Forwards Monthly Operating Repts for Nov 1995 for San Onofre Nuclear Generating Station Units 2 & 3 & Revised Repts for May-Oct 1995
ML20095G395
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/14/1995
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095G399 List:
References
NUDOCS 9512210005
Download: ML20095G395 (1)


Text

.._

f[8 Southem Califomia Edison Company P. O. BOX 128 SAN CLEMENTE. CALIFORNIA 92674 0128 December 14, 1995 WALTER C, MARSH TELEPHONE MANAGER OF NUCLEAR REGULATORY AFFAIRS (714) 368-750 t U.

S.

Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for November 1995~

San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively,' requires Edison to provide a Monthly Operating Report for each. Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Dose Calculation Manual (ODCM); and any major changes to the radioactive waste treatment system.

All covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the time the changes are effective.

This letter transmits the November 1995 Monthly operating Reports for Units 2 and 3, respectively.

There were no challenges to safety valves, no major changes to the Units 2 and-3 radioactive waste treatment systems, and no changes to the ODCM during the reporting period.

As a separate item, Edison noted an omission in the May, 1995, Unit 2 Monthly Operating report.

The value for " Number of Hours Reactor was Critical" omitted a few days of non-power operation.

Attachment III to this letter provides a corrected page for May, and corrected pages for the months thereafter.

If you require any additional information, please let me know.

i Sincerely, h0 Enclosures i

cc:

L.

J. Callan, Regional Administrator, NRC Region IV i

J.

E.

Dyer, Director, Division of Reactor Projects, NRC Region IV l

K.

E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. B.

Fields, NRC Project Manager, Units 2 and 3 J. A. Sloan, Senior NRC Resident Inspector, San Onofre Units 2 & 3 b