ML20095G213

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 50-261/84-19.Corrective Actions:Regulatory Compliance Instruction for Preparing Correspondence Implemented & Investigation of Circuit Conducted to Identify Occurrence
ML20095G213
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/19/1984
From: Morgan R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20095G208 List:
References
RSEP-84-488, NUDOCS 8408270521
Download: ML20095G213 (3)


Text

5-

. .a o [=f a c

, 3 g gpgg

. Carolina Po_wer & Light Company

.H. B. ROBINSON-STEAM ELECTRIC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 JUL 191984 Robinson File No: 13510E Serial: RSEP/84-488 Mr.-James P.- 0'Reilly Regional Administrator U. S.~ Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

-Atlanta, Georgia 30323 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261

-LICENSE NO. DPR-23 IE INSPECTION REPORT IER-84-19

Dear Mr. O'Reilly:

f

. Carolina Power and Light Company (CP&L) has received and reviewed the subject report and provides.the following response.

A. Severity Level IV Violation (IER-84-19-04-SL4) 10 CFR 50.73 requires the licensee to submit to the NRC a written report of any event of a type described in the regulation. This report shall include a description of any corrective actions planned or taken.

Contrary to the above, your Licensee Event Report 84-02, dated May 25, 1984, erroneously stated that fire dampers had been properly labeled as a corrective action to-prevent recurrence. In fact, as of May 30, 1984, all fire dampers had not been labeled.

Response

1. Admission or Denial of the Alleged Violation CP&L acknowledges the alleged violation.

pp O DR .

G

.  :~

, .,Ldttsr to Mr. James-P. O'Railly

,. Sariali RSEP/84-488

.Page 2-of 3

2. Reason for the Violation The initial information used in preparing the Licensee Event Report (LER) stated that the fire dampers would be labeled to prevent recurrence of the_ violation. Prior to submitting the LER, the status of the labeling was checked. There was a verbal miscommunication that the' labeling effort was complete when, in fact, it was still in progress. The LER was reviewed by the appropriate personnel; however, the statement that said labeling was completed was not recognized as an error.
3. Corrective Steps Which Have Been Taken and Results Achieved A Regulatory Compliance instruction for preparing NRC. correspondence at H. B. Robinson has been implemented. . This requires a Response Input Verification form to be completed for outgoing NRC correspondence. This is in addition to the normal management review process. The person preparing the information for the response and a second person verifying the information to be correct. attest to its accuracy on the Response Input Verification Form. This Regulatory Compliance instruction is the process described in Carolina Power and Light Company's June 21, 1984, response to IER-84-10 to ensure a complete review of outgoing correspondence.

The appropriate fire dampers were subsequently labeled as stated by the NRC inspector in the inspection report.

4. Corrective Secps Which Will be Taken to Avoid Further Violation The above instruction will be utilized for future correspondence to NRC. This additional control substantially reduces verbal-miscommunication and improves the accuracy of information transmitted to the NRC which should prevent a recurrence of this violation.
5. Date When. Full Compliance Will be Achieved Full compliance has been achieved.

B. Severity Level IV Violation (IER-84-19-01-SL4)

Technical Specification 6.5.1.1.1.c requires that written procedures be-established and implemented for surveillance activities on safety related equipment. Surveillance procedures MST-010 EST-003, and EST-014 were established by the licensee to test automatic actuation circuitry associated with engineered safety features.

Contrary to the above, as of June 8,1984, adequate surveillance procedures had not been established in that these procedures did not verify complete circuit continuity for initiation of safety injection on high steam line flow coincident with low steam line pressure or low average temperature. Specifically, contact 4-8 of relay SL 1 was not tested.

l l

. =_ .. ._ . __ _ .. . . _ _. _. , . . __ _

1*A  : .- .

i' ... ;Lsttar to Mr. James P._0'Railly

, # *.Sarials RSEP/84-488

Page 3 of.3

Response

1. Admission or Denial of the Alleged Violation CP&L acknowledges the alleged violation.

2.. ' Reason for the Violation When the functional tests were initially written, verification of the output from the system was adequate.to demonstrate system operability. -Over the years, a functional test has been redefined as including testing of all components.in the current path. _The functional test of this circuit was not upgraded to this new

' . understanding of functional test.  ;

R 3. Corrective Steps Which Have Been Taken and Results Achieved b An invcatigation of this circuit and'other similar circuits was conducted to identify any similar occurrence. The results of that

{I -

. Investigation was reported in Licensee Event Report LER-84-005.

4. Corrective' Steps Which Will be Taken to Avoid Further Violatiod I

.As stated in LER 84-005, th'e equipment identified that is currently not properly functionally tested will be properly tested prior to declaring the equipment operable.-

5.- Date When Full Compliance Will be Achieved Full compliance will be achieved when the required testing is

-completed prior to declaring ~the respective equipment. operable.

C. Severity Level V Violation (IER-84-19-02-SL5)

Your cover letter stated " Corrective action to prevent recurrence for Violation C was completed prior to the conclusion of this inspection;'_'

,therefore, a reply is not requested.

if you have any questions concerning this response, please contact me or my staff.-

Very truly yours,

, R. E. Mor General Manager

> H. B.:Robison S. E. Plant