Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000387/LER-1984-035, :on 840718,turbine Control Valve Fast Closure Initiated by Low Condenser Vacuum Pressure Resulting in Reactor Trip.Caused by Actions Taken to Established Valve Lineup to Transfer Water Fuel Pool Tank + (13:42:52, 13 December 2024)
- ML20095E068 + (13:42:53, 13 December 2024)
- ML20095E066 + (13:42:54, 13 December 2024)
- ML20095E059 + (13:42:55, 13 December 2024)
- ML20095E064 + (13:42:55, 13 December 2024)
- ML20095E054 + (13:42:58, 13 December 2024)
- ULNRC-03302, Forwards Response to NRC 951023 RAI Re GL 92-08 Issues Related to Ampacity Derating + (13:42:59, 13 December 2024)
- ML20095E052 + (13:42:59, 13 December 2024)
- JPN-95-052, Withdraws Commitments Re Testing & Mod of APRM Downscale Scram Function at Plant + (13:43:00, 13 December 2024)
- ML20095E042 + (13:43:03, 13 December 2024)
- ML20095E038 + (13:43:05, 13 December 2024)
- 05000286/LER-1984-012-01, :on 840712,Westinghouse Advised of Potential Overpressure in Component Cooling Water Sys During Inleakage & Heat Load Increases Due to Tube Rupture.Relief & Vent Valves Modified to Ease Overpressure Concern + (13:43:07, 13 December 2024)
- ML20095E029 + (13:43:09, 13 December 2024)
- 05000374/LER-1984-040-01, :on 840725,during Review of Procedures, Discovered Drywell Crane Circuits Not Included in Tech Specs.Caused by Circuits Not Being Included in Tech Specs & Erroneous Investigation.Procedure Revised + (13:43:10, 13 December 2024)
- ML20095E021 + (13:43:12, 13 December 2024)
- ML20095E020 + (13:43:12, 13 December 2024)
- ML20095E009 + (13:43:13, 13 December 2024)
- ML20095E001 + (13:43:15, 13 December 2024)
- ML20095D998 + (13:43:16, 13 December 2024)
- FVY-84-101, Requests Extension Until 841101 for Responding to Generic Ltr 84-15 Re Diesel Generator Reliability.Delay Due to Extensive Engineering Efforts Associated w/8-wk 1984 Refueling Outage + (13:43:17, 13 December 2024)
- ML20095D982 + (13:43:17, 13 December 2024)
- ML20095D981 + (13:43:18, 13 December 2024)
- ML20095D980 + (13:43:19, 13 December 2024)
- ML20095D977 + (13:43:19, 13 December 2024)
- ML20095D951 + (13:43:20, 13 December 2024)
- ML20095D943 + (13:43:21, 13 December 2024)
- ML20095D935 + (13:43:22, 13 December 2024)
- ML20095D922 + (13:43:22, 13 December 2024)
- 05000483/LER-1984-018, :on 840718,fuel Bldg Isolation & Control Room Ventilation Isolation Signals Initiated from Radiation Monitoring Elements.Caused by Brief Voltage Abnormality During Bus Realignment.Design Change Requested + (13:43:24, 13 December 2024)
- ML20095D914 + (13:43:25, 13 December 2024)
- RBG-18526, Interim Deficiency Rept DR-217 Re Bolting Matls Supplied by Cardinal Industrial Products.Next Rept Will Be Submitted by 841017 + (13:43:27, 13 December 2024)
- 05000271/LER-1984-011, :on 840616,while Performing Type C Leak Rate Testing,Valves MSIV-86B,CRD-412A,PCAC V16-19-8,FDW-96A & CA-89C Found W/Seat Leakage Above Tech Spec Limits.Maint Performed & Valves Retested + (13:43:30, 13 December 2024)
- 05000374/LER-1984-039-01, :on 840719,at 80% Power,Pressure Switches 2E31-N022A,B,C & D Found out-of-tolerance in Nonconservative Direction.Cause Not Determined.Switches Recalibr & Will Be Replaced During Environ Qualification + (13:43:33, 13 December 2024)
- ML20095D899 + (13:43:34, 13 December 2024)
- 05000374/LER-1984-038-01, :on 840717,Door 430 to Reactor Water Cleanup HX B Room Left Open.Security Alerted But Checked Wrong Door. Door Immediately Secured on 840718.Engineering Controls Investigated + (13:43:36, 13 December 2024)
- 05000354/LER-1995-032, :on 951114,failed to Complete Flood Protection Actions within Required Timeframe,Resulting in TS Violation Due to Low Mgt Priority Placed on Resolving Watertight Door Problems Properly.Watertight Door Repaired + (13:43:40, 13 December 2024)
- 05000354/LER-1995-031, :on 951110,plant Shut Down Due to Inability to Perform Surveillance 4.6.2.1,drywell to Suppression Chamber Pressure Decay Test.Vacuum Breakers Will Be Tested & Testing Methodology Will Be Revised + (13:43:42, 13 December 2024)
- ML20095D865 + (13:43:43, 13 December 2024)
- 05000348/LER-1984-013, :on 840716,continuous Fire Watch Not Posted in Closed Cooling Water HX & Pump Room While Maint Personnel Performing Grinding & Welding Operations.Watch Posted & Maintained Until No Longer Required + (13:43:45, 13 December 2024)
- ML20095D861 + (13:43:47, 13 December 2024)
- ML20095D863 + (13:43:47, 13 December 2024)
- 05000327/LER-1984-047, :on 840717,high Radiation Signal Actuated, Causing Ventilation Isolation in Auxiliary & Containment Bldgs.Caused by Radiation Monitor Wire Slipping Onto Power Supply,Tripping Breaker.All Equipment Reset + (13:43:49, 13 December 2024)
- ML20095D832 + (13:43:57, 13 December 2024)
- 05000272/LER-1984-017-01, :on 840716,insp Revealed Metal Filings in Charging Pump Casings.Filings May Have Caused 840713 Seizure of Charging Pump 12 & Seizure of Redundant Centrifugal Charging Pump.Investigation Continuing + (13:43:59, 13 December 2024)
- 05000254/LER-1984-014-04, :on 840808,while Starting Shutdown Cooling Mode of RHR Sys,Lpci Valves 1-1001-29A & B Would Not Open. Caused by Personnel Error.Valve Stems Removed & Being Replaced + (13:44:01, 13 December 2024)
- ML20095D815 + (13:44:03, 13 December 2024)
- ML20095D807 + (13:44:06, 13 December 2024)
- 05000275/LER-1984-021, :on 840720,reactor Protection Sys Actuated Due to Coincidence of Steam Generator 1-3 Low Level & Steam Flow/Feed Flow Mismatch.Caused by Failed Valve Operator. Valve Operator Replaced + (13:44:10, 13 December 2024)
- ML20095D761 + (13:44:12, 13 December 2024)
- ML20095D739 + (13:44:12, 13 December 2024)
- ML20095D734 + (13:44:13, 13 December 2024)
- ML20095D689 + (13:44:14, 13 December 2024)