ML20096C803

From kanterella
Jump to navigation Jump to search
Forwards Epips,Including Rev 5 to Emergency Procedure EP R-4, High Radiation (In-Plant),Rev 13 to EP M-4, Earthquake & Rev 9 to EP EF-3, Activation & Operation of Eof. W/920504 Release Memo
ML20096C803
Person / Time
Site: Diablo Canyon  
Issue date: 03/17/1992
From: Hodgdon A
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20096C804 List:
References
NUDOCS 9205140295
Download: ML20096C803 (3)


Text

_-.

o-j;h" f.4 G WO PaClliC Gas sad ECCtfic COfDP38V j

gpy, f., n D '

t smu en March 17. 1992 s.

PG&C Letter No. DCL-92-064 4

/

U.S. Nuclear Regulatory Comission

/

ATTN: Document Control Desk Washington, D.C.

20555 Docket No.,50-275, OL-DPR-80 Re:

Docket No. 50-323, DL-DPR-82

~

Diablo Canyon Units I and 2 Emergency Plan Implementing Procedures Uodate Gentlemen:

R 50 In accordance with Section V " Implementing Procedures," of 10 CI:

Appendix E PG&E is submitting one copy of t Two copies of the update are being Emergency Plan (Enclosure 2). submitted to the NRC, Region V

~

to the NRC Resident Inspector.

This update contains some privacy / proprietary i in Enclosure 1.

Sincerely,

' ~

/4 4+1i (M

John H. Giscion s.

'ce':

Ann' P., Hodgdon (w/ene cover only)

John B. Hartin (2) l Harry Rood (w/ene cover only) j H*> ward J. Wong l

Enclosure L

56835/85K/ERK/1345 a7(,

cS cwns I

9205140295 920317 PDR ADOCK 05000275 F,,

ppg

-