NRC-95-0095, Monthly Operating Rept for Nov 1995 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1995 for Fermi 2
ML20095G073
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/30/1995
From: Giles H, Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-95-0095, CON-NRC-95-95 NUDOCS 9512200008
Download: ML20095G073 (4)


Text

. -. - -

,.=x

-.i n,

a

.-..an

-_s_~

= _ _,.. _ _. _

e e'

Douglas R. Gipson Senor Vu:e President Nuclear Generahon Detroit r., m 6400 North Dme Highway Edison -(313)5865249

~-

Reg Guide 1.16 December 15,1995 NRC-95-0095 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D. C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operatine Status Report for November.1995 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for November,1995. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Harry Giles, at (313) 586-1522.

Sincerely, Enclosure cc:

T. G. Colburn D. R. Hahn M. J. Jordan H. J. Miller A.

Vegel M. V. Yudasz, Jr.

Region III 9512200000 951130 PDR ADOCK 05000341 fgP i

',I

~-

(

i

'V OPERATING DATA REPORT i

DOCKET NO. 50-341 COMPLETED BY H. B. Giles DATE December 15.1995 TELEPHONE (313)586-1522 OPERATING STATUS 1.

Unit name: Fermi 2 NOTES: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER). (2) Currently limiting power to 96%

2.

Reporting period: November.1995 CTP maximum for Startup Test Program.

3.

Licensed thermal power (Mwt): 3430 Nameplate and DER ratings reflect 98% CTP 4.

Nameplate rating (Gross Mwe): 1179 due to turbine throttle valve limitations.

5.

Design elect rating (Net Mwe): 1116 6.

Max dependable cap (gross Mwe): 924 7.

Max dependable cap (Net Mwe): 876 8.

If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A 9.

Power level to which restricted, if any (Mwe Net):

96% CTP/3293 MWT

10. Reasons for restriction,if any:

(2)

THIS MONTH YEAR TO CUMULATIVE DATE 11.

Hours in reporting period 720 8.016.0 68.846.0 12.

Hours reactor was critical 720 6.872.0 47.607.6 1.3.

Reactor reserve shutdown hours 9

9 0

14.

Hours generator on-line 720 5.767.9 44.892.3 15.

Unit reserve shutdown hours Q

Q Q

16.

Gross thermal energy gen (MWH) 2.330.304 17.634.504 137.348.555 17.

Gross elect energy gen (MWH) 652.250 4.788.760 44.762.717 18.

Net Elect energy gen (MWH) 621.966 4.534.599 42.768.314 19.

Unit service factor 100.0 72.0 65.2 20.

Unit availability factor 100.0 72.0 65.2 21.

Unit cap factor (using MDC net) 98.6 64.6 59.1 (!)

22.

Unit cap factor (using DER net) 77.4 102 56.4 (1) 23.

Unit forced outage rate Q

26.0 2jl

24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each):
25. If shutdown at end of report period, estimated date of startup:
26. Units in test status (prior to commercial operation):

FORECAST ACHIEVED Initial Criticality N/A N/A Initial Electricity N/A N!/A Commercial Operation N/A N/A B

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT Fermi 2 DATE December 15.1995 COMPLETED BY H. B, Giles TELEPHONE (313)586-1522 Month November.1995 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe Net)

(MWe-Net) 1 882 17 879 2

880 18 879 3

841 19 879 4

571 20 879 5

721 21 879 6

881 22 880

~

7 881 23 879 8

882 24 879 9

881 25 879 10 880 26 879 11 880 27 Sd6

~

12 881 28 889 13 881 29 880 14 881 30 880 15 880 16 874

UNIT SIIUTDOWNS AND POWER REDUCTIONS i

DOCKET NO. 50-341 DATE December 15.1995

[,

UNIT NAME Fermi 2 COMPLETED BY H. B. Giles TELEPIIONE (313) 586-1522 REPORT MONTil November.1995 No. (6)

Date TYPE Dur (IIrs)(7)

Reason (2)

Method of LER Sys Code (4)

Comp Cause and Corrective (1) shutting down No.

Code Acticn to Prevent reactor or reducing (5)

Recurrence power (3)

R95-13 951103 S

0 B

5 N/A AA ROD Reduce Rx power to 65% for control rod drive scram time testing, scram solenoid pilot valve work.

(1)

F: Forced (2)

REASON:

(3) METIIOD:

(4) Instmetions for preparation of data S: Scheduled A - Equipment Failure (Explain) 1 - Manual enty sheets for Licensee Event Report B - Maintenance or Test 2 - Manual Scram (LER) file (NUREG-1022)

C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued (5) Same Source as (4)

E - Operations Training and 5 - Reduced Load License Examination 9 - Other (6) R - Prefix indicates power reduction.

F-Administrative S - Prefix indicated plant shutdown.

G - Operational Error (Explain)

II - Other(Explain)

(7) Duration of reductions reported as zero per regulatory guide 1.16 Revision 4 i

.