W3P84-2184, Application to Amend CPPR-103,extending Completion Date to 841231
| ML20095A095 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/15/1984 |
| From: | Leddick R LOUISIANA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| W3P84-2184, NUDOCS 8408210378 | |
| Download: ML20095A095 (3) | |
Text
..
o Lo u isiana! NEW ORLEANS LOUISIANA
,4.c L e~ee
.Ee7 m eexecee POWER & LIGHT 70174-6008 9 (504)368-2345 NuS$50sS$
August 15, 1984 l
ROTH S. LEDDICK l
Senior Vice President Nuclear Operations j
W3P84-2184 3-A1.01.04 Q-3-A28.ll Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
Louisiana Power & Light Company Waterford SES Unit 3 Docket No. 50-382 Amended Request for Extension of Construction Permit
REFERENCES:
- 1) Letter from R.S. Leddick to D.G. Eisenhut (W3P83-3264), dated September 29, 1983
- 2) Letter from D.G. Eisenhut to J.M. Cain, dated June 13, 1984
Dear Mr. Eisenhut:
In the above Reference 1 and pursuant to 10 CFR 50.55(b), Louisiana Power
& Light requested that the Commission extend the construction completion date for Waterford SES Unit No. 3 set forth in the Construction Permit, CPPR-103, to September 30, 1984. Louisiana Power & Light hereby amends that request for a construction completion date extension until December 31, 1984.
Although it is felt that design, construction and testing of Waterford 3 has essentially been completed in accordance with the Final Safety Analysis Report and other licensing documents and that the unit is now ready to load fuel, additional time is necessary to address the concerns of the NRC Staff in the above Reference 2, which were unanticipated at the time of the extension request in Reference 1.
The request for a three month extension is considered to provide a prudent margin beyond the time required to resolve the issues from Reference 2.
er y ou r s',
8408210378 840815 c
R. 'S. Leddick PDR ADOCK 05000382 A
PDR g
RSL/RWP/ch cc:
E.L. Blake, W.M. Stevenson, J. Wilson, G.L. Constabic, D.M. Crutchficid, J.T. Collins
.o -
Before the UNITED STATES NUCLEAR REGULATORY COMMISSION Docket No. 50-382 In the Matter of LOUISIANA POWER & LIGHT COMPANY Construction Permit Extension Request Amendment Louisiana Power & Light Company, Applicant in the above captioned proceeding, hereby files a request to amend the September 29, 1983 extension request for the Construction Permit, CPPR-103, for Waterford SES Unit No. 3.
Respectfully submitted, LOUISIANA POWER & LIGHT COMPANY By:
R.'S.
1,eddick Senior Vice President Nuclear Operations DATE: August 15, 1984
o STATE OF LOUISIANA)
) SS PARISH OF ORLEANS )
R. S. Leddick, being duly sworn, states that he is Senior Vice President -
Nuclear Operations of Louisiana Power & Light Company and that he is authorized on the part of said company to sign and file with the Nuclear Regulatory
- Commission this Construction Permit extension amendment request.
~
'R. S. Leddick SUBSCRIBED AND SWORN to before me, a Notary Public, in and for the Parish and State above named, this' 15th day of August
, 1984.
/
b
/)
Publ
/
MY COMMISSION EXPIRES:
1
-