-W VQAD-10 Preparation and Control of Implementing Procedures VQAD-ll Review of Radiographs by Vendor Quality Assurance Representative VQAD-12 Notification of Material Shipped Without Release VQAD-13 Review of Vendor Documentation VQAD-14 Notification of Rejection (s) to Vendor VQAD-15 Setting-Up and Maintaining Purchase Order Files in New York Office VQAD-17 Interface between Vendor Quality Assurance and Quality Assurance Engineering Departments VQAD-18 Interface between Vendor Quality Assurance and Materials Application Departments VQAD-19 Qualification of Inspection, Examination and Testing Personnel for Nuclear Facilities N.g- -P r a M %n y We+ w yaui#tw

~_

, eNee d *

  • e-,

we=*=-eis. * - < = =

t,tci.6(sTel13.82 Pact or

'EB ASCO SERVICE 5 HUCLEAR QUALITY A55URAt1CE PROGRAM MJJ1UAL SECTICH esconponATto HOU5 TON LIGHTING AND POWER COVPANY QA-I-I SOUTH TEXA5 PROJECT I

ELECTRIC GENERATING STATION UNIT 51 & 2 4

g RE w stow

[< -/jk,-/

QUALITY ASSURANCE PROCPAM 5-20-83 o rc c........ff............

Procedure No.

Title s

QCP-1.1 Quality Control Organization and Responsibilities R4 QCP-2.1 Indoctrination, Training and Qualification of Quality Control Personnel to ANSI N45.2.6 Requirements QCP-2.2 Indoctrination. Training and Qualification of R5 Quality Control Personnel to ASME Section III, Division 2 Requirements QCP-6.1 Preparation, Review and Approval of Quality R4 Control Procedures QCP-6.2 Document Control QCP-6.3 Quality Control Review of Incot:ing Revisions /

l R5 Changes to Bechtel Specifications and Procederes R4 QCP-9.1 Weld Inspection, Piping, ASME QCP-9.2 Request for NPC QCP-9.3 Inspection of Post Weld 11 cat Treatment l R5 QCP-9.4 Verification of Weld Filler Material Control R4 QCP-9.5 Weld Inspection (AWS)

QCP-10.1 Cadweld Inspection QCP-10.2 Preplacement Concrete Inspection QCP-10.3 Concrete Placement inspectionn QCP-10.4 Post-Placement Concrete Inspection QCP-10.5 Inspection of St ructural Steel Erection and P,olting QCP-10.6 Stud Welding Inspection OCP-10.7 Miscellaneous Metal Fabrication Inspection lR5 i R4 QCP-10.8 Protective Coatings Inspection I

sicb.s iswi io.e2 14 20 Pact

_or EB A5CO SERVICES NUCLEAR CUALITY ASSURANCE PROGRAM MANUAL S E C TION It4CORPOR A T ED HOU5 TON LIGHTING AND P0nER COMPANY QA-I-l SOUTH TEXA5 PROJECT ELECTRIC GENERATING STATION UNIT 51 & 2 4

((bd QUALITY ASSURANCC PROGRAM 5-20-83 carc Procedure No.

Titic QCP-10.9 General Inspection p4 QCP-10.10 Soils Inspection QCP-10.ll Mechanical Equipment Installation Inspection QCP-10.12 Co=ponent Support and Restraint Installation R5 Inspection QCP-10.13 Mechanical Instrumentation Installation Inspection R4 QCP-10.14 Piping Installation Inspection (Interit Procedure, Walkdown Prior to Pressure Testing EW System Only)

QCP-10.15 Electrical Equipment Installation Inspection QCP-10.16 Installation of Electrical Raceways

. { R5 QCP-10.17 Electrical Cable Installation Inspection R4 QCP-10.18 Electrical Cable Teruination Inspection QCP-10.19 Inspection of Concrete Expansion Anchors and R5 Rock Bolts QCP-10.20 Electrical Instrumentation Installation Inspection lR4 QCP-10.21 HVAC Duct / Hanger Installation Inspection R5 QCP-10.22 Receipt Inspection of ASME Section III and Other Safety-Related Equipment / Materials QCP-10.23 Waterstop/Waterproofine, and Joint Filler / Sealer R4 Material Inspection' QCP-10.24 Grouting Inspection QCP-10.23 Inspection of Field Fabrication of Reinrorcir:

R5 Steel QCP-10.27 Modification / Removal Control Procedure j

QCP-II.1 Hydrostatic and Pneumatic Pressure Test Inspection lR4

r si s.s isrei u.c:

15 20 eacc o,

EQASCO SERVICE 5 NUCLEAR CUALITY ASSURANCE PROGRAM MANUAL SECTION lHCoR PQT4 AT ED HOUSTON LIGHTING AND power COMPANY QA-I-l SOUTH TEXA5 PROJECT l

d ELECTRIC GENERATING STATION UNITS 1 & 2 4

P E vi $10 N

,d//v->+.-

QUALITY ASSURANCE PROCRAM 5-20-83 carc

.....,9................

Procedure No.

Title QCP-12.1 Calibration and Control of Measuring and Test Equipment R4 1

QCP-13.1 Storage and Maintenance Inspection / Verification i

QCP-13.2 Verification of Rigging and Handling Activities QCP-13.3 Housekeeping Inspections QCP-14.1 Status Control

^

QCP-15.1 Identification and Control of Discrepancies and Nonconforming Conditions t

QCP-15.2 Stop Work Order QCP-15.3 Control and Processing of Transition Phase R5 Deficiencies and Conditions R4 QCP-16.1 Corrective Action i

QCP-17.1 Quality Assurance Records QAI-001 Site QA Organization and Responsibilities

- QAI-002 Preparation, Review, Distribution and Control of Supplements to Quality Assurance Procedures

. QAI-003 Indoctrination, Training, Qualification, and Certification of. Site Quality Assurance Audit Personnel QAI-004 Issuance' and Processing of Nonconformance Reports QAI-005 Review and Approval of Quality Control and Construction Procedures

- QAI-006-Audit of Ebasco Site Organization by the Client, Bechtel, Ebasco lione Office, Code or Regulatory Agency

_QAI-007

- Reportable Deficiencies y.MYh wh a *

  • hh d

W*-4'-

W w

~ ~

t -

sm.s ism io.e2 16 y _20 pacc EB A5CO SERVICES NUCLEAR QUALITY ASSURANCE PROGRAM MJJ1UAL SECVION incoapoRATEo HOU5 TON LIGHTING AND POWER COMPANY QA-1-1 I

SOUTH TEXA5 PROJECT ELECTRIC GENERATING STATION UNITS 1 & 2 g

4 acvisio 8

...[u...u/%

QUALITY ASSURANCE PROGRAM 5-20-83 c4Tc

.g..........

u Procedure-i No.

Title QAI-008 Quality Trend Analysis of Nonconformance Reports, Deficiency Notices and Audit Findings R4 l

QAl-009

_ Review of Procurement Documents QAI-010 Site Quality Assurance Records QAI-011 Management Corrective !.ction and Stop Work Authority QAI-012 General Surveillance Instruction QAI-013 Preparation, Conducting, Documenting and-Logging of Audits QAI-014 Quality Assurance Review of Radiographs QAI-015 Procedure for the Calibration and Operation of the Radiographic Densitometer QAI-016 Control of Site Quality Records QAI-017 QA Review of Incoming Revisions to Bechtel and liouston Lighting and Power QA Program Documents QAI-018 QA Indoctrination and Training Program QAI-019 Safety-Related Documentation Turnover Packages lRS ASP-1 Preparation of Site Procedures R4 ASP-2 Organization and Responsibility ASP-3 Procurement ASP-4 lleavy llandling and Rigging ASP-S Material Control ASP-6 Document Control ASP-7 Field Change Notices lR5 i

u.

ss' a

,,---+--o

-,.g--,

_we-wy ymme-p w-qr y-

,wwym n-gg,ew.,-

g umur wwdyq"

--w---1

-M-+wy ev-7 W1 wr wevt-1-=='g9 yF w-y T

4-cv-vw

g

-4'W7PT'=v-=r

sics.s isr ei to.u 17 20 j

pace o,

' EB A5CO SERVICES HUCLEAR CUALITY AS$URNICE PROGRAM MA14UAL SECTION i w c o m po s= = T r o HOUSTON LIGHTING AND PowEN COMPANY QA-1-1 SOUTH TEXAS PROJECT i

g ELECTRIC GENEftATING STATION UNITS 1 & 2 4

sc vi sio n h,8Nh...

QUALITY ASSURAt:CE PROGRAM 5-20-83 care e..s...s.,,,,y

..se s.s..ss.

Procedure No.

Title ASP-8 Preparation and Transmittal of Quality R5 Assurance Records R4 ASP-ll Field Change Requests ASP-12 Development of Construction Field Sketches ASP-14 Impact Review of Bechtel/HL&P Issued Documents ASP-15 Stop Work Procedure ASP-16 Corrective Actions l R5 ASP-32 Maintenance of Construction Equipment R4 ASP-33 Nonconformances AS?-34 Indoctrination and Training ASP-32 Fire Prevention and Fire Protection l R5 CSP-1 Excavation and Backfill

{

CSP-2 Installation of Permanent Electrical and R5 Mechanical Plant Equipment R4 CSP-3 Control of Lifting Apparatus CSP-4 Concrete Placement CSP-5 HVAC Duct and Housing Leak Testing R5 CSP-6 Installation of IIVAC Hangers CSP-7 Pipe Support Installation CSP-8 Cable Terminations and Splices lR4 CSP-9 Installation of Duct and Duct Accessories CSP-10 Erection and Boltup of Structural Steel R4 CSP-11 Storing, Installation, Cadwelding, Fabrication and Modification of Rebar

6t CA 0 ISV P) 13.e2 PAGE OF

' EB A5CO SERVICES HUCLEAR QUALITY ASSURANCE PROGRAM v>J4UAL S EC TION INeoRPORATED HOU5 TON LIGitTING AND POWEH COvPANY QA-I-l SOUTH TEXA5 PROJECT d

ELECTRIC GENERATING STATION UNITS 1 & 2 4

RE ve $10 N h..g/My QUALITY ASSURANCE PROGRAM 5-20-83 o4TE

....,....,y....c......

Procedure No.

Title' CSP General Instructions for Housekeeping During g4 Construction CSP-13 Concrete Core Drilling CSP-14 Control of Material for Temporary Construction lR5 R4 CSP-15 Installation of Special Doors CSP-16 Piping Installation Procedure CSP-17 Hydrostatic and Pneucatic Testing CSP-18 Soil Test Fill Procedure CSP-19 Non-Safety Related Cable Pulling l R5 CSP-20 Construction Survey Activities R4 CSP-21 Field Preparation and Coating of Surfaces Outside the Reactor Containnent Building CSP-22 Valve / Pump Work CSP-23 Water Flushing, Lube Oil Flushing, and Checical R5 Cleaning CSP-24 Reactor Coolant Pump Volute Final Setting l R4 CSP-25 Temporary Equipment Site Tagging Procedure l R5 R4 CSP-26 Reactor Vessel Final Setting CSF-27 Steam Generator Final Setting CSP-29 Reactor Vessels Internals Handling and Assembly CSP-30 Field Preparation and Coating of Surfaces Inside R5 the Reactor Containment Building CSP-31 Piping System Cleanliness lR4 CSP-22 Insulation Resistance Testing of Cables and Equip ent 7

6109.6 (ST Pl 10.02 POGC OF EBA5CO SERVICES HUCLEAR QUAllTY ASSURAPICE PROGRAM MA?4UAL SECTION

$NCoRPoRATED HOU$ TON UGHTING AND POAER COMPANY QA-1-1 SOUTH TEXA5 PROJECT d

ELECTRIC GENERATING STATION UNIT 51 & 2 4

O ar visio n

[

fgAg QUALITY ASSURANCE PROGRAM 5-20-83 care c..

,........y.....c......is.

Procedure No.

Title CSP-34 Control and Verification of Survey Equipment R5 CSP-35 Installation of Post-Tensioning Trumplate Assemblies and Sheathing CSP-36 Data Collection to Support Geotechnical g4 Monitoring Program CSP-37 Crane and Hoist Load Testing R5 CSP-38 Equipment or Component Interchange CSP-39 Vendor's ASME Code Data Plate Modification CSP-40 EE580 Cable Raceway and Tray Tracking l R4 CSP-41 Installation of Expansion Type Anchors RS CSF-43 Installation of Electrical Raceways CSP-44 Installation of Electrical Penetrations CSP-47 Instrumentation and Controls Installation CSP-48 Instrumentation and Controls Tubing and Supports Fabrication and Installation CSP-49

-Permanent Plant Equipment Site Tagging Procedure CSP-54 Field Fabrication of Miscellaneous Metal CSP-55 Field Fabrication of Reinforcing Steel CSP-60 Rigging for Setting Steam Generator CSP Rigging for Setting Pressurizer CSP-62 Rigging for Setting Reactor Vessel CSP-63 Rigging for Setting Unit #2 Reactor Head CSP-64' Rigging for Setting Unit #2 Reactor Internals

=

sip.6 ist m io.s:

pace. 20,, 20

' ES ASCO SERVICES NUCLEAR CUALITY ASSURANCE PROGRAM MANUAL S E C T104 tecoRPORATED HOUSTON LIGHTING AND POWER COMPANY QA-1-1 j

SOUTH TEXA5 PROJECT ELECTRIC GENERATING STATION UNITS 1 & 2 4

R E VISION

[M"*> '7/

QUALITY ASSURANCE PROGRAM 5-20-83 caTc

..........,j..............

Procedure No.

Title CSP-65 Rigging for Setting Unit #2 Polar Crane R5 CSP-81 Welder Qualification R4 CSP-82 AWS Dl.1 Structural Welding CSP-83 General ANSI B31.1 Welding Requirements for Piping and Hangers CSP-84 General ASME Section III Welding Requirements fcr Piping and Hangers CSP-85 Post Weld Heat Treatment CSP-86 Repairs of ASME Section III and ANSI B31.1 Piping and Components CSP-87 Welding Procedure Specification Qualification CSP-88 Weld Filler Material Control CSP-89 Field Welding and Repair of Aluminum Bron::e ECW [ Essential Cooling Water) Piping CSP-90 Welding Documentation CSP-91 Issuance and Control of Furge Dams CSP-92 Control of Aluminum Bronze Material for Backing Rings and Weldcr Qualification Coupons CSP-93 Control of Weld Filler Material For Non-Per=anent Plant Maintenance CSP-94 Maintenance, Calibration and Repair Program for Dimetrics Automatic Welding Equipment CSP-95 General Welding Requirements for liVAC R5 CMI-!

Caring and Mainten.uice o f Pe rma ne n t Plant Items

~.-

m.e

1 13 sios.s tsipi to.e2 Pact w

EBASCO SERVICES HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION INCoRPoRATEo HOUSTON LIGHTING AND POWER COMPANY QA-I-2 500TH TEXAS PROJECT d

ELECTRIC GENERATING STATION UNIT 51 & 2 4

>o RE ve ssON

[ g)%*y ORGANIZATION AND RESPONSIBILITIES 5-20-83 oarE

<..... -.,y y............

V 1.0 SCOPE This section of the Manual describes the organizational structure, functional responsibilities, levels of authority, and lines of internal and external communication for management, direction, and execution of the Ebasco Quality Program.

It is recognized that quality assurance is an interdisciplinary function and not the sole domain of a single quality assurance group; for that reason, this section of the Manual includes organizational and functional descriptions of several departments in addition to that department whose sole function is quality assurance.

2.0 GENERAL 2.1 The Ebasco Operations organization consists of four independent quality-related principal divisions headed respectively by the Senior Vice Presidents of Engineering and Construction, Consulting Engineering, and Projects and Procurement, and the Vice President Materials Engineering and Quality Assurance. Each of these officers of the company reports to Ebasco's President and Chief Executive Officer through the Executive Vice President Operations. Reporting to the Senior Vice President Engineering and Construction are the Vice President Engineering and Vice President Construction.

Reporting to the Senior Vice President Consulting Engineering are the President of Envirosphere Company, the Vice President Plant Operations and Betterment, and the Vice President Consulting Engineering.

Reporting to the Senior Vice President Projects and Procurement is the Vice President Procurement.

A fifth quality-related principal division is headed by the Executive Vice President of Advanced Technology and Special Projects who reports directly to Ebasco's President. Reporting to the Executive Vice President Advanced Technology and Special Projects is the Vice President Advanced Technology.

2.2 Representatives of the Senior Vice President Projects and Procurement; of the Vice Presidents Engineering, Construction, Procurement, Plant Operations and Betterment, Consulting Engineering, and Materials Engineering and Quality Assurance; and of the President of Envirosphere Company comprise the operations organization representatives of the Quality Program Committee, which is responsible for Ebasco Quality Assurance policy. Also included on this Committee is a representative of the Vice President Advanced Technology. This is shown diagramatically by Figure I-2.1 at the end of this section.

2.3 The divisions or departments most directly involved in the implementation of the quality assurance program for fabrication and installation are Materials Engineering and Quality Assurance, Construction, and Procurement. The organizational structures of these

)

l 6109.6 tsTP) 10.02 2

13 Pact or WBASCO SERVICES NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION INCORPORATED HOUSTON LIGHTING AND POWER COMPANY QA-1-2 SOUTH TEXAS PROJECT g

ELECTRIC GENERATING STATION UNITS 1 & 2 4

at vision

[M2d ORGANIZATION AND RESPONSIBILITIES 5-20-83 cart c..

,o m.

u.c. c.......

(

L are shown in Figures I-2.2, I-2.4, and I-2.5 at the end of this section.

f The Construction Department provides overall contractual administration of a. project, coordinating the efforts of involved departments and serving as a line of communication between Ebasco and its Clients. The Consulting Engineering, Plant Operations and Betterment, and Advanced Technology Departments are involved in the implementation of Quality Program requirements through the supplemental services they provide.

The responsiblities of each department of the Ebasco Organization for quality assurance requirements applied to Nuclear Power Stations are described herein.

3.0 MATERIALS ENGINEERING AND QUALITY ASSURANCE 3.1 Primary responsibility for Quality Assurance rests with the Vice President Materials Engineering and Quality Assurance who reports directly to the Executive Vice President Operations. Qualification requirements for the position af Vice President Materials Engineering and Quality Assurance are:

Bachelor of Science Degree in Engineering; 10 to 15 years of experience in quality-related work or equivalent experience in the engineering or construction of a nuclear power plant, including at least 10 years experience in responsible managerial project positions; thorough knowledge of the Ebasco Quality Assurance Program. The Materials Engineering and Quality Assurance Unit is comprised of the following organizations, each of which contributes directly to the implementation of the Quality Program (see Figure I-2.2):

a) Quality Assurance Engineering b) Materials Applications c) Vendor Quality Assurance d) Consulting Quality Assurance Engineer e) Materials Engineering Laboratory 3.1.1 Quality Assurance Engineering is administered by the Chief Quality Assurance Engineer who reports to the Vice President Materials Engineering and Quality Assurance. Qu sli fication requirecients for the position Chief Quality Assurance Engineer are:

Bachelor of Science Degree in Engineering; 10-15 years of experience in quality-related work or equivalent experience in the engineering or construction of a Nuclear Power Plant, including at least 5 years experience in responsible managerial project positions; thorough

.n__.__

.. =

._1 3

13 Gl09.6 4$TPi to.lB2 PoGE or

' EB A5CO SERVICES NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION INCORPORATED HOU5 TON UGHTING AND POWER COMPANY QA-I-2 SOUTH TEXA5 PROJECT I

ELECTRIC GENERATING STATION UNIT 51 & 2 4

g acvision h..jd..$h?d".f,..............

wow /

ORGANIZATION AND RESPONSIBILITIES 5-20-83 e

oare

.. m..

knowledge of the Ebasco Quality Assurance Program. The Quality Assurance Engineering Department is responsible to plan 4

implementation of, evaluate, monitor, and enforce the Ebasco Quality Program. This responsibility is carried out by five functional subdivisions:

a) Project Quality Assurance Engineering b) Site Quality Assurance / Quality Control c) Site Quality Program 4

d) Quality Assurance Specialists, which provide various other quality-related services and functions e) Nondestructive Examination (NDE) Quality Assurance Managers, Supervisors, and Specialists in charge of the subdivisions report directly or through other supervisors to the Chief Quality Assurance Engineer.

Engineers and Specialicts are then assigned to specific projects from these subdivisions. The Quality Assurance Engineering Organization is shown in Figures I-2.6 and I-2.7 at the end of this section.

3.1.1.1 Site Quality Assurance - The Manager Site Quality Assurance, who reports to the Chief Quality Assurance Engineer in New York, is responsible for the direction, supervision, and administration of site quality assurance / quality control operations at those nuclear construction sites where a Quality Program Site Manager is not assigned. The Manager Site Quality Assurance is responsible for the development, maintenance, and current status of Site Quality Assurance Engineering Procedures, for j

providing technical assistance and guidance to subordinate Quality Assurance Engineering Site Supervisors and staff, and for distribution and control of quality assurance manuals, as well as changes thereto, for the South Texas Project.

(See Figures I-2.2 and I-2.6.)

In addition, he is responsible for the review and acceptance of Quality Control procedures.

3.1.1.2 Site Quality Program - A Quality Program Site Manager is assigned to each nuclear project construction site on a resident basis for the purpose of overall planning, direction, and implementation of the Ebasco Nuclear Quality Program Manual. The Quality Program Site Manager, who reports to the Chief Quality Assurance Engineer in New York, is subordinate to no individual on site and has the independent authority to identify site quality-related problems, to initiate or recommend solutions, to control

--. - = - - - -

0 13 stes.sisTPiio.e3 Pact or

  • EBASCO SERVICES HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION INCORPORATEo HOU$ TON LIGHTING AND POWER COMPANY QA-I-2

$0UTH TEXAS PROJECT d

ELECTRIC GENERATING STATION UNITS 1 & 2 4

O R E VI SIO N

/<fId '~tT-ORGANIZATION AND RESPONSIBILITIES OATE 5-20-83 c..,...t.,p.............

=

1 existing nonconformances, to verify implementation of j

approved dispositions, to direct efforts to obtain ASME Certificates of Authorization for Ebasco as may be required for the South Texas Project, to represent Ebasco Quality Assurance Engineering with regard to South Texas Project activities, such as Client or his designee, Ebasco, and/or Vendor meetings, Client or his designee audits, and management audits, and, when necessary, to stop work. He is responsible to assure that all personnel working for him are qualified for their respective positions and properly trained. The Site Quality Program function is divided into three groups: Quality Assurance Engineering, Quality Control, and Quality Records, each reporting through a respective supervisor to the Quality Program Site Manager.

(See Figure 1-2.6.)

3.1.1.2.1 Site Quality Assurance Engineering - A Quality Assurance Site Supervisor and staff of engineers and representatives are assigned the following functions:

)

a) Review and audit quality-related site construction and engineering activities and records on a continuing basis.

b) Audit construction forces for adherence to prescribed approved procedures.

c) Review and/or coordinate review of l

site suppliers' fabrication and test procedures.

d) Review site-generated purchase orders for inclusion of quality assurar.cc requirements.

e) Review and advise on Quality Control Procedures for compliance with this Manual and code and regulatory requirements. When necessary, the Quality Assurance Site Supervisor may request the Manager Site Quality Assurance to assist in the review of these procedures.

Mwm t w:se wom.e~* ;- '---

-~ + - - * - - -

~ '**

~

w

~

-m-ee rwv w

~twm

'T'*-"

-&*"'"'W-&

M'r4r'tn

-~~~-w'-

"m

-=~~~'s W

'r'

-v'm W"

-'-~--w~w,-rr-r wm

r 5

13 sics.s isTen to.e2

' AGE

'EBA5CO SERVICE 5 HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION INCORPORATED HOU$ TON UGHTING AND POWER COMPANY QA-I-2 SOUTH TEXAS PROJECT d

ELECTRIC GENERATING STATION UNITS 1 & 2 4

g m E vision h fMN ORGANIZATION AND RESPONSIBILITIES 5-20-83 cart

=

c..,... m yj.... c a......

f) Maintain records of all reviews and audits performed.

l g) Review all radiographic film for site-related nondestructive examination.

h) Audit final records and documentation prior to turnover to the Client.

i) Evaluate quality assurance programs of suppliers.

j) Prepare quality assurance plans for the surveillance of activities in supplier's shops.

k) Review or coordinate the review of suppliers' nondestructive examination and test procedures.

1) Conduct audits of Vendor Quality Assurance personnel.

m) The Quality Assurance Site Supervisor has stop work authority.

3.1.1.2.2 Site Quality control - A Quality Control Site Supervisor and staff of engineers and inspectors are assigned the following functions consistent with the scope of work assigned to Ebasco:

a) Planning and performance of inspection activities during the.

construction phase.

b)

Identifying and initiating correction of nonconforming conditions to requirements indicated by drawings, specifications, codes, or procedures, and performance of reinspection to verify corrective action taken.

c) Establishing and enforcing quality control documentation and inspection requirements based upon specifications, codes, standards, and drawings as established by Engineering.

6,, 13 st os.s (se pi io.es pact

  • ESASCO $ERVICES HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION

-lNCoRPoRATED HOU5 TON LIGHTING AND POWER COMPANY QA-I-2 SOUTH TEXA5 PROJECT I

ELECTRIC GENERATING STATION UNITS 1 & 2 4

g n a visiom h

gd$k}b-+t/

ORGANIZATION AND RESPONSIBILITIES 5-20-83 care c,.......u,, g,

...c d) Performance or monitoring of site NDE, soils, and concrete testing activities.

e) Assisting in organizing and administering training seminars as required to assure proper level of training, and engaging in the certification of Quality Control personnel to the required level of qualification.

f)

Identification and control of the quality status of items.

g) Development and implementation of applicable Quality Control Plans, and generation of inspection reports covering mandatory inspection activities at the construction site.

h) The Quality Control Site Supervisor has stop work authority.

The Site Quality Control Group will only be responsible for first-level Quality Control activities for safety-related items and services being performed by Ebasco's forces. For work being performed by Contractors, the Contractors will be responsible for first-level Quality Control activities.

3.1.1.2.3 Site Quality Records - A Quality Records Supervisor and staff of specialists are assigned the following functions:

a) Develop, establish, and implement a system for the collection, storage, and maintenance of Quality Assurance Records at the project construction site.

b) Responsible for review for completeness', control, storage, preservation, and safekeeping of vendor / contractor and site-generated quality assurance records.

l

st o9.6 ($T P) 10.08 PSGE OF

  • EBASCO SERVICES HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION thcoAPORATEo HOU$ TON LIGHTING AND POWER COMPANY QA-I-2 SOUTH TEXA5 PROJECT I

ELECTRIC GENERATING STATION UNITS 1 & 2 4

REVl540N M

N,.................

5-20-83 ORGANIZATION AND RESPONSIBILITIES oaTE c) Establishment and implementation of a records indexing system to permit proper traceability and retrieval.

d) Establishment of a procedure for access to the records storage area, and removal and retrieval of quality records.

3.1.1.3 Quality Assurance Specialists - Qaality Assurance Engineering has several specialty groups responsible for the following activities which are performed in accordance with QA procedures:

a) Performance of In-service Inspection, b) Qualification and certification of personnel as requi~ red by applicable codes or standards.

c) Development of Quality Assurance standards and procedures.

d) Review, evaluation, and summarization of Code and Regulatory Quality Assurance Requirements.

e) Evaluation of suppliers' Quality Assurance Program.

f) Conducting Quality Assurance education, both internal and er.iernal to Quality Assurance Engineering.

g) Interdepartmental auditing of all individuals or groups responsible for activities covered by the Quality Program, h)

Development of Quality Assurance Records Programs.

i) Development of Quality Assurance Programs for Power Plant Operations.

3.1.1.4 Nondestructive Examination Quality Assurance - This group, under the Assistant Chief Quality Assurance Engineer in charge of In-service Inspection and Nondestructive

.. - --w m,, - -.-. _ -

. _.,.. ~.

x 8

13 61 M.i (5f M 10.82 PAGE OF 6

  • ES ASCO SERVICE 5 HUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION INconPonATED HOU5 TON LIGHTING AND POWER COMPANY QA-1-2 SOUTH TEXAS PROJECT N

ELECTRIC GENERATING STATION UNITS 1 & 2 4

g aEvision k gW ORGANIZATION AND RESPONSIBILITIES 5-20-83 o,7c

=

c. u...u,
j.... u.... u.

Examination, provides expertise with regard to conducting various forms of NDE and includes the following functions:

a) Establish and/or interpret NDE requirements and acceptance criteria for fabricated and erected equipment as required.

b) Review and comment on NDE procedures and radiographic films submitted by manufacturers, site construction forces, and/or clients.

c) Advise manufacturer and site construction forces as to proper NDE procedures, applications, techniques, equipment, and qualifications.

3.1.1.5 Radiation Safety - Ebasco's Corporate Radiation Safety Officer reports to the Chief Quality Assurance Engineer.

He is responsible for auditing and enforcing the Ebasco procedures for radiation safety.

3.1.2 Materials Applications, under the supervision of the Chief Materials Applications.agineer, includes two subdivisions:

R4 Materials Applications Engineering and Welding Engineering. A Project Materials Applications Engineer and Project Welding Engineer are assigned to each project. These positionc may be assigned to the same individual if properly qualified. Quality-related activities of Materials Applications personnel include the following:

a) Develop material and welding specifications.

b) Develop and qualify welding procedures and fabrication techniques for use by Ebasco site construction forces, engineered equipment suppliers, and erectors.

c) Advise Ebasco Construction Management as to the development and application of advanced welding techniques which would enhance quality.

d) Review Ebasco specifications and drawings for compliance with applicable codes and regulatory requirements for proper selection of materials, weld procedures, and joint

details, e)

Review suppliers' material specification and fabrication procedures for compliance with project specifications and codes.

I f) Assist in welder performance testing to assure that all code and regulatory requirements have been met.

9 13 st es.s (sT PI 10.82 POGE OF -

EBASCO SERVICE 5 NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTIG;I INCoRPORATEC HOU5 TON LIGHTING AND power COMPANY QA-I-2 SOUTH TEXA5 PROJECT I

ELECTRIC GENERATING STATION UNITS 1 & 2 4

g R E Vi$loN WdhhN4*S4 5-20-83 ORGANIZATION AND RESPONSIBILITIES o*TE

.........m,y.................

g) Participate in quality assurance evaluations of suppliers in the area of welding, materials, and fabrication.

h) Provide technical assistance as required to resolve problems in suppliers' shops and at the construction site in the areas of welding, materials, heat treatment, and other related areas.

i) Provide technical assistance concerning material properties under service conditions involving stress, radiation, temperature, corrosive media, etc., to determine capability of specific materials to perform in such environments.

3.1.3 Vendor Quality Assurance is administered by the Chief Vendor Quality Assurance Representative who reports to the Vice President Materials Engineering and Quality Assurance. The primary function of this department is to establish and maintain confidence that purchase order and documented Quality Assurance Program requirements are complied with during fabrication in Suppliers' shops and in those of their sub-suppliers, and to document results of shop surveillance visits made to carry out this function.

3.1.4 The Consulting Quclity Assurance Engineer reports to the Vice President Materials Engineering and Quality Assurance. He is responsible for conducting audits of the Ebasco Quality Assurance function to determine and report its compliance with the Ebasco Quality Program requirements.

3.1.5 The Materials Engineering Laboratory performs field nondestructive examination, and soils, concrete, and reinforcing steel testing services at construction sites, as applicable. The Laboratory is administered by a Manager who reports to the Vice President Materials Engineering and Quality Assurance.

4.0 CONSTRUCTION Primary responsibility for construction rests with the Vice President of Construction (see Figure I-2.4).

The Construction Department has the prime responsibility for the performance of quality construction.

4.1 The Ebasco Construction Manager reports to the Vic.? President of Construction and is responsible for overall supervision and coordination R4 of all construction activities and services. The Ebasco Construction Manager has stop work authority.

n n.s istpi u.s2 10 13 Pact o,

' EliASCO SERVICES NUCLEAR CUALITY ASSURANCE PROGRNA MANUAL S E C TIO N INeonPonATED HOU$ TON LIGHTING AND POWER COMPANY QA { 2 SOUTH TEXA5 PROJECT

)

l ELECTRIC GENERATING STATION UNIT 511. 2 g

4 ac visio n

!. _..z..(5* b y ORGANIZATION AND RESPONSIBILITIES 5-20-83 carc

.......y................

4.2 The Manager of Construction Services reports to the Vice President of Construction and is responsibic for general supervision of Construction Department Quality Program activities and of the Construction Engineering Group.

4.2.1 The Manager of Construction Engineering reports to the Manager of Construction Services and is responsible for the inclusion of quality requirements in Construction Contracts and review of Engineered Documents as required by the Quality Assurance Program Manual.

(All construction contracts involving safety-related equipment are subject to review by the Quality Assurance Engineering Department for compliance with the applicable code and regulatory agency requirements and Quality Assurance Program requirements.)

4.3 The Site Manager reports to the Ebasco Construction Manager. The Site Manager is the construction leader at the site and is responsible R4 for the accomplishment of all construction-related activities. The Site Manager has stop work authority.

4.4 The Project Superintendent reports to the Site Manager and is responsible for performing general site supervision of construction in R5 accordance with drawings, specifications, and contractual obligations.

The Project Superintendent has stop work authority.

4.5 The Unit Superintendents report to the Project Superintendent.

l R5 Each Unit Superintendent is individually responsible for the Ebasco construction operations and activities within his assigned unit of the R4 plant. The Unit Superintendents have stop work authority.

4.6 The Assistant Superintendents report to the Unit Superintendents.

The Assistant Superintendents will manage all phases of construction within disciplines assigned, including field engineering and cost control, to assure that the work accomplished is completed within the budget and in accordance with all installation specifications.

l R5 4.7 The Discipline Superintendents report to the Assistant Superintendents.

Each Discipline Superintendent will direct, coordinate, and conf tor all work performance within discipline to assure that work proceeds in accordance with approved planu, specif! cations, and QA program in compliance with approved Level III schedules.

6 o $.s isi n io.s:

IIs. 13 Pact

'EB A5CO SERVICES NUCLEAR CUALITY ASSURANCE PROGRAlA MANUAL S E C TIO N INeoneonAtto HOU5 TON LIGHTING AND POWEH COMPANY QA-I-2 50VTH TEXA5 PROJECT T

EtECTRIC CtNERATlHG STATION UNIT 11 & 2 4

mi ve tros

...f....f.....by ORGANIZATION AND RESPONSIBILITIES 5-20-83 oart

. y.............

4.8 The Labor Relations Representative reports to thc Site Manager.

The Labor Relations Representative is conversant with the general provisionc

,g of the Project Stabilization Agreement. The Labor Relations Representative participates in settlement of local labor disputes, assista in preparation for arbitration proceedings related to operations at the site, and advises the Project Superintendent on local labor relation matters.

4.9 The Senior Resident Engineer reports to the Site Manager and is responsible tor administering, coordinating, and supervising all Site Construction Engineering and technical activities, for interpretation of design docunents and specifications, and for furnishing assistance to Ebasco site personnel as required. The Senior Resident Engineer has stop work authority.

4.10 The Conctruction Control Superintendent reports to the Site Manager

{ R5 and is responsible for planning and scheduling; field cost and construction control; material tracking, takeoff, and expediting; and R4 progress monitoring and reporting.

4.11 The Construction Indirects Superintendent reports to the Project R5 Superintendent.

The Construction Indirects Superintendent is responsi' 'e for the direction of all support craft forces on the project, and th, i

supply, =aintenance, and repair of major project construction equipmen..

I R4 The Construction Indirects Superintendent has stop work authority.

l R5 4.12 The Construction Services Manager reports to the Site Manager and 1 R5 4 will be responsibic for providing and establishing adequate and efficient j R4 security, safety, and training and development programs.

4.13 The Safety Supervisor reports to the Project Superintendent.

The lR5 Safety Supervisor is responnible for establishing and enforcing the site safety and industrial hygiene programs in accordance with established R4 policy and all federal and state regulationn, as well as any other criteria necessary to insure the safety of site personnel.

4.14 The Adminintrative Manager reports to the Site Manager. The IRS Adninistrative Manager is responsible for providing the necesnary p4 accounting, timekeeping, purchasing, material control, and computer support, as required to support the construction effort.

sda.sistpiis.e:

esce

.l.2 13

_or

' EB A5CO SERVICts NUCLEAR QUALITY ASSURANCE PROGRAM M>J4UAL 5ttitos INcoRooHATED HoU$ TON LtGHTING AND Po#ER COMPANY I

SOUTil TF.XA5 PROJECT QA.} 2 g

ELECTRIC GENERATING STATION UNIT $ 1 & 2 4

a r vi $loN h.. [..... 8 %

ORGANIZATION AND RESPONSIBILITIES 5-20-83 oare

... y...............

4.15 The Warehouse Administrator reports to the Ad;ninistrative Manager.

The Warehouse Administrator is responsible for field procurement R4 activities, including negotiating and placement of purchase orders.

4.16 The Materials Purchasing Agent reports to the Administrative Manager and is responsible for all field procurement activities, including negotiating, placement, and expediting of purchase orders and certain subcontracts, lie is also responsible for procuring proper quality and insuring on-time delivery of field purchases, in order to support the Field Construction schedule. lie has reporting to him all field purchasing agents, expeditors, and typists assigned to the Field Purchasing Department.

4.17 The Subcontract Coordinator reports to the Project Superintendent l R5 and is responsible for coordinating preparation of all construction subcontracts and providing administrative assistance as required to support construction during c::ccution of all subcontracts.

4.18 The Outlying Facilities Superintendent reports to the Project Superintendent and is responsible for supervising and coordinating in an R5 efficient canner all construction activities of all the Outlying Plant R4 facilities, including the Diesel Generating Building in Unit I and Unit 2.

The Outlying Facilities Superintendent has stop work authority.

4.19 The Welding Superintendent reports to the Chief Materials Applications Engineer or his designee. The Welding Superintendent will receive his day-to-day and technical direction from the Materials Applications Department in New York.

4.20 The System Completion Superintendent reports to the Project R5 Supe ri n t e nd e n t and is responsible for systems completion.

lie ensures construction progress in support of systems completion. This includes coordination of all prestart-up planning and scheduling, and conducting construction test effortc.

4.21 The Second Shift Superintendent reports to the project Superintendent and is responsible for performing general site supervision of construction in accordance with drawings, t,pec i t'I ca t io ns, and contractual obligations for all activitten performed on the second shift.

The Second Shift Superintendent has stop work authority.

bl es.s (sT PI 10.83 PSGE Or s

' ESA5CO SERVICES NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL SECTION INCORPORATED HOU5 TON LIGHTING AND POWER COMPANY QA-I-2 SOUTH TEXAS PROJECT d

ELECTRIC GENERATING STATION UNITS 1 & 2 4

>o n t vissow

[

/[M /

ORGANIZATION AND RESPONSIBILITIES 5-20-83 onre e.,v e m,n p..<a n....nn.

v 5.0 PURCHASING AND TRAFFIC Primary responsibility for purchasing and traffic by the Ebasco Engineering Office rests with the Vice President of Procurement.

5.1 Project Procurement Supervisors report to the Director of Purchasing through the Purchasing A$ents and the Manager of Project Purchasing. The i

Director of Purchasing is responsible to the Vice President of

' Procurement. Contract Administrators and Buyers, who report to the Project Procurement Supervisors, are responsible for the phases of purchasing to which they are assigned.

5.2 The Purchasing Department is' responsible for the following:

5.2.1 Obtaining prequalification quality assurance information from prospective Bidders.

m 5.2.2 Transmitting technical and quality assurance requirements to qualified prospective Bidders by inquiry.

5.3 The Manager of Traffic and Freight Forwarding reports to the Vice President of Procurement and is responsible for the overall transportation activities, project related, and purchased equipment from vendors' plants to jobsite as required under contract provisions.

6.0 INTERFACE Interface, as applicable, is so illustrated by Figure 1-2.9 at the end of R4 this section and is explained by appropriate and applicable South Texas Project documents.

e

+e_w-e-we % ~ _

.N *WM Tc'.4 8'"I

%M---

.,yn M -w&ww % m,amew.

F g

-p.

4-e d-

'8

- 1

a6 W

2 Ebasco Services incorporated ORGANIZATION FOR CONSTRUCTION ADAPTED FOR HOUSTON LIGHTING & POWER COMPANY SOUTH TEXAS PROJECT ELECTRIC GENERATINGSTATION UNITS 1 & 2 vets ent.sawNT O

CONS 1HUCf10 l

co u.=.o.c.e.=

co r...

.u

..c.o

..c I

e.c..c. a.....

. u i

=..

I, y

.u.

g N avoas j

g NEW,voms s.n

s..

co....

co..

. =.. =

u...

~ <.

-.~" = =>

I I

I

.~....

,j,;,...ill:i,,,

,,,g,

.u I

I

. '.. =

.G I

Co... <.s f...f f,.O.,

o.u...

I I

c..o...<,

Su i.c 3e

. m p.m. s o.

.... eg gt

.H..

.o ND t'1 -

..w

<O

_.rm i.s :

.o.

n=e.

sne.<*a.utao..'.

y er..a n

,, n MN

  • -4 N ra h

w

COMPANY, INTERFACE BETWEEN HOUSTON LIGHTING & POWERVICE

}

BECHTEL ENERGY CORPORATION, AND EBASCO SER 9

Stif PROJECT OA "A"" CIA MANAGER HOUSTON LIGHTING & POWER CO.

-l messeesse.......m. see

-I mmeeeermemo s o m essesammme es se s seeem e mem ees oBECHTEL EN mm eeemeess eesseemeessessesseessessesseeeeeeeeme q

e.......................

Ot $tGN E NGINE E RING CORPOR AT E

-l OA L_.

f"""

)

a l

_r MANAGER OF CONST RUCTION -

i PROJECT OA Of PUTY MANAGER MANAGER OF CONSTRUCTIONJ b

i L

j l

L FIE L O INCINEERING

._l 1

ENERGY CORP.

.B E.C..H T E Lesseeeeeeeeeessesseessee

.se essesseeeeeeeeeeeeessesseees es eses see eeee e eeeeeeeeee EB ASCO SE RVICES INC.

ese s

seneses.eeeeeeeeeeeeeeeeeeeeeeeeessesseeesseessessessee,

. e eeeeeeeeeeeeeeeeeeeeee J-1 VICE PRESIDENT I-CONST RUCTION CHIEF GA l~

E NGINilR o

L_

.- CH i

CONSf HUCitON 6

MANAGER I

OUALITY PROGR AM==""""""~

$1TE MANAGER

[ $1TE MANAGER J

(

?3 M-4 r

_i M

]

j 4 C*)

$E NIOR R(SiOE NT c

c e

E NGt N E. E R PROJF C T y

N INTERf ACE

$UFE RINT E NDE NT g

e COMWhlNICATiON j

U) e-4

- TICHNICAlfADMINt$1R AflVE H e DiR E CT ION g

4 b