Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096C967 + (13:03:44, 13 December 2024)
- ML20096C954 + (13:03:46, 13 December 2024)
- ML20096C947 + (13:03:47, 13 December 2024)
- 05000458/LER-1995-013-01, :on 951215,RCIC Div 1 Isolation Occurred Due to Failed Transmitter.Faulty Transmitter Replaced + (13:03:48, 13 December 2024)
- ML20096C933 + (13:03:50, 13 December 2024)
- ST-HL-AE-4087, Special Rept:On 920409,channels a & C of Reactor Vessel Water Level Indication Sys (Rvwlis) Inoperable.Caused by Type of Copper Wiring Used in Circuit.Rvwlis Probes for Channels a & C Replaced + (13:03:50, 13 December 2024)
- ML20096C924 + (13:03:51, 13 December 2024)
- ML20096C916 + (13:03:52, 13 December 2024)
- ST-HL-AE-4094, Special Rept:On 920408,SDG 21 Tripped When Released from Emergency Mode.Cause Has Not Been Determined.Further Analysis & Investigation Performed on Sdg 21.Supplemental Rept Will Be Submitted by 920730 + (13:03:53, 13 December 2024)
- ML20096C913 + (13:03:53, 13 December 2024)
- ML20096C912 + (13:03:54, 13 December 2024)
- HL-2221, Monthly Operating Repts for Apr 1992 for Ei Hatch Nuclear Plant,Units 1 & 2 + (13:03:57, 13 December 2024)
- ML20096C908 + (13:03:58, 13 December 2024)
- 05000395/LER-1984-032, :on 840729,during Reactor Startup,Reactor Tripped from 60% Power Due to lo-lo Steam Generator B Level. Caused by Erratic Operation of Main Feedwater Control Valve IFV-488-FW Vol Booster Deadband Adjustment + (13:04:00, 13 December 2024)
- ML20096C904 + (13:04:01, 13 December 2024)
- ML20096C895 + (13:04:02, 13 December 2024)
- ML20096C894 + (13:04:03, 13 December 2024)
- ML20096C890 + (13:04:04, 13 December 2024)
- ML20096C893 + (13:04:04, 13 December 2024)
- ML20096C879 + (13:04:06, 13 December 2024)
- ML20096C887 + (13:04:06, 13 December 2024)
- 05000413/LER-1984-002-04, :on 840728,computer Software Problem Discovered During Analysis of Concentration of Radioactive Matl in Waste Monitor Tank Liquids.Cause Not Stated.Software Problem Corrected + (13:04:08, 13 December 2024)
- 05000416/LER-1984-036, :on 840727,channels a & B of Reactor Water Cleanup Sys Differential Flow Isolation Trip Found to Exceed Tech Spec Setpoint Limits.Caused by Change in Calibr Data. Surveillance Will Be Completed by Startup + (13:04:10, 13 December 2024)
- U-602537, Forwards Reissued NPDES Permit for Clinton Power Station + (13:04:11, 13 December 2024)
- 05000277/LER-1984-016, :on 840727,liquid Penetration Exams of Reactor Pressure Vessel Jet Pump Inlet Riser Safe Ends Revealed crack-like Indications.Caused by Igscc.Addl Radiographic & Liquid Dye Penetrant Exams Will Be Performed + (13:04:13, 13 December 2024)
- ML20096C855 + (13:04:14, 13 December 2024)
- ML20096C848 + (13:04:15, 13 December 2024)
- ML20096C849 + (13:04:15, 13 December 2024)
- 05000346/LER-1984-005, :on 840507,both Control Room Emergency Ventilation Chiller Control Power Switches Found in Off Position.Caused by Personnel Error.Labels Placed Above Switches for Clear Identification + (13:04:18, 13 December 2024)
- ML20096C842 + (13:04:19, 13 December 2024)
- ML20096C843 + (13:04:19, 13 December 2024)
- 05000412/LER-1992-005-01, :on 920409,sound of Air Flow in East Cable Vault Room Heard & Temporary Seal on Spare Electrical Penetration Leaking Air Out of Containment.Caused by Procedure Deficiency.Cabling Removed + (13:04:21, 13 December 2024)
- ML20096C836 + (13:04:22, 13 December 2024)
- ML20096C831 + (13:04:23, 13 December 2024)
- ML20096C829 + (13:04:24, 13 December 2024)
- ML20096C828 + (13:04:24, 13 December 2024)
- 05000265/LER-1992-009-03, :on 920327,RHR Sys Pumps 2C & 2D Autostarted During Relay 10A-K17B Testing.Caused by Personnel Using Incorrect Work Package Instructions to Direct Placement of Jumper.Work Package Revised + (13:04:27, 13 December 2024)
- ML20096C821 + (13:04:29, 13 December 2024)
- ML20096C813 + (13:04:30, 13 December 2024)
- ML20096C808 + (13:04:30, 13 December 2024)
- ML20096C806 + (13:04:34, 13 December 2024)
- ML20096C805 + (13:04:35, 13 December 2024)
- ML20096C803 + (13:04:35, 13 December 2024)
- ML20096C797 + (13:04:36, 13 December 2024)
- ML20096C794 + (13:04:37, 13 December 2024)
- ML20096C796 + (13:04:37, 13 December 2024)
- LIC-96-0004, Monthly Operating Rept for Dec 1995 for Fort Calhoun Station + (13:04:38, 13 December 2024)
- ML20096C787 + (13:04:39, 13 December 2024)
- ML20096C791 + (13:04:39, 13 December 2024)
- ML20096C784 + (13:04:40, 13 December 2024)
- BVY-92-053, Monthly Operating Rept for Apr 1992 for Vermont Yankee Nuclear Power Station + (13:04:41, 13 December 2024)