DUKE POWElt GoxPm P.O. IIOx 33189 CIIAnLOTTE, N.C. 28242 IIAL IL TUCKER Teurnoxe voca PumsanswT (704) 373-4531 atT, LEAR PNopt:( TIOM August 14, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Ms. E.G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

In response to an August 9, 1984 telephone request by Melanie Miller of your

staff, attached is the Failure Analysis Associates report entitled

" Tors iograph Test Of Emergency Diesel Generator IA At Catawba Nuclear Power Station".

Please note that this test was made while the Catawba Nuclear Station IA diesel generator was operating with TDI style "AN" piston skir ts.

These piston skirts were replaced during the July 1984 inspection with style "AE" pis ton skirts.

This replacement will not affect the results of this test as the weight differences are insignificant.

Also, a summary of the 1A diesel engine operational load history (from July 17, 1984 letter to C.L. Ray, TDI Owners Group from G.W. Hallman) is described es percentages below.

The diesel had been run about 157.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> by various groups such as construction, startup, and TDI before this " operational load i

history" log was begun.

This 157 hours0.00182 days <br />0.0436 hours <br />2.595899e-4 weeks <br />5.97385e-5 months <br /> is considered as No Load for these calculations.

Start No.

61 should show a run duration of 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> rather than 43. The percentages listed refer to the 705.22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> represented in the

(

July 17, 1984 Operational Load History plus the 157.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, (862.7 total).

l This 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> more than the 813 hour0.00941 days <br />0.226 hours <br />0.00134 weeks <br />3.093465e-4 months <br /> figure used for the extended run, is for Engineered Safety Feature (ESF) and Black Out (B/0) testing done before r.ngine disassembly.

8408210365 840814 PDR ADOCK 05000416 P

PDR d

',I 1

[-

August 14, 1984 Rarold R. Denton

. Page 2 Generator Load (KW)

Hours at Load

&% of Total (862.72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />) 7700 4.75 0.55 %

7000 656.58 76.11 %

6500 6.00 0.70 %

5000 1.00 0.12 %

4500 1.17 0.14 %

4100 1.10 0.13 %

4000 29.00 3.36 %

3000 0.25 0.03 %

(No Load) 162.87 18.88 %

Total -

862.72 100.00 %

77.36% of all hours run before the tear down inspection were above the new 5750 KW (185 BMEP) limit.

We hope that this information satisfies the NRC needs.

If we can be of further service, please inform us.

Very truly yours,

(

/

Hal B. Tucker, Vice President Nuclear Production HBT: RPM:rmm cc:

Mr. Jamer P. O'Reilly, Regional Administrator NRC Resident Inspector

-U.S. Nuclear Regulatory Commission Catawba Nuclear Station Region 7.I 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Melanie Miller, Project Manager Palmetto Alliance ONRR, U.S. Nuclear Regulatory Commission 2135 1/2 Devine Street Washington, D.C.

20555 Charleston, S.C. 29412 C.H. Berlinger ONRR, U.S. Nuclear Regulatory Commission Washington, D.C.

20555 2

l

August 14, 1984 Harold R. Denton Page 3 Robert Guild, Esq.

Atto rney-at-Law P.O. Box 12097 Charleston, South Carolina 29412 Mr. Jesse L. Riley Carolina Environmental Study Group 853 Henley Place Charlotte, North Carolina 28207 Walt Laity Pacific Northwest Laboratories P.O. Box 999 Battelle Blvd.

Richland, Washington 99352 bec: C.L. Hartzell - CNS K.S. Canady - WC-17 M.S. Tully - WC-8 R.O. Sharpe - WC-17 N.A. Rutherford - WC-17 J.W. Hampton - CNS R.C. Futrell - WC-11 J.M. McGarry - Washington, DC L.T. Parker C.J. Wylie - EC-0204 SREC D.G. Owen - EC-0205 NC MPA-1 J.M. Lines - EC-0203-4 NCEMC J.M. Curtis - EC-1220 Group File: CN-801.01 R.P. Muschick - WC-12 W.W. McCollough - CNS W.R. McCollum - CNS M.D. Gilmore - CNS M.R. McElwae - CNS L.E. Suther - EC-1119 J.M. Lambert - PB-3037 A.V. Carr - Legal-PB R.L. Gill - WC-17 C.W. Hallman - WC-12 W.H. Owen - PB-3 J.A. Corman - WC-12 3

--...