ML20096C794

From kanterella
Jump to navigation Jump to search
NPDES Noncompliance Notification:On 840725,turbine Room Sump Process Ph Meter Found Inoperable.Cause Not Stated.Sump Controlled Manually & Allowed to Discharge to Absorption Pond Following Satisfactory Grab Sample
ML20096C794
Person / Time
Site: Cook  
Issue date: 08/21/1984
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8409050401
Download: ML20096C794 (2)


Text

I c

o.

y,t syst n.IN0 LANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458. Bridgman Michigan 49106 (616) 465-5901 August 21, 1984 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58/74 Docket Nos. 50-315/50-316

Dear Mr. Keppler:

Pursuant to the requirements of Appendix B, Part II, Nonradiological, Environmental Protection Plan, Section 3.2, a copy of the report to the Michigan Water Resources Commission notifying them of the Turbine Room Sump Process pH Meter being rendered inoperable on July 25, 1984, is attached.

This report is required by Amendment No. 54 to Facility Operating License No.

DPR-58 and Amendment No. 40 to Facility Operating License No.

DPR-74 dated May 6, 1982.

Sincerely, LV

'k W.G. Smith, Jr.

Plant Manager

/bab Attachment cc:

John E. Dolan INPO M.P. Alexich Dir., IE R.F. Kroeger Dir., MIPC H. Brugger PNSRC E.R.

Swanson, RO:III R.C. Callen, MPSC G. Charnoff, Esq.

J.M. Hennigan H.R. Denton, NRC R.O. Bruggee, EPRI E.L. Townley AUG241g p

J.F. Stietzel 8409050401 840821

/

PDR ADOCK 05000315 4

(

6 PDR I

l

(,' '. lgsy e 4.1 i.

QM

,k;~;-dra: ana a mCHIGAN ELECTRIC COMPANY p.

ONE SUMMIT SoVARE. P.O. box 60. FORT WAYNE, IN. 46801 Telephone (219) 425 2111

'~

July 30, 1984 AuG 011984 Paul D. Zugger, Executive Secretary IC0hniC3I 00p!.

Water Resources Commission P.O. Box 30028 Lansing, Michigan 48909 Re: Donald C. Cook Nuclear Plant Michigan Permit No. M00064 Groundwater Limitations

Dear Mr. Zugger:

At 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />, July 25, 1984, the continuously monitoring turbine room sump pil meter was found inoperative.

While repairs were being made, the turbine room sump was manually controlled and allowed to discharge to the plant's absorption pond only after a grab sample verified the pH to be kithin permit limits.

The meter was returned to service at 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br />, July 25.

Very truly yours, l

w fa

/ Jack A. Druckemiller Manager of Environmental Affairs JAD/be cc:

W. G. Smith I

l bc:

R. W. Jurgen:.on l

Tf*A? Kriesel J. A. W ojcik' R. W. Reeves /CE. Itawk i

J. P. White l

R. E. Zahler J