Text
.
~ - - -
Electnc POWER COMPANY m w Mcugm po su no wwasee w 53M
!M2'mt VPNPD-92-153 10 CFR 50.4, 50.59, 50.90 NRC-92-042 April 16,_1992 U.S.
NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station F1-137 Washington, D.C.
20555 Gentlemen:
QQ. felt 50-266 AND 50-301 Q
MODIFICATIQ]i_,T.Q TECH GPEC CHAlLGE REOUEST 149 MAIR_ STEAM SYSTEM VALVE TEETING AED,_QPERADIL1H POIN_T.JEAp.11,LLCLEAR PLANT o__ UNITS 1 lWJ2._2 By letter dated February 21, 1992, Wisconsin Electric Power Company, Licensee for Point Beach Nuclear Plant, Units 1 and 2, requested amendments to Facility Operating Licenses DPR-24 and DPR 27, respectively, to incorporate and clarify limiting conditions for operation (LCOs) and surveillance requirements for the main steam stop valves (MSSVs) and main steam non-recucn check valves (NRCVs) in our Technical Specifications.
Upon review of our application, we determined that a modification to our Technical Specification Change Request wa.s required to further clarify _ proposed Specification 15.3.4.D.
Proposed. Specification 15.3.4.D defines LCOs for the NSSW and NRCVs.
The proposed specification would allow power operation to
-continue for up to four hours with an inoperable MS3V or NRCV.
An additional six ' ours would be allowed to place the reactor in a hot shutdown condition.
Operation in the hot shutdown condition would be al3osTd to continue as long as the inoperabin valvo remains closed.
'Ite specification also provides relaxation of the requirement to malhtain the inoperable valve in the closed e
position to allow opening for testing to confirm operability.
Specification 15.3.4.D, as defined in our Feoruary 21, 1992, submittal, authorizes opening of an inoperable MSSV for testing
,a
.oa:
while in tae LCO condition.
The proposed change does not 4d$$
specifically authorize the opening of an inoperable URCV for l
$@ _g
, opening of an inoperable NRCV for testing to confirm operability.
testing under the same conditions.
It is out intent to allow LM We, therefore, request the last sentence of the proposed
. No specification be_ modified to read, "An inoperable main steam stop valve or non-return check valve may, howner, be opened in the Q
hot-shutdown conditier for the performance of terating to confirm
)
o a:
operability."
A Technical Specification page with proposed g1
,h l-
$$n.
Specification 15.3.4.D, es modified by t is submittal, is attachedj ';(j ]
]
I(
i ASilkd.5FW$lblMWH NN'GT narp*Un$47
. _ -~ _
~-
_.4.__m 4
- a NRC Document Control Desk April 16, 1992
'Page 2 We have reviewed our analysis of the proposed changes in our L
February 21, 1992, application.
Our analysis of the propc3ed I
changes asaumed that the defined LCOs for the MSSVs and NRCVc were identical.
This moditication to our application ensures the LCOs are,_in fact, identical; and the analysis remains
- applicable.
l We have also reviewed the "No Significant Hazards Daterminati.on" i
included as Enclosure 1 to our February 21, 1992, application.
Proposed Specification 15,.3.4.D as contained in our February 21, 1992, submittal-and modified by this submittal presents additional restrictions on plant operations not previously 3
contained in the Technical Specifications.
The operating philosophy of assur!.nq valve operability -is not changed by this submittal and may be enhanced.
Therefore, the "No Significant L
Hazards Determination" and conclusions contained in our February 21, 1992, subrittal apply to this modification to our
- =
application.
Operation of Point Beach Nuclear Plant in accordance witn the proposed amendments does not result in a j
significant hazard.
We request that this modification to our February 21, 1992, application be accepted.
If you have any qu istions, please contact us.
Sincerely,
//
sHr j
,-4
' v %. :. 3 - w\\
I v
l Jam's J.
Zach l
Vic"e President Nuclear Power
' Attachment Copien to NRC Regional Administrator, Region III J
NRC iesident Inspector L
Mr. L L. Smith, PSCW i
l-Subscri d and sworn before me
. this 16 -day of,d x 1992.
u Jf gqg rps W r^==
I Ilotary Public, State of Wisconsin My Commission expires db JUE 3 I.
L L
l
..