Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000331/LER-1992-004, :on 920322,intrusion of Carbon Dioxide Into Control Room Occurred Which Led to Unacceptable Reduction in Area Oxygen Levels.Caused by Overpressurization of Cable Spreading Room.Addl Vent Path Provided + (13:30:25, 13 December 2024)
- ST-HL-AE-4064, Special Rept:Discovered That Tendon Filler Grease Voids Exceeded Surveillance Requirement 4.6.1.6.1.d.2 Max of 5% Net Duct Vol.Caused by Spaces in Tendon Bubble.Adequate Grease Protection Exists for Tendons + (13:30:26, 13 December 2024)
- ML20095G409 + (13:30:27, 13 December 2024)
- ML20095G410 + (13:30:27, 13 December 2024)
- ML20095G404 + (13:30:28, 13 December 2024)
- ML20095G405 + (13:30:28, 13 December 2024)
- 05000456/LER-1995-016-04, :on 951117,RT Was Inserted During Drpi Operability Testing Due to Blown Stationary Gripper Fuse in Cbb for Rod K-12.Tested Indicator & Fuse FU19 W/Ohmmeter & Found Open + (13:30:36, 13 December 2024)
- ML20095G395 + (13:30:37, 13 December 2024)
- BSEP-95-0632, Responds to Violations Noted in Insp Repts 50-324/95-20 & 50-325/95-20.Corrective actions:1-E11-PDV-F068A & 2-E11-PDV-F068B Valves Reassembled w/Nickel-Aluminum-Bronze Retainers & Inconel 625 Plugs + (13:30:38, 13 December 2024)
- 05000317/LER-1995-005-01, :on 951109,manual Reactor Trip Occurred Due to Increasing SG 11 Water Level.Caused by Failure of Digital Control Module FIC-1111.Controller Sent to Vendor for Troubleshooting & Root Cause Analysis + (13:30:40, 13 December 2024)
- 05000317/LER-1995-006, :on 951116,manual Reactor Trip Occurred Due to Loss of 12 SG Feed Pump.Caused Oil Losses Allowing Pressure to Drop Before Standby Pump Could Restore Pressure.Trip Mechanism & Thrust Cleaned & Adjusted + (13:30:42, 13 December 2024)
- ML20095G349 + (13:30:44, 13 December 2024)
- ML20095G299 + (13:30:44, 13 December 2024)
- ML20095G276 + (13:30:45, 13 December 2024)
- ML20095G270 + (13:30:46, 13 December 2024)
- ML20095G254 + (13:30:47, 13 December 2024)
- HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant + (13:30:48, 13 December 2024)
- BSEP-95-0574, Provides Suppl Response to GL 94-02, Long Term Solutions & Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Bwrs + (13:30:49, 13 December 2024)
- ML20095G247 + (13:30:49, 13 December 2024)
- ST-HL-AE-5231, Responds to NRC Ltr Re Violations Noted in Insp Repts of Licenses NPF-76 & NPF-80.Corrective Actions:Submitted Response to Demand for Info EA-93-043 + (13:30:50, 13 December 2024)
- ML20095G225 + (13:30:51, 13 December 2024)
- ML20095G217 + (13:30:51, 13 December 2024)
- ML20095G213 + (13:30:52, 13 December 2024)
- NG-95-3442, Forwards Rev 1 to Cycle 14,COLR, for Duane Arnold Energy Ctr + (13:30:53, 13 December 2024)
- ML20095G203 + (13:30:54, 13 December 2024)
- ML20095G201 + (13:30:55, 13 December 2024)
- ML20095G198 + (13:30:56, 13 December 2024)
- ML20095G200 + (13:30:56, 13 December 2024)
- ML20095G182 + (13:31:01, 13 December 2024)
- ML20095G166 + (13:31:02, 13 December 2024)
- ML20095G163 + (13:31:07, 13 December 2024)
- ML20095G153 + (13:31:08, 13 December 2024)
- ML20095G150 + (13:31:08, 13 December 2024)
- ML20095G145 + (13:31:10, 13 December 2024)
- ML20095G137 + (13:31:11, 13 December 2024)
- ML20095G118 + (13:31:12, 13 December 2024)
- ML20095G128 + (13:31:12, 13 December 2024)
- ML20095G108 + (13:31:13, 13 December 2024)
- ML20095G096 + (13:31:14, 13 December 2024)
- ML20095G095 + (13:31:14, 13 December 2024)
- 3F0492-02, Forwards Rev 13 to Crystal River Unit 3,ASME Section XI Pump & Valve Program Inservice Insp, Per Generic Ltr 89-04 + (13:31:15, 13 December 2024)
- ML20095G091 + (13:31:15, 13 December 2024)
- ML20095G086 + (13:31:16, 13 December 2024)
- ML20095G079 + (13:31:18, 13 December 2024)
- ML20095G075 + (13:31:19, 13 December 2024)
- NRC-95-0095, Monthly Operating Rept for Nov 1995 for Fermi 2 + (13:31:19, 13 December 2024)
- 05000249/LER-1984-007-07, :on 840722,turbine Bypass Valve 1 Operated Erratically,Causing Group 1 Isolation on Main Steam Low Pressure.Caused by Failure of Servovalve (Model 450-1880) Mechanism for Opening & Closing Valve + (13:31:21, 13 December 2024)
- ML20095G069 + (13:31:22, 13 December 2024)
- ML20095G061 + (13:31:23, 13 December 2024)
- ML20095G063 + (13:31:23, 13 December 2024)
- ST-HL-AE-4081, Forwards Change Notice QA-006 for Rev 5 to Chapter 1.0 of Operations QA Plan,Organization + (13:31:24, 13 December 2024)
- ML20095G060 + (13:31:24, 13 December 2024)